Wall Partition Gypsum Board

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
80000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Gypsum Board/Drywall Panel 7/7.5/8/9/12/12.5mm  

1.Core material: Gypsum board

2.Surface: heatproof and moist-proof

3.Low formaldehyde emission, conforms to E1 Standard of Environmental protection

4.Has the highest fireproof of Class B1, passed National Fire protection Authority.

5.Easy to install

6.Widely used in Hotel, Dinning Room, Shopping Center, Theatre,Dancing Room,Cinema, Station, meeting room, Office, Airport, villas and residential areas et


FAQ

1.How about the quality of gypsum board?


  Well,that is a good question.

  Please do not worry.

  We have passed ISO and CE certification..

  such as Australia,New Zealand,Thailand and Columbia,etc.


2.Which payment do you prefer?


  T/T is ok(30% advance payment,the other 70% before shipping).


3.When will the product be delivered?


   Usually within 10-20 days after receipt of advance payment.

   Obviously,it also dependson the quantity.


4.Do you accept customized?


  Yes,we will do our best to meet our customers' demand.


SIZE(mm)

KGS/PC

PCS/20GP

SQM/20GP

1200*2400*7

17

1180

3398

1200*2400*7.5

18

1150

3312

1200*2400*8

18.2

1080

3110

1200*2400*9

22.1

970

2793

1200*2400*9.5

22.8

940

2707

1200*2400*10

23.5

900

2592

1200*2400*12

29.5

720

2073

1200*2400*12.5

30

710

2044

1220*2440*7

17.55

1160

3453

1220*2440*7.5

18.14

1130

3363

1220*2440*8

18.58

1060

3155

1220*2440*9

22.83

950

2827

1220*2440*9.5

23.55

920

2738

1220*2440*10

23.83

900

2679

1220*2440*12

30.5

700

2083

1220*2440*12.5

31

690

2053




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Gypsum board ceiling is good?
Gypsum board to do the ceiling is very good Gypsum board is a kind of material made of building gypsum as the main raw material. It is a light weight, high strength, thinner thickness, easy processing and insulation and fire insulation and other properties of better building materials, is currently focused on the development of one of the new lightweight sheet. Gypsum board has been widely used in residential, office buildings, shops, hotels and industrial plants and other buildings within the wall, wall panels (instead of wall plaster layer), ceilings, sound-absorbing panels, ground floor boards and the Such as decorative plates. Gypsum board Gypsum board (commonly used) gypsum board (commonly used), fiber gypsum board, gypsum decorative plate "interpretation") it to gypsum as the main material, adding fiber, adhesive, modifier, by mixing to suppress, dry to make. With fire, noise, heat, light, high strength, low shrinkage and other characteristics and good stability, not aging, anti-moth, available nails, saws, planing, sticky side This product is Bairn due to the actual needs of the project, after years of painstaking research successfully developed, in line with national construction specifications of a new generation of patented gypsum board products. This product is made of Bayer proprietary high-grade white wood pulp paper and high-quality plaster and other raw and auxiliary materials refined, the product surface is more white, and in accordance with national construction specifications, in the gypsum board construction surface pre-set the precise Construction and installation of positioning points, so that the construction of good and fast. In addition, the use of gypsum products is also widening, in addition to the base, but also for surface decoration materials, and even for the floor tiles, external walls and wall materials, such as wall
Q:To prevent gypsum board ceiling split in addition to paste kraft paper and cloth what good way?
Kraft paper and cloth is sure to use, but how to use the method of innovation. At present, in addition to these two, really no other way
Q:Gypsum board ceiling mounted lights problem
Ceiling light does not matter, gypsum board can, if it is a ceiling to die
Q:16 square meters living room to do gypsum board around the ceiling about how much money
Is the surrounding ceiling, not how much gypsum board, but will be more time and effort, wooden and light steel keel, I suggest or light steel keel. Price is not good to say, not a lot of area, materials and labor will not be a lot of
Q:Gypsum board ceiling about how much money a square?
The main material plus accessories about 30 yuan plus artificial thirty to forty one square
Q:Decoration with gypsum board ceiling joints need to gap, generally stay much
