Wedge Lock Scaffolding of Decoration with SGS Certified CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of Wedge Lock Scaffolding of Decoration with SGS Certified
Type:Fixed
Material:
Construction Properties:
Lapping Form:
Framework:
Supporting Mode:
Erection Position:
Scaffolding Part Type:
Move Method:
Structural Style:
Materials Standard:
Materials Specification:
Qualified Certificate:
Surface Treatment:
Standard Size:
Ledger Size:
Descriptions of Wedge Lock Scaffolding of Decoration with SGS Certified
Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.
Ringlock scaffold has the following features:
Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.
Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.
Low maintenance: The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.
Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights. Reasonable customer requirement is acceptable
The System of Wedge Lock Scaffolding of Decoration with SGS Certified
Ringlock
Scaffold
SystemStandard
Q345 tube
48.3*3.25Procedure Size Weight(kg) Surface Certificate
1.Cutting
2.Drilling
3.Plating cutting
4.Forming
5.Welding
6.Remove welding slag
7.Galvnize
8.Surface finish
9.Assembling
10.Packing
11.Logistics0.5m 2.96 HDG SGS ISO EN 1.0m 5.33 HDG SGS ISO EN 1.5m 7.73 HDG SGS ISO EN 2.0m 10.06 HDG SGS ISO EN 2.5m 12.42 HDG SGS ISO EN 3.0m 14.78 HDG SGS ISO EN Ledger
Q235 tube
48.3*3.250.73m 3.81 HDG SGS ISO EN 1.09m 4.93 HDG SGS ISO EN 1.40m 6.44 HDG SGS ISO EN 2.07m 8.71 HDG SGS ISO EN 2.57m 10.64 HDG SGS ISO EN 3.07m 12.41 HDG SGS ISO EN Brace
Q235 tube
48.3*2.51.5*2m 9.04 HDG SGS ISO EN 2.0*2m 10.05 HDG SGS ISO EN 2.5*2m 11.42 HDG SGS ISO EN 3.0*2m 12.13 HDG SGS ISO EN Bracket
Q345 tube
48.3*3.20.35m 4.5 HDG SGS ISO EN 0.75m 6.7 HDG SGS ISO EN 1.1m 9.9 HDG SGS ISO EN Plank
Q235
1.5mm
1.8mm0.73m 5.1 HDG SGS ISO EN 1.09m 6.9 HDG SGS ISO EN 1.4m 8.85 HDG SGS ISO EN 2.07m 12.11 HDG SGS ISO EN 2.57m 15.02 HDG SGS ISO EN 3.07m 17.69 HDG SGS ISO EN base
collar0.16m 1.7 HDG SGS ISO EN 0.2m 2.1 HDG SGS ISO EN Toe
board
wood
15*1.5cm0.73m 2.16 anti-fire ISO EN 1.09m 2.98 anti-fire ISO EN 1.57m 4.12 anti-fire ISO EN 2.07m 5.75 anti-fire ISO EN 2.57m 6.88 anti-fire ISO EN 3.07m 7.98 anti-fire ISO EN
FAQ
1. What is considerations of Scaffolding installation?
There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,
(1) scaffold frontage hurtful to prevent falling objects protection is required.
(2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator
2.What are the certifications of your products?
Certified by SGS, BS1139, EN74, Local Test Report.
3. How long is the warranty period for your product?
Our products warranty is 2 years.
- Q:Bowl buckle scaffold inspection and evaluation
- Bowl buckle scaffold should be checked and accepted as follows:(1) access to the site of the bowl buckle frame fittings shall have the following information:
- Q:Can you identify Scaffold Grade Aluminum tubing by looking at it.?
- The grade or type of Aluminum Alloy materials can not be identified visually because they are almost all the same in appearance. Normally these materials are marked with there Alloy number or designation like, 6061- T6, at certain intervals so that users can distinguish them.
- Q:Specification and type of scaffold erection
- 2 fasteners should be qualified factory, where brittle crack, deformation, sliding wire shall not be used. 3 steel scaffolding should be 2 ~ 3mm thick No. 3 steel plate, with the length of 1.4 ~ 3.6m, 23 ~ 25cm, width of rib height should be 5cm, available on both ends of connecting device, surface with anti slip hole, where the crack distortion may not be used.
- Q:Latch type disc scaffolding accessories is a national patent product
- Said chrysanthemum disc scaffolding system, disc scaffolding system, wheel type scaffolding system, buckle scaffold, layher frame
- Q:The scaffold weighs 204 N and is 3.10 m long. What is the force each rope exerts on the scaffold when the 665 N worker stands 1.00 m from one end of the scaffold? N (smaller force) N (larger force)
- Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
- Q:Are the terms quot;nuclear matrixquot; and quot;nuclear scaffoldquot; interchangeable? I know that when we talk about DNA compaction we say that MARs on the DNA attach to the nuclear scaffold. I am wondering if the scaffold is just a specific part of the matrix??
- For most purposes, they are interchangeable terms for the same things. Some people favor one term, some the other. The ones who favor matrix over scaffold or vice versa may have some argument as to why it is better or a difference but in general people use them interchangeably.
- Q:So im a guyAnd I might get oneAnyone had one before/got one?Any advice?How much do they normaly cost?if you answer this i will love you forever :)
- i got mine (industrial) almost 8 years ago and it cost me $42. it hurt, they do it with one needle and just go straight across your ear. my mom nearly cried when she saw it. it feels really hot and sore after you get it and you have to constantly turn the bar in your ear to prevent infection and a keloid scar. i had a keloid scar on my ear from it and when i started working i was asked to take it out. it smells funny sometimes but i loved having it. kinda miss it now. good luck! xo
- Q:Exterior wall scaffold construction plan?
- Big bar:The large cross bar is arranged above the cross bar, and the inner side of the vertical rod is fastened with a right angle fastener and a vertical rod, and the length of the utility model is not less than 6m of the span of the 3m. The large cross bar is connected with a butt fastener, and the joint is arranged in a staggered way, not in the same time and in the same distance. The horizontal distance of adjacent joints shall not be less than 50cm. The distance from the joint to the riser is not more than 50cm
- Q:Bowl buckle type steel pipe scaffolding should set up a few people
- What are the form and structure of bowl buckle scaffold?Composition formA bowl type steel tube scaffold is a multifunctional scaffold in our country with reference to foreign experience developed, its member nodes connected with bowl, because the bowl is fixed on the steel pipe, all components of the axial connection, good mechanical properties, which is reliable, consisting of the scaffold with good integrity, there is no fastener lost problem.
- Q:Topic?Scaffolding construction program how to doSpecial construction scheme
- 6, the vertical bar is arranged, it is necessary to consider the distance between the horizontal bar. The general spacing should not be greater than 1.5 meters (through the calculation of the pressure bar instability spacing);7, pay attention to the level of the rod near the ground and the top of the surface must have a rod (some people do not think this is necessary, but often up and down instability is difficult to insurance);8, the longitudinal brace configuration, with full support from top to bottom bracing will cross 45 degrees continuous configuration, intermediate cannot disconnect (i.e. a brace from the top to the ground, the middle long); brace configuration based on experience, but also can be calculated (using coplanar force system, theoretical mechanics learned);9, lateral bracing configuration, the same as the vertical;10, considering the load loading calculation of concrete three days is enough, if the concrete two times, loading unnecessary all add up, because the first pouring concrete general solidification, not the calculation of the load, favorable.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Wedge Lock Scaffolding of Decoration with SGS Certified CNBM
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 50 m.t.
- Supply Capability:
- 30000 m.t./month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords