Wall Formwork Formwork with Durable Performance for High-rise Buildings

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
200 pc
Supply Capability:
3000000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

1. Structure of Wall Formwork Description 

 

Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props.  

 

2. Main Features of Wall Formwork

 

   -convenient for construction 

    -easy to control the quality

    -easy, rapid and economical.

    - Secondary beam - H20 timber beam(EN13377);
    - Fixed or swivel table head for option
    - Shoring prop  (10KN/20KN/30KN loading capacity with 2.5m to 5m open length, HDG, EN1065)
    - Shoring tower bros (35KN/60KN loading capacity with extreme height, HDG)
    - Handrail post

 

3. Wall Formwork Images

 

Wall Formwork Formwork with Durable Performance for High-rise Buildings

 

Wall Formwork Formwork with Durable Performance for High-rise Buildings

 

 

4. Wall Formwork Specifications

 

Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.

 

5. FAQ of  Wall Formwork

   

1) What can we do for you? 

    .We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects. 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issue. 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.    

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A 5.0-m long scaffold is 80 N. It hangs from wires at each end. A 200-N box sits 1.0 m from left. Tension?
The sum of the two tensions must equal the total weight supported so Tl + Tr = Wb + Ws = 200 + 80 where Wb is the weight of the box and Ws the weight of the scaffold. That's enough to choose the right answer, but to actually compute the tensions, you also need the torque equation. The sum of the torques around the left end of the scaffold must be 0 since the scaffold isn't moving. That means: 0 = (1.0) Wb + (2.5) Ws - (5.0) Tr where 1.0, the 2.5, and the 5.0 are the radii corresponding to the forces. So you can solve for Tr and then Tl.
Q:What is scaffolding pole, bar, scissors support?
Bowl buckle steel pipe scaffolding when using steel pipe, as a single steel scaffolding, when the use of steel when the edge of the cross bar, for the steel based scaffolding
Q:How to calculate the quantity of steel pipe in the support system of the bowl buckle scaffold
1200 or 900 spacing is generally adopted in practice. According to the size of the room are on the line. Probably on the line. The number of entry sized frame. In the actual construction, workers will be more skilled are arranged according to the room
Q:industrial/scaffold piercing help?
Let the dry blood come off on its own. Using a sterile saline wound wash spray twice a day to keep it clean will help soften it up and it will come off within time. You can take baths but you really need to make sure your head never gets submerged under the water while your piercing is healing. Washing your hair under the faucet is fine but rinsing it in the water you're sitting in is not.
Q:If the guillotine operator walked away from the scaffold where would he be headed?
lol, i have no answer for this...just laughter..
Q:I would like to ask the bowl buckle scaffold operating layer is what?
Its main function is to protect. Specific reference to JGJ 1302011 "construction fastener type steel pipe scaffolding safety technical specifications" in the relevant instructions, and illustrations.
Q:Specification for bowl buckle scaffold for construction
What does the previous version mean? Once the new version comes out, the previous version is cancelled
Q:After Care for Tragus, Cartlidge and Scaffolding Piercings?
I'm surprised that a piercer did all of this...5 cartilage piercings and not even on the same ear? No rock salt. It needs to be non-iodized sea salt. Soak them twice a day for 5-10 minutes each soak with 1/4th of a teaspoon of non-iodized sea salt to 8oz of hot water. I usually double the mixture and put it into a clean bowl and just tilt my head to the side into the bowl to soak it. Ibuprofen for the swelling and soreness, ice for short periods of time throughout the day if you want. Don't change them until they're healed, don't touch them at all, try to sleep on your back or stomach, no swimming underwater or emerging them underwater until they are healed. Do all that and the soaks and you shouldn't deal with infection.
Q:Significance to Hester viewing the crowd from atop the scaffold in the beginning (ch. 2) of the scarlet letter
it's been a while, but i think it's significant b/c its foreshawdoing. she later ends up dying on the scaffolds. also, i think she is looking down on everyone and seeing them as sinners, while later the tables will be reversed as they all look down on her for commiting adultery
Q:Scaffold/Industrial piercing & healing?
If you clean it for the first month real good you should be fine and clean it right when you get back. The only thing I'm thinking is that industrial is easily snagged and hit, which is going to cause pain and maybe infection. but if your willing to risk that go ahead. it's not the end of the world if you get an infection you just need to clean it with sea salt :P but it can be annoying, your choice.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range