Wheel loader - 6.0 Ton Wheel Loader 966

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


Performance

1

rated load

6000kg

2

overall weight

17900kg

3

rated bucket capacity

3.5m 3

4

maximum tractive force

152KN

5

maximum breakout force

≥ 170KN

6

maximum grade ability

30 ℃

7

maximum dump height

3150mm

8

maximum dump reach

1250mm

9

overall dimension (L × W × H)

7920 × 3050 × 3400mm

10

minimum turning radius

6640mm

Engine

11

model

Weichai Steyr WD615

12

type

lnline water cooling dry cylinder injection

13

No. of cylinder-bore/stroke

6 - 126 × 130mm

14

rated power

175kw--2400r/min

15

maximum torque

860N.m

16

min fuel-consume ratio

≤ 215g/kw.h

Transmission system

17

torque converter

YJ375

18

gearbox mode ( WG180 )

Power shift normally engaged straight gear

19

gear shift

4 forward shift

8/15/23 /38

4reverse shift

8/15/23 /38

20

maximum speed

38km/h

Drive axles

21

main reducing spiral

bevel gear grade 1reduction

22

decelerating mode

planetary reduction,grade 1

23

wheel base (mm)

3200mm

24

wheel tread

2250mm

25

minimum ground clearance

450mm

Hydraulic system

26

system working pressure

18MPa

27

boom lifting time

5.95 ± 0.2s

28

total time

10.95 ± 0.5s

29

fuel tank capacity

300L

30

function of leveling automatically

yes

 

Brake system

31

service brake

air over hydraulic disc brake on 4 wheels

32

parking brake

manual parking brake

Tyre

33

type specification

26.5-25

34

front tyre pressure

0.4Mpa

35

rear tyre pressure

0.35Mpa


A loader is a type of tractor, usually wheeled, sometimes on tracks, that has a front-mounted square wide bucket connected to the end of two booms (arms) to scoop up loose material from the ground, such as dirt, sand or gravel, and move it from one place to another without pushing the material across the ground. A loader is commonly used to move a stockpiled material from ground level and deposit it into an awaiting dump truck or into an open trench excavation.

 

The loader assembly may be a removable attachment or permanently mounted. Often the bucket can be replaced with other devices or toolsfor example, many can mount forks to lift heavy pallets or shipping containers, and a hydraulically opening "clamshell" bucket allows a loader to act as a light dozer or scraper. The bucket can also be augmented with devices like a bale grappler for handling large bales of hay or straw.

 

In construction areas loaders are also used to transport building materials - such as bricks, pipe, metal bars, and digging tools - over short distances.

 

Front loaders are commonly used to remove snow especially from sidewalks, parking lots, and other areas too small for using snowplows and other heavy equipment. They are sometimes used as snowplows with a snowplow attachment but commonly have a bucket or snowbasket, which can also be used to load snow into the rear compartment of a snowplow or dump truck.

 

