Wall Formwork Formwork with Durable Performance for High-rise Buildings
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Wall Formwork Description
Timber beam wall formwork is used for the concrete pouring of wall. The application of large areas formwork has greatly increased the construction efficiency and reduced the cost. The system is convenient for construction and it is easy to control the quality. The system has two parts, formwork and pull-push props. The formwork is made of plywood, timber beam and steel waling. Pull-push props can be designed according to the project or simply select the standard props.
2. Main Features of Wall Formwork
-convenient for construction
-easy to control the quality
-easy, rapid and economical.
- Secondary beam - H20 timber beam(EN13377);
- Fixed or swivel table head for option
- Shoring prop (10KN/20KN/30KN loading capacity with 2.5m to 5m open length, HDG, EN1065)
- Shoring tower bros (35KN/60KN loading capacity with extreme height, HDG)
- Handrail post
3. Wall Formwork Images
4. Wall Formwork Specifications
Timber beam column formwork is used for the concrete pouring of square or rectangle column. The system has the same structure and similar connection type with wall formwork.
5. FAQ of Wall Formwork
1) What can we do for you?
.We can ensure the quality of the Timber Beam Wall Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
2) What promises can be done by us?
. If interested in this kind of formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issue.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
- Q:What is the difference between the bowl buckle steel tube scaffold and the steel pipe scaffold
- (2) efficacy: the most commonly used rod length of 3130MM, weight 17.07KG. The speed of the whole frame is 3 to 5 times faster than that of the conventional one, and the assembling and disassembling is quick and labor-saving, and the workers can complete all the operations with a hammer, which avoids the inconvenience caused by the bolt operation;
- Q:am i in my rights not to allow the scaffolding to be brought through my living room and kitchen.I have just had a threatening letter from camden council that they will force an entry if I refuse.I have lived here for 33 years and any scaffolding has always gone through the side entrance next door and over the garden wall I am a pensioner and feel I am being harassed
- Call your lawyer.
- Q:do u think i should, is it safe, will it hurt, how bad will it hurt, and what might happen.
- It is safe so long as you go to a professional. Keep in mind that many professional piercers will not pierce you until you are 14, even with parental consent. It will hurt, because it is done with a needle, and in order to get an industrial, you will have to get two holes pierced. The only things that could happen if you don't clean it properly is you could get an infection. Aside from that, if you go to someone who doesn't know what they are doing, or who pierces you with a piercing gun instead of a needle, you *could* end up with nerve damage. Research reputable shops before you get pierced!
- Q:the piercing i want is the double cartilage. people call them different things, but the most common (i guess) is scaffold. my uncle said that after its in your ear a long time the weight from the bar weighs down your ear and the cartilage gets weak and kinda is like bent. has this happend to anyone? or is he lying? cam it happen?
- hmm i havent heard that i am getting one but it heals faster with 2 separate rings thats what im doing
- Q:Fastener type steel pipe scaffold wall parts of the lateral spacing is less than the number of
- Horizontal not more than 6 meters, vertical not more than 4 meters!!!
- Q:Bowl buckle scaffold construction needs to pay attention to what problems
- Between the outer edge of the scaffold and the overhead line must be kept safe operating distance, to maintain not less than 4.5m, or the need to add additional barrier protection measures. ?Lightning protection set by 12 round steel and building lightning protection column and reliable welding, weld length not less than 6D, the grounding resistance shall not more than 30. The lightning protection of the scaffold is closed to the ring welding set, and the four angle is connected with the rib.
- Q:How Much would it cost to Scaffold a Detached Dwelling, 23m x 8.4m...Roughly?
- I had a detached 4-bed house surrounded (soffit and barge boards to do) by scaffold to a high standard for ?180 in Kent. Two weeks hire, assembly and dismantle included (they left it there for 3 weeks in fact). Pay more than 200 outside and you're being ripped-off...
- Q:Wheel buckle scaffolding rental price
- 1, according to the lease. Wheel buckle scaffolding per ton 3.5~4 yuan / ton / day.2 by meter lease. Convert down and not much difference, and trouble.
- Q:What is scaffolding pole, bar, scissors support?
- Bowl buckle steel pipe scaffolding when using steel pipe, as a single steel scaffolding, when the use of steel when the edge of the cross bar, for the steel based scaffolding
- Q:How to calculate the amount of steel pipe in the bowl buckle scaffold formwork system? What is the good software or experience of the eldest brother?
- According to the bearing capacity of the vertical bar, according to the gravity of the beam and slab, the stress analysis of the horizontal member is carried out
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Wall Formwork Formwork with Durable Performance for High-rise Buildings
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 200 pc
- Supply Capability:
- 3000000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords