Wedge Lock Scaffolding of Decoration with SGS Certified CNBM

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of  Wedge Lock Scaffolding of Decoration with SGS Certified 

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Installation Scaffold

  • Lapping Form:Special-Shaped Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Projecting Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Horizontal mobile Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Materials Standard:Q235, Q345

  • Materials Specification:48.3*3.25mm, 48.3*3.0mm, 48*2.5mm

  • Qualified Certificate:SGS Test Report, ISO9000, Coc

  • Surface Treatment:Hot DIP Galvanized, Power Coated, Electroplated

  • Standard Size:0.5m, 1m, 1.5m, 2m, 2.5m, 3m

  • Ledger Size:0.6m, 0.9m, 1m, 1.2m, 1.5m, 1.8m, 2.0m, 2.5m, 3m

  • Production Ability:10 Tons Per Day

  • Procedure:Cutting, Drilling, Welding, Galvanized, Assembling

  • Export Markets:North America, South America, Southeast Asia, Western Europe



  • Wedge Lock Scaffolding of Decoration with SGS Certified CNBM

  • Wedge Lock Scaffolding of Decoration with SGS Certified CNBM

  • Wedge Lock Scaffolding of Decoration with SGS Certified CNBM




  • Descriptions of Wedge Lock Scaffolding of Decoration with SGS Certified 

  • Ringlock is a modular scaffold system which can provide major savings in labor costs while meeting the demands for safety, ease of handling and reductions in maintenance.

  •  

  • Ringlock scaffold has the following features:

  • Quick erection: Ringlock scaffold are all pre-measured and just a hammer is required when erection.

  • Versatility: The revolutionary node point- rosette provides up to 8 connections in one plane, allowing the system scaffold highly adaptable for straight as well as curved structures, such as ship yards, power generation stations, petrochemical plants.

  • Low maintenance: The dip galvanized finish will greatly last the life of the products, no paint required, no more rust or corrosion, even they can be stored externally.

  • Safety: The reliable wedge connections prevent ledgers and diagonal braces from any kind of loosening, The rigid, right fit of all connections with concentric derivation of loads guarantees safety even at great heights. Reasonable customer requirement is acceptable



  • The System of Wedge Lock Scaffolding of Decoration with SGS Certified 

  • Ringlock
    Scaffold
    System
    Standard
    Q345 tube
    48.3*3.25
    ProcedureSizeWeight(kg)SurfaceCertificate

    1.Cutting

    2.Drilling

    3.Plating    cutting

    4.Forming

    5.Welding

    6.Remove welding slag

    7.Galvnize

    8.Surface finish

    9.Assembling

    10.Packing

    11.Logistics
    0.5m2.96HDGSGS ISO EN
    1.0m5.33HDGSGS ISO EN
    1.5m7.73HDGSGS ISO EN
    2.0m10.06HDGSGS ISO EN
    2.5m12.42HDGSGS ISO EN
    3.0m14.78HDGSGS ISO EN
    Ledger
    Q235 tube
    48.3*3.25
    0.73m3.81HDGSGS ISO EN
    1.09m4.93HDGSGS ISO EN
    1.40m6.44HDGSGS ISO EN
    2.07m8.71HDGSGS ISO EN
    2.57m10.64HDGSGS ISO EN
    3.07m12.41HDGSGS ISO EN
    Brace
    Q235 tube
    48.3*2.5
    1.5*2m9.04HDGSGS ISO EN
    2.0*2m10.05HDGSGS ISO EN
    2.5*2m11.42HDGSGS ISO EN
    3.0*2m12.13HDGSGS ISO EN
    Bracket
    Q345 tube
    48.3*3.2
    0.35m4.5HDGSGS ISO EN
    0.75m6.7HDGSGS ISO EN
    1.1m9.9HDGSGS ISO EN
    Plank
    Q235 
    1.5mm
    1.8mm
    0.73m5.1HDGSGS ISO EN
    1.09m6.9HDGSGS ISO EN
    1.4m8.85HDGSGS ISO EN
    2.07m12.11HDGSGS ISO EN
    2.57m15.02HDGSGS ISO EN
    3.07m17.69HDGSGS ISO EN
    base
    collar
    0.16m1.7HDGSGS ISO EN
    0.2m2.1HDGSGS ISO EN
    Toe
    board
    wood
    15*1.5cm
    0.73m2.16anti-fire ISO EN
    1.09m2.98anti-fire ISO EN
    1.57m4.12anti-fire ISO EN
    2.07m5.75anti-fire ISO EN
    2.57m6.88anti-fire ISO EN
    3.07m7.98anti-fire ISO EN
     