Wood keel spacing 1, with the horizontal tube to find the level of the point, with the ink bucket along the horizontal point of playing the horizontal line; 2, light steel keel: wood keel for the edge of the dragon, the lamp slot position with wood keel or woodworking board production, there are wood production office to brush fire paint, keel at least 50, spacing 30 cm is appropriate, hanging spacing 60-80 cm Is appropriate, gypsum board and board between the people to set aside 5-8 mm gap, gypsum board self-tapping screws 1-2 mm and anti-embroidered treatment, to be smooth and solid, shaped to do smooth lines; 3, wood keel: keel at least 3 * 4 or more, spacing 30 cm is appropriate, hanging spacing 60-80 cm is appropriate, hanging bar is strictly prohibited direct use of wooden wedge nails to the top, brush tight fire paint until the wood keel color can not see , The keel on a layer of full-legged rice eucalyptus core 9% board and then on the gypsum board, gypsum board and board between the people to set aside 5-8 mm gap, gypsum board self-tapping screws 1-2 mm and do Anti-embroidered treatment, to be smooth and solid, shaped to do smooth lines; 4, aluminum plate: strict requirements level, light steel keel bayonet to be aligned, keel spacing of 50 or less, hanging spacing 60-80 cm is appropriate, the board when the hand to light, so as not to press the board to the pit And the contact with the tile is not tight to use the sealant to play tight; 5, aluminum-plastic plate: wood keel at least 3 * 4 or more, spacing 30 cm is appropriate, hanging spacing 60-80 cm is appropriate, brush tight fire paint, keel on a layer of full-legged rice eucalyptus core With a universal adhesive paste aluminum-plastic plate, aluminum-plastic plate and the board between the reserved 3-4 mm gap, has been filled with other colors to play the effect of grid, to be smooth and solid, shaped to do smooth lines , The angle of the fold surface can not be broken.
Q:Gypsum ceiling appear moldy how to do
If the above methods are used or did not solve the problem, we must completely deal with: the choice of better waterproof interior paint. Let the damp wall to have one to two months of drying process, and then brush on the wall layer of cement mixed with water slurry, from the moisture effect. Followed by plaster putty to fill the wall pits, Ma face, and then full of putty, dry with sandpaper after the wall polished, repeat twice, and clean. The next layer of paint can be coated on the dry and clean wall with the coating roller roll twice, can also be sprayed, so on the line.
Q:With gypsum ceiling, in the dining room to install ceiling fan lights, how to reserve the location?
To install the program you yourself to estimate: Ceiling fan installation program First, fixed lifting: ① wood ceiling, the fixed seat and hanging frame directly with wood screws drilling in the wooden side: "angle Aberdeen" on. ② If the concrete ceiling, then drill with a drill, the expansion screw (gecko) fixed in the ceiling cabinet, and then fixed seat and hanging frame installed up. 1, according to different materials of the ceiling, the use of different screws fixed hanger. 2, please do not put the hanging frame directly on the ceiling splint, to prevent the wood screw loose, bring danger. 3, hanger fixed, must be determined to withstand more than 30 kg of weight (hand test pull) to safety. Second, the installation of pipe, hanging bell: ※ use pipe 1, according to the ceiling height selection of the appropriate length of the pipe. 2, the appropriate length of the pipe for the ceiling to the ground height reduced to 81/2 foot ceiling fan body to the ground height can not be less than 2.5 meters 3, the ceiling fan with a length of 6 "long if not use, please contact the company Buy 4 ", 12", 18 ", 24", 36 "long pipe installation. ※ pipe fixed to the connector 1, the pipe into the dull clock, and then the power cord into the pipe. 2, the pipe into the connector, and insert the coupling bolt and safety pin, then the screws locked. Third, the installation of leaves, leaf frame: (the program can also be completed after the completion of the fifth program) 1, the blade fixed screw first penetrate the blade fixed Huasheng. 2, then the leaves fixed on the leaf frame. 3, fixed leaf frame in the motor surface Fourth, the installation of lobes in the hanger: 1, the ball into the hanger 2, turn the boom, so that the ball groove and hanger lug meshing. ※ ※ The pitch groove must be engaged with the hanger lug.
Q:Can the balcony be made of gypsum board?
If not very old and balcony with a lot of water, with gypsum board ceiling no bad, that is not the main balcony is a sewer, especially the old water, there is a kind of funnel, upstairs a large number In the case of water, from the funnel spilled water to bubble gypsum, if it is a new house, no problem, in the anti-water bend on the edge of the maintenance valve on the line, then there is no closed balcony, it is possible There is a rain in the rain, the wet weight is best not to do, the normal indoor can do. hope this helps
Q:General indoor ceiling is how high ah
If the home is installed in the dark frame ceiling, remember to set the maintenance hole, the living room ceiling gypsum board without aluminum plate demolition. There are a lot of people set the maintenance of red will affect the beauty, generally do not ask to set, but once the ceiling of the wire tube, wire and so out of the fault you can not determine where the problem, and why, more can not be repaired. If your living room ceiling of the installation of the pipeline must be set to repair the hole, maintenance holes can choose in the more subtle and easy maintenance of the place, can not casually choose the location. If you feel that the maintenance hole affect the beautiful, you can play their own imagination, the repair hole to do some artistic treatment, this does not affect the appearance, but also very convenient.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range