Waterseal Mastic with Adhesion to Metal and All Types of Cable Insulations and Jackets

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1000 roll
Supply Capability:
500000 roll/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Waterseal Mastic with Adhesion to Metal and All Types of Cable Insulations and Jackets

Description of KC86 Tape

• KC 86 is a self-amalgamating mastic tape used for moisture sealing on all types of telecommunications and solid dielectric power cable splices and connections.

• It is a tacky, temperature stable mastic with excellent conformability and adhesion to metal and all types of cable insulations and jackets.
• It is put up on a white release coat separator in roll form without any core.
• Once applied, KC 86 mastic should be overwrapped with a vinyl or rubber tape which will encapsulate it and, throug centripetal force, make it into every crevice and indentation in a cable jacket thereby giving a superior moisture seal in a splice or aroun any connection.
• The tape is also RoHS compliant, resistant to corrosion, chemicals and salt water and has no adverse effect on cable insulations.
• Its 2.5mm thickness facilitates rapid protection build-up.

• Use in conjunction with KC 63 premium vinyl electrical tape for optimal performance.

Dimensions of KC86 Tape
2.5” x .1” x 23.6”
63mm(width) x 2.5mm(Thickness) x 0.6m(length)
Consult us for other sizes

Specifications of KC86 Tape

Waterseal Mastic with Adhesion to Metal and All Types of Cable Insulations and Jackets

Applications of KC86 Tape

• Moisture seal and insulation in power cable through 600 volts

• Moisture seal and insulation of telecommunication cable connections in base stations, antennas and aerial feeders

• Other moisture sealing applications

Waterseal Mastic with Adhesion to Metal and All Types of Cable Insulations and Jackets

FAQ

1.Before placing order, can we make sample firstly?
Sample can be arranged to send to you to test before placing order.
Sometimes sample is free ,sometimes sample charge should be included if more than 3 pcs with material .
But we are afraid freight charge will be paid by yourself.
Certainly, we will adjust additional sample and freight charges into your bulk order.

2.How can I get your sample?
Of course, we can send you some samples. Most samples are free, but sometimes we will take small sample fees.
Maybe you also send us your DHL or EMS/UPS/TNT etc account ,so you can pay for air freight to your carrier company directly.

3.Whether we can print our logo or need our color or size or not?
Yes, because we have our own factory and R&D team, so we can make products as your demands.
We can print your logo, we also can make as your size and print it as your color.

4.How many kinds of payment terms you can accept?
About payment terms, we would like 100%TT if less than $1000.00
Usually for bulk order , would like can be paid pay 30%- 50% advanced payment and the rest should be paid before dispatch.
We hope this information will be helpful to you, if you have any question, please feel free to contact us, we are always at your service.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What material is used for waterproofing of tarpaulin
Regardless of the construction or finished products are toxic, due to organic materials, it will form a separation layer, partition structure of poor wear resistance, must be a protective layer of solid, not hollowing, but requires the base surface moisture content of less than 8% overlap requirements No interface to form a seamless body thickness control easy to control the local thickness difficult to control
Q:How to do waterproof bathroom, construction process is what
Second, the construction process: 1, grass-roots treatment: grass-roots surface must be smooth and smooth, there must be no pit phenomenon may not loose, trachoma or hole exists. If the above phenomenon should be smooth and smooth after the construction, the surface must be dry, there must be a pipe at the root of the head must be wiped into a circular arc, the pipe must be strong. 2, brushing the primary treatment agent, the "Liang wall" waterproof primer at the end of uniform mixing, and then use a long brush or rubber brush scraper, scratching the waterproof material, even brush to the grass-roots level, brushing Can not be stacked and exposed white bottom, brushing the amount of each time to 0.4kg / square meters is appropriate, the first time after the full dry before brushing the second time. 点击图标下载 App
Q:What are the materials used in the ceiling?
Kitchen bathroom ceiling material 2: aluminum plate material     Aluminum buckle board is based on aluminum alloy as the main substrate, through the process to get the finished product, and now the aluminum plate in the use of integrated ceiling in the larger. In the home improvement specifications are generally 300MM * 300MM, 300 * 450mm, 300 * 600mm and other different sizes, because of its excellent board layer, with noise, heat insulation, light weight characteristics, while its color is also more Kind of choice, to meet the different needs of consumers.
Q:Waterproof mortar expensive or dry mortar expensive
Dry mortar is usually called hydraulic cement mixed mortar, refers to the dry sieve treatment of aggregate (such as quartz sand), inorganic cementing materials (such as cement) and additives (such as polymers) and so on a certain proportion of physical mixing Into a granular or powdered, in the form of bags or bulk transported to the site, add water, mix directly after the use of materials.
Q:Roof membrane waterproof construction process, what should be noted that?
Four do not: 1 surface can not afford sand 2 surface can not afford skin 3 surface is not crisp 4 does not crack
Q:What decoration materials, light and water, and the wall, the perfect combination of glass
Third, the mouth of the mouth, put pressure glue gun Cut the hose tube, fitted with a pointed nozzle, and then according to the size of the gap will be cut by 45 degrees angle. Install the glue gun.
Q:Find the construction steps for waterproof coatings
3, note (1) rain weather and five wind above the weather shall not be construction. (2) coating waterproof layer shall not have bottom leakage, cracking, holes and other defects and peeling, bubbling, carcassing and wrinkle phenomenon. Coating waterproof layer and the base should be bonded between the solid, no hollowing, trachoma, delamination and so on. (3) the coating site should be continuous, solid, shall not appear Alice, hollowing parts. (4) rigid protective layer before the completion of any personnel shall not enter the construction site, so as not to damage the waterproof layer; coating of the overlapping parts should be care by the staff. (5) roof should be used lime soil, clay or sub-clay for backfill, thickness 50 cm, backfill shall not contain stones, gravel, ash and organic matter. Artificial compaction of each layer 25 cm, mechanical compaction of each layer 30 cm, rammed to prevent damage to the waterproof layer. In the backfill thickness of more than 50 cm, it is allowed to use mechanical backfill rolling.
Q:Villa roof leakage what general reasons, what materials to remedy
First, the roof leak to find the first leak, looking for the main leak from the roof to the lower to find leakage. First look at the roof there is no crack, the original waterproof layer is not aging, the roof of the original waterproof membrane has no bubbles, there are bubbles to prove that the water has entered the bottom of the waterproof layer, and thus leaking, and roof On the gutter there is no clogging.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Fourth, the finished product protection 1, has been laid the membrane waterproof layer, should be taken to protect the facilities, is strictly prohibited in the waterproof layer on the construction operations and transportation, and should be timely to do the protective layer of the waterproof layer. 2, through the roof, wall waterproof layer at the pipeline, construction and after the completion of damage shall not damage. 3, deformation joints, water, etc., before the construction of waterproof layer, should be temporary closure, waterproof layer is completed, should be cleared to ensure that the tube, sewn smooth, to meet the use of function. 4, roof construction shall not pollute the walls, cornices and other finished products.
Q:FRP finished brush on what can be waterproof do not fade
FRP appearance is the use of gel coat, we do the appearance of glass steel yacht are gel coat, also known as plastic shell, resin gel coat, etc., the color can be customized in the factory, Nanjing DSM company there.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range