  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scaffolding????
Yep the above is correct .. it's the way people (students) break down and explain certain things... With LOve...x
Q:Fastener type steel pipe scaffold accessories
Wall pieceEven the wall piece the upright rod is connected with the main structure together, available steel tube, fastener or embedded part. Rigid wall, also can be used as a flexible reinforced wall connecting piece of the tie bar.
Q:What is a bar in the scaffold
Scaffolding is 1.5 meters of the cross bar is called the cross bar; long to such as the steel pipe is generally called the 6 horizontal pull rod
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
. The utility model is mainly used for a light frame and a background frame of a large-scale concert Disc type multifunctional scaffolding, after the bowl buckle scaffold after the upgrading of products. The socket diameter of 133mm scaffold, 10mm thick disc, 8 hole disc, adopting 48*3.5mm, Q345B pipe master component, the vertical rod is in the pipe length of every 0.60m welding on a disc, rail connection using this novel and beautiful disc, the bottom with the connecting sleeve. The cross bar is made of a plug with a plug welded on both ends of the steel pipe.
Q:i wanna ask regarding scaffold to any structural/civil engineer?
It is a work safety issue. Past experience has shown that scaffolding sometimes gets modified by unqualified people (or weather) resulting in injury or death.
Q:A window washer weighing 700 N is standing on a scaffold supported by a vertical rope at each end. The scaffol?
The tension in the two vertical ropes must sum to 700N in order to balance the window washer. EDIT. In order to find the answer for each rope, I need to know how long the scaffold is and where the window washer is standing. EDIT. Taking moments about the end nearest to window washer. T1*3.044 = 298.6*1.522 + 700*1.51 ----> T1 = 496.54 N (2. d. p.) Taking moments about the other end. T2*3.044 = 298.6*1.522 + 700*1.534 ----> T2 = 502.06 N (2. d. p.) T1 + T2 = 496.54 + 502.06 = 998.6 = 700 + 298.6 as required.
Q:Should i rotate my scaffolding piercing?
don't rotate it and stop using hydrogen peroxide only use warm water mixed with sea salt or anti-bacterial soap(dial),saline solution(contact cleaner),h20ocean piercing spray found at hottopic. you can turn the bar to clean it to get the other side clean but never rotate it. it'll make the piercing healing process alot slower and it can cause problems.
Q:A 115 kg scaffold is 7 m long. It is hanging with two wires, one from each end?
Because the scaffold is not moving, we can assume that the net Torque acting on the scaffold equals zero. Net Torque = 0 torque = Force x distance (d) Use the left end of the scaffold as the center point. This will eliminate the Torque caused by the left wire (d = 0, so torque = 0) There are now three forces creating torque on the scaffold. There is the weight (m x g) of the scaffold, at 3.5m from the left end. m1 x g x 3.5m There is the weight of the crate, located 1.4m from the left end: m2 x g x 1.4m These two torques are countered by the torque caused by the Tension (T) of the right wire, located 7m from the left side. T x 7m The sum of these torques is zero. (T x 7m) - (m1 x g x 3.5m) - (m2 x g x 1.4m) = zero solve for T T = ((m1 x g x 3.5m) + (m2 x g x 1.4m)) / 7m T = ((115kg x 9.8m/s^2 x 3.5m) + (520kg x 9.8m/s^2 x 1.4m)) = 1.58 x 10^3 N Hope this helps.
Q:how long should i wait to change my scaffolding piercing?
Industrial piercings take 9-12 months to heal completely and you never want to remove an unhealed piercing unless the jewelry is causing problems and at that point it should be done by a professional in a sterile environment. Taking the jewelry out before it is healed could cause it to close up, become infected or irritated, and can cause hypertrophic scarring (scar tissue) to form on your piercing. I took my industrial out after having it for 3 months. It was out for less than a minute and when I went to put it back in it went through the first hole easily but wouldn't go through the top hole no matter how hard I pushed. It immediately started bleeding and hurtling like crazy. Awesome. Waste of time, pain, and money. So, you might get lucky and just have it get a little irritated or prolong the healing time by changing it early. But you could also end up like me or worse, with any infected piercing. Why risk it?
Q:Fastener type steel pipe scaffold composed of which components?
Reference to "construction safety of steel tubular scaffolding safety technical specifications" JGJ 130 - 2011, 8, page parts3.1 steel pipe3.1.1 scaffolding steel pipe should be used in the current national standard "straight welded steel pipe" GB/T13793 or "low pressure flowQ235 steel pipe for the welded steel pipe used for conveying body; the steel quality of the steel pipe shall be GB/T3091In accordance with the existing national standard "carbon structural steel" GB/T700 Q235 steel provisions.3.1.2 scaffolding steel pipe should be used 48.3 * 3.6. The maximum quality of each steel pipe shall not be greater than25.8kg.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range