High-tip buckets are suitable for light materials such as chip, peat and light gravel and when the bucket is emptied from a height.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The depreciation period and depreciation rate of the loader
(3) appliances, tools, furniture and so on related to the production and operation activities, for 5 years;(4) aircraft, trains, ships and other means of transport for 4 years;(5) electronic equipment, for 3 years.2. The depreciation period of the loader shall be 10 years, and the salvage value is 5%.Annual depreciation (= the original value of fixed assets is expected to use the residual value) / estimated lifeThe annual depreciation rate = annual depreciation / fixed assets *100%Monthly depreciation rate = annual depreciation rate /12
Q:Operation method of wood loader
The operation method of wood loader, the preparatory work that should be done before loader work, refer to the relevant regulations of excavator. Loaders in the work should pay attention to the following safety matters: 1, brakes, speakers, steering machines should be complete and sensitive, in driving to comply with: "traffic rules."". 2 when the loader is working with the dump truck, the dump truck should not pass under the bucket when loading. 3, loaders in full bucket travel, bucket should not be raised too high, generally about 0.5 meters from the ground is appropriate. 4. The loader should avoid improper high speed and sharp turn when driving. 5, when the loader encountered resistance increases, tires (or tracks) skid and engine speed down and other phenomena, should be stopped shovel installed, shall not be forced to operate. More wood related equipment can search [2019] swarm intelligent sawdust machine, fast to find, I put 6 in the downhill, prohibited loader coasting in neutral. 7, loader in operation, under the arm of the arm, no one stand or pass. 8 when the loading boom is raised, the safety pin must be fitted or other measures taken to prevent the falling of the arm. 9, loader in the work should pay attention to any time to remove the tire (or track) between the stone slag. 10, night work, fashion machines and workplaces should have good lighting.
Q:Which brand is the best for a small loader in Laizhou?
If the light of Laizhou, there are 150-200 regular manufacturers, but asked all brands about 500. More famous, not only Lu Gong, Lai Gong workers, the two have done early, but Lai Gong and Lu workers of the car is too old, technical innovation can not keep up.More famous manufacturers to add to you:Ming Yu heavy vehicle appearance beautiful, quality is good, but the model is smaller than the same type of car, small self-respectShandong heavy industry belongs to the rising star, the appearance of the vehicle is not bad, the quality is goodKim Tae heavy industry is also an up and coming car, the appearance of the same as the Ming Yu, the quality is also good, the frame than the same car to be large, it is important that he is in all parts of the distribution point with professional maintenance personnel, service is doing very well.
Q:The role of Loaders
The role of loaders:The utility model is mainly used for shoveling scattered materials such as soil, sand and gravel, lime, coal, etc., and can also do minor digging work for ores, hard soil and the like. Different auxiliary working equipment can be changed, and the lifting, lifting and other materials such as wood handling can also be carried out. In the road, especially in the construction of high-grade highways, loaders are used for filling and excavating of subgrade engineering, aggregate and loading of asphalt mixture and cement concrete field.
Q:ZL50 loader fuel consumption calculation
Can only be said on the average, there is no specific, because it depends on what kind of work. In any case, the oil door is generally 10 liters to 15 liters, but also depends on the high speed engine, or low speed.
Q:How about the size and capacity of loaders?
The letters behind two digits represent the rated load, such as Liugong ZL50C on behalf of the rated load is 5 tons; if the letters behind is the 3 digit is the first digit of the manufacturers for the product code, after two digits represent the rated load, such as the LG855B loader, LG on behalf of lonking, 8 on behalf of the loader code, representing 5 of rated load 5 tons.
Q:What is the working principle of the loader transmission?
Gearbox branch star and fixed shaft, is through the different gear ratio change the output speed and torque to change the output speed and output torque effectThe wheel of the hydraulic torque converter of the loader is rigidly connected with the flywheel of the engine, that is, the input speed of the hydraulic torque converter is consistent with the output speed of the engine. The loader torque converter will have a variable speed pump, this oneThe main function of the pump is to absorb oil from the sump of the gearbox, supply the transmission oil in the torque converter, and lubricate and cool the gears and clutch pieces in the transmission.For torque converters, the main parameters are the speed ratio and the torque ratio.
Q:Size of loader 50 loader
the operation quality of 15850kg 162kw; rated power; fuel consumption per hour 75 yuan per hour speed; 40km;
Q:A 50 a class loader is how much money?
I don't know you say what is the meaning of the team, now loader is almost the price of 160 yuan to 190 yuan, to see what to do, burning their own oil, I was engaged in loader!
Q:What is the reason that the oil tank in the loader is too high?
The reason that the oil temperature of converter is too high is caused by the following aspects:1, the transmission oil level is too high or too lowCheck the oil quantity of the transmission oil pan and adjust the drive oil to the required position.The correct method of operation is:Park the machine on a horizontal floor, shift the handle in neutral and lock it. Loosen the choke and see if the oil is leaking. If the outflow of oil is too much, should be part of the oil release; if there is no oil flow, then the oil level is too low, should be filled with hydraulic transmission oil to the oil flow.2, variable speed pump damage, oil suction pipe impededThe function of the variable speed pump is to control the high pressure oil produced by the torque converter, and the high-pressure oil is distributed to the 2 shaft assembly through the variable speed distribution valve to realize the advance and retrogression of the forklift. The transmission pump damage will cause the gear supply to be impeded.With the increase of the loader's use time, the wear will be increased, the transmission pump will be discharged, and the transmission pressure and mechanical efficiency can not meet the requirements. Thus causing oil absorption pipeline oil supply is not smooth, the oil can not lubricate all parts of the movement, increased friction, but also cause overheating of the system. It should be noted that the transmission pump suction pipe leakage or obstruction phenomenon, will also cause insufficient flow, resulting in excessive oil temperature.3, hydraulic transmission oil metamorphismThe hydraulic transmission oil in the transmission is deteriorated, and the lubrication effect will not be reached. It will cause excessive wear and tear of the system and cause high temperature of the parts in the generator. It is recommended that the loader change the hydraulic transmission oil every 1500 hours.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range