Wedge Lock Scaffolding of Decoration with SGS Certified CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of  Wedge Lock Scaffolding of Decoration with SGS Certified 

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Installation Scaffold

  • Lapping Form:Special-Shaped Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Projecting Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Materials Standard:Q235, Q345

  • Materials Specification:48.3*3.25mm, 48.3*3.0mm, 48*2.5mm

  • Qualified Certificate:SGS Test Report, ISO9000, Coc

  • Surface Treatment:Hot DIP Galvanized, Power Coated, Electroplated

  • Standard Size:0.5m, 1m, 1.5m, 2m, 2.5m, 3m

  • Ledger Size:0.6m, 0.9m, 1m, 1.2m, 1.5m, 1.8m, 2.0m, 2.5m, 3m

  • Production Ability:10 Tons Per Day

  • Procedure:Cutting, Drilling, Welding, Galvanized, Assembling

  • Export Markets:North America, South America, Southeast Asia, Western Europe



  • Wedge Lock Scaffolding of Decoration with SGS Certified CNBM

  • Wedge Lock Scaffolding of Decoration with SGS Certified CNBM

  • Wedge Lock Scaffolding of Decoration with SGS Certified CNBM




  • Descriptions of Wedge Lock Scaffolding of Decoration with SGS Certified 

  • Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.

  •  

  • Ringlock scaffold has the following features:

  • Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.

  • Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.

  • Low maintenance: The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.

  • Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights. Reasonable customer requirement is acceptable



  • The System of Wedge Lock Scaffolding of Decoration with SGS Certified 

  • Ringlock
    Scaffold
    System
    Standard
    Q345 tube
    48.3*3.25
    ProcedureSizeWeight(kg)SurfaceCertificate

    1.Cutting

    2.Drilling

    3.Plating    cutting

    4.Forming

    5.Welding

    6.Remove welding slag

    7.Galvnize

    8.Surface finish

    9.Assembling

    10.Packing

    11.Logistics
    0.5m2.96HDGSGS ISO EN
    1.0m5.33HDGSGS ISO EN
    1.5m7.73HDGSGS ISO EN
    2.0m10.06HDGSGS ISO EN
    2.5m12.42HDGSGS ISO EN
    3.0m14.78HDGSGS ISO EN
    Ledger
    Q235 tube
    48.3*3.25
    0.73m3.81HDGSGS ISO EN
    1.09m4.93HDGSGS ISO EN
    1.40m6.44HDGSGS ISO EN
    2.07m8.71HDGSGS ISO EN
    2.57m10.64HDGSGS ISO EN
    3.07m12.41HDGSGS ISO EN
    Brace
    Q235 tube
    48.3*2.5
    1.5*2m9.04HDGSGS ISO EN
    2.0*2m10.05HDGSGS ISO EN
    2.5*2m11.42HDGSGS ISO EN
    3.0*2m12.13HDGSGS ISO EN
    Bracket
    Q345 tube
    48.3*3.2
    0.35m4.5HDGSGS ISO EN
    0.75m6.7HDGSGS ISO EN
    1.1m9.9HDGSGS ISO EN
    Plank
    Q235 
    1.5mm
    1.8mm
    0.73m5.1HDGSGS ISO EN
    1.09m6.9HDGSGS ISO EN
    1.4m8.85HDGSGS ISO EN
    2.07m12.11HDGSGS ISO EN
    2.57m15.02HDGSGS ISO EN
    3.07m17.69HDGSGS ISO EN
    base
    collar
    0.16m1.7HDGSGS ISO EN
    0.2m2.1HDGSGS ISO EN
    Toe
    board
    wood
    15*1.5cm
    0.73m2.16anti-fire ISO EN
    1.09m2.98anti-fire ISO EN
    1.57m4.12anti-fire ISO EN
    2.07m5.75anti-fire ISO EN
    2.57m6.88anti-fire ISO EN
    3.07m7.98anti-fire ISO EN
     
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to remove the disc scaffolding ah, do not know how to get through the decoration
First, in the demolition of the mobile frame should pay attention to the partner can not be replaced, it is better to slow down or stop work, do not have the experience of the construction personnel to carry out the demolition work.
Q:Calculation method of complete scaffold
The most distant light is closer to us than the nearest darkness:Distance is usually just a myth
Q:what is scaffolding in early childhood?
Scaffolding basically means being the support (a scaffold is a support) in the child's learning. A preschooler can do a range of things. He or she will have mastered some things already and there will also be things that are beyond what he or she can do. When playing with the preschooler, you want to make sure that what's going on falls in that range (zone of proximal development). Don't give him or her something that's too easy or too hard to do, but play games that make them think a little and use what he or she already knows to take it a bit further. I hope I'm not confusing you more. In one sentence..scaffolding is supporting the child in learning something new based on what they already can do or know.
Q:What are the safety requirements for the dismantling of construction scaffolding
(1) prior to the dismantling of the scaffold, the work instructions for the removal shall be prepared and submitted for approval according to the design approval procedure of the scaffold. No work instructions or safety measures are not implemented, it is strictly prohibited to dismantle the work.(2) prior to the removal of the work, the approved work instructions and construction plans shall be made to the site construction personnel. And should check the implementation of site safety measures.
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Q:I want to know the classification of scaffolding in the building
Steel pipe scaffold. The utility model is composed of two or more steel pipes of different specifications, such as a door type scaffold.
Q:How Long Will My Scaffolding/Industrial Piercing Take To Stop Being Sore?
It only really hurt for the first month-ish but was really tender for the first 3 months. After that, I barely noticed it was there. Goodluck :]
Q:What are the common rules for calculating the amount of scaffolding works
The calculation of masonry construction height within 1.35 ~ 3.6m according to the calculation in the scaffold; scaffold height above 3.6m, the independent brick columns are less than 3.6m in height according to the circumference of the core column is built by scaffolding in height according to the calculation; at an altitude of 3.6m and above at the circumference of the core column is built by 3.6m and calculated by single row height scaffolding.
Q:Can you believe a man survived a 60 foot fall from a scaffold?
With God all things are possible.
Q:Disc scaffolding and bowl buckle scaffolding which kind of bridge support better?
Characteristic1 Multi function. According to the specific requirements of construction, can be composed of multiple 0.6m module group frame size and load of single row, double row scaffolding, supporting frame, supporting the construction of equipment to enhance the function of frame columns, and other materials, and can do curve layout. Scaffolding can be adjusted with the bottom of the support, adjustable upper support, dual adjustable early demolition, pick beam, pick up the rack and other accessories with the use of various types of steel scaffolding can be used in conjunction with each other to achieve a variety of multi-functional

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range