Waterseal Mastic with Adhesion to Metal and All Types of Cable Insulations and Jackets

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 roll
Supply Capability:
500000 roll/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Waterseal Mastic with Adhesion to Metal and All Types of Cable Insulations and Jackets

Description of KC86 Tape

• KC 86 is a self-amalgamating mastic tape used for moisture sealing on all types of telecommunications and solid dielectric power cable splices and connections.

• It is a tacky, temperature stable mastic with excellent conformability and adhesion to metal and all types of cable insulations and jackets.
• It is put up on a white release coat separator in roll form without any core.
• Once applied, KC 86 mastic should be overwrapped with a vinyl or rubber tape which will encapsulate it and, throug centripetal force, make it into every crevice and indentation in a cable jacket thereby giving a superior moisture seal in a splice or aroun any connection.
• The tape is also RoHS compliant, resistant to corrosion, chemicals and salt water and has no adverse effect on cable insulations.
• Its 2.5mm thickness facilitates rapid protection build-up.

• Use in conjunction with KC 63 premium vinyl electrical tape for optimal performance.

Dimensions of KC86 Tape
2.5” x .1” x 23.6”
63mm(width) x 2.5mm(Thickness) x 0.6m(length)
Consult us for other sizes

Specifications of KC86 Tape

Waterseal Mastic with Adhesion to Metal and All Types of Cable Insulations and Jackets

Applications of KC86 Tape

• Moisture seal and insulation in power cable through 600 volts

• Moisture seal and insulation of telecommunication cable connections in base stations, antennas and aerial feeders

• Other moisture sealing applications

Waterseal Mastic with Adhesion to Metal and All Types of Cable Insulations and Jackets

FAQ

1.Before placing order, can we make sample firstly?
Sample can be arranged to send to you to test before placing order.
Sometimes sample is free ,sometimes sample charge should be included if more than 3 pcs with material .
But we are afraid freight charge will be paid by yourself.
Certainly, we will adjust additional sample and freight charges into your bulk order.

2.How can I get your sample?
Of course, we can send you some samples. Most samples are free, but sometimes we will take small sample fees.
Maybe you also send us your DHL or EMS/UPS/TNT etc account ,so you can pay for air freight to your carrier company directly.

3.Whether we can print our logo or need our color or size or not?
Yes, because we have our own factory and R&D team, so we can make products as your demands.
We can print your logo, we also can make as your size and print it as your color.

4.How many kinds of payment terms you can accept?
About payment terms, we would like 100%TT if less than $1000.00
Usually for bulk order , would like can be paid pay 30%- 50% advanced payment and the rest should be paid before dispatch.
We hope this information will be helpful to you, if you have any question, please feel free to contact us, we are always at your service.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the materials used in the ceiling?
Kitchen bathroom ceiling material 3: waterproof gypsum board     Waterproof gypsum board is in the gypsum core by adding a certain amount of waterproof plastic made of products, so waterproof gypsum board has a certain waterproof function, while gypsum board paper is also a waterproof measures, is a more widely used materials. Waterproof gypsum board with the effect of thermal insulation, but also has the advantages of fire, noise, but also an easy decoration materials. There is also a feature of the characteristics of environmental protection, due to the use of natural gypsum as a raw material, in the home environmental protection is guaranteed.
Q:There is no formaldehyde in the finished putty
Visible putty powder and formaldehyde or a great relationship, but now many manufacturers have introduced environmentally friendly putty powder, not only environmentally friendly pollution-free important is also can control the air, there is a negative ion putty powder is the composition which contains tourmaline tourmaline, through And the water molecules in the air combined with the decomposition of negative ions to deal with the air, anion can be neutralized with formaldehyde into dust falling into the air, you can also remove the dust in the air, as well as enhance the metabolism of the function.
Q:How to ensure the waterproof quality of the underground shear wall (retaining wall)?
4, select the appropriate waterproof material, generally designed for waterproofing membrane.
Q:How does the finished ventilator manufacturer waterproof?
do not play any silicone and tape, to avoid the silicone tape aging caused by leakage hazards. Can be done once and for all.
Q:Finished house bathroom waterproof household acceptance should be how to accept?
Bathroom waterproof acceptance: material acceptance: 1: materials need to meet the national standards, the need for a product certificate of competency. Construction acceptance: 1: grass-roots surface should be flat, no hollowing, from the sand, cracking and other defects. Base water content should meet the construction requirements of waterproof materials.
Q:Waterproof material water leakage construction should pay attention to what
Or to local, if it is a bathroom, it should pay attention to these points: Bathroom waterproof practice: 1, ground handling Before the water treatment, must first find the ground. Leveling layer of construction methods: the base surface with gaps, cracks, unequal defects, with cement mortar repair smooth. So that the base surface must be strong, smooth, clean, dust-free, greasy, wax, release agent, and other debris material. Leveling layer before drying can be waterproof construction, construction should be fire, waterproof. After the completion of the waterproof layer, to be finished product protection, not on the move.
Q:Developers have done waterproof, decoration house also have to do it
Carbine water to remind you: the general finished house really done by the construction unit waterproofing, but we must know: First of all, developers for the rough housing waterproofing is more casual, may use the poor waterproof performance of the material, in the construction
Q:How can the toilet waterproof works fail?
After the failure of the bathroom waterproofing project to solve the specific needs of the specific analysis of targeted treatment.         Bathroom waterproof is the problem more decoration works. The main reasons are: 1, construction (local, details, etc.); 2, waterproof material problems; 3, the structure (such as uneven settlement, cracking, etc.); 4, to save a little waterproof waterproof measures.          After the three must be redo waterproof, the first type of reasons can be used to the appropriate remedial measures, pay the table "bathroom waterproof failure part of the phenomenon and the remedy list."         Please responsible professionals in the field to carefully check the judge to find specific reasons for dealing with the need to destroy the red or must be destroyed, do not affect others after causing greater losses. The following are the same as the "
Q:How do you make waterproofing in the kitchen and bathroom?
Kitchen and toilet to do waterproof, it is recommended to use kitchen and toilet waterproof paste, it is specifically for the kitchen and toilet water and easy to seepage yin and yang angle, pipe, sanitary ware, floor drain and other parts of the development, special materials, so waterproof Ordinary waterproof material is better, and waterproof coating construction is more convenient, only need to brush 2-3 times, the thickness of 1.2-1.5MM on it. Specific construction methods are as follows: 1, will penetrate the root, floor drain and other cracks, need to repair the site cut into "V" shape, and clean, sprinkler moist; 2, the [infiltration of crystalline repair mortar] add water (water and ash weight ratio of 1: 2 ~ 3) mixed evenly, in the early condensate before (5 minutes) to repair the construction, the root of the pipe, the floor drain, yin and yang, Should be made r angle; 3, repair mortar after the final setting, the [durable waterproof paste] powder and liquid material mixing evenly, put it aside for 3 minutes, and then stir evenly after brushing on the base surface, should be cross brush twice, and so on The first time after the dry, can be carried out the second time construction; 4, after the completion of anti-stamped, 48 hours after the closed water test.
Q:Do you use the waterproof material on the building to be harmful to the human body?
Of course harmful, not just this particle, there are auxiliary materials are also toxic.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range