Walk Through Frames/ H Frame Scaffolding

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
100 set
Supply Capability:
10000 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Walk Through Frames/ H Frame Scaffolding 


Outside Diameter: 1.69" 
Wall Thickness: 0.095" 
Lock: Drop Lock 
1st Lock: 6" from top of frame leg 
Lock Span: 4'

Coupling Pin Hole: Drilled at 45° Angle 
Coupling Pin Hole Location: 2½" from the top of the frame leg. 
Blue powder coating prevents rust and minor scratches.

 

Frame Scaffolding Advantages:
1) Reasonable structure, simple assembly, quick operation, safety & reliability;
2) Easy to carry and operate

3) Wide applications, for both inside and outside construction

Name

Main Frame Scaffolding H Frame Scaffolding

Size

5’x5’

Main Material

Q235

Surface Treatment

powder coating

Color

blue

Certificate

OSHA

Service

OEM Service available

MOQ

one 20'container

Payment

L/C,T/T

Delivery Time

About 20-30 days after confirmation

Packing

in bulk or steel pallet or as your request








why you  choose  us ?

1)Highest quality -never use any equipment that is damaged or deteriorated in any way

2)Safety -inspect all equipment before using

3)Competitive price - factory suppler direct

4)We have strong engineering team that can give best solution for your project

5)Cutting -Edge product development

 

Consult your scaffolding supplier when in doubt-scaffolding is his business .Never take chances

Our firm belief that our customer's success are the only guarantee of our success .




OEM severice avalible

1)our ability to customized production to meet customer's specifications and requirements

2)our focus on building deep long-lasting relationship with our customers 

3)our commitment to meet customers needs  

Quality comes first ,customers are the highest ,operate with honest





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Why is it necessary to keep records of all inspection carried out on scaffolds as stated in Regulation 39?
some times ppl die because of neglect and lack of mentainance so some have take responsobility for this
Q:How long is the service life of disc scaffolding?
In the service life of the product if the corrosion and deformation can not be put into the construction of the building.
Q:Bowl buckle scaffold inspection and evaluation
(2) the focus of quality inspection of structural parts:Steel tube wall thickness, welding quality, appearance quality, adjustable base and adjustable support rod diameter, and nut with gap and material.(3) scaffold erection shall be inspected at the stage:The first 1 paragraphs to a height of 6m for the first stage (left bottom stage) the inspection and acceptance;The 2 frame should be checked regularly with the progress of the construction, to achieve a comprehensive inspection and acceptance;3 cases of more than 6 winds, heavy rain, heavy snow after the special inspection;4 shutdown for more than a month before recovery.
Q:What does scaffold one's days mean? kill time?
In 60 years of using English in Britain I have not come across that expression, so it is probably rare. Scaffolding is put up to help build or repair tall buildings, so possibly that expression means 'to do something useful with one's time.' But a scaffold is also, historically, a place of execution (legal killing of prisoner), so the expression could mean indeed 'wasting time'. I have a faint feeling that 'scaffold one's days' was written by a non-native speaker of British English. It may be more common in the USA.
Q:How to calculate the vertical force of scaffolding
The calculated data include the following three values:1 uniform load value calculation,2 bending strength calculation: the maximum bending moment is considered as the moment under the uniform load3 deflection calculation: the maximum deflection is considered as the deflection of simply supported beam under uniform load
Q:What is the difference between Scaffolding and Zone of Proximal Development?
Zpd And Scaffolding
Q:29 meters outside the walls of the house of the two rows of steel pipe scaffolding installation, demolition
Homework is two, while the long rod is 273m; small bar is 51; rectangular fastener 187; butt fastener 55; rotating fastener 17; a 7 foot board 14 square meters. You can use this to derive the amount per square meter. (average length of 5 meters).
Q:How to calculate the fastener type steel pipe scaffold
1.1.2 provides for the temporary structure of the scaffolding structure, the structure of the importance coefficient of gamma 0 take 0.9. ?The scaffold structure design of 1.1.3 on reliability requirements, considering that there is no enough statistical data accumulated by the situation, determine the probability limit state design, should be consistent with our historical experience, if using a single coefficient method was designed, the single safety coefficient should be satisfied: the strength calculation of K1 = 1.5 the stability calculation; K2 = 2. To this end, in the calculation of the introduction of the material strength of the additional coefficient of gamma 'm' or resistance to the addition of partial coefficient gamma 'R, gamma' R= gamma 0 gamma 'm=0.9 gamma' m.
Q:opinions on scaffolding piercing and how to hide it from school :)?
While they're healing, they need to stay in so there's no way of hiding it. Wait until the beginning of the summer and get it done then
Q:Scaffolding steel planks with rubber end caps?
Maybe something like a window washers scafolding planks...?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range