Vietnam tower crane Q6024 (QTZ160) TC6024

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
5 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  

Quick Details

  • Feature: Tower Crane

  • Condition: New

  • Application: All construction projects

  • Max. Lifting Load: 12t

  • Max. Lifting Height: 189m

  • Span: 60m

  • Place of Origin:  China (Mainland)

  • Brand Name:CNBM

  • Model Number: Q6024 QTZ160

  • Certification: CE&GOST

  • Warranty: 12months

  • After-sales Service Provided: Engineers available to service machinery overseas

 

Main Features

1)  tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

   

Vietnam tower crane Q6024 (QTZ160) TC6024

Vietnam tower crane Q6024 (QTZ160) TC6024

Vietnam tower crane Q6024 (QTZ160) TC6024

 

Specification Parameter 

Vietnam tower crane Q6024 (QTZ160) TC6024

 

 Our Service

 

1.We can make special sample according to the customer’s requirement.

2. We have more than 60 professional technical team, provide best after-sales service

3. Fast delivery time

4. We have CE, ISO9001 and GS certification.

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:do you believe folding 1000 cranes?
no ive made more then that before and nothing happened to me
Q:What is the purpose of the stinger on Crane Flies?
ovipositor?
Q:I'm a 15 year old guy... and afraid of Crane flies and Spiders..?
girls will think its cute but dont tell the guys when you ask dont be too anoying but ya, its cute even if you are 15 years old
Q:How did they get that crane on the top of the Deutsche Bank bldg here by the WTC in NY?
They do it a few diferent ways: (1) They use another crane to put it up there (2) They fly it in - either whole or in pieces - usually with a set of helicopters (3) The pieces are lugged up in an elevator and assembled up on top Seriously, most cranes are bought to the site in pieces and assembled on the fly. They can usually put them up in a span of a few hours. They have the erection of the cranes down to a simple science nowadays. They can also build the crane by using a small crane at the start and building on that until they expand it out to a large one.
Q:how do you make a paper crane?
For okorder.com/
Q:How does a crane operator's knowledge of where the centroid is generally located for most uniform objects?
If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
Q:method how to assemble tower crane?
Generally tower cranes are self erecting. The first mast and jib sections are assembled at ground level. The mast and jib are then jacked up and another mast section inserted. If the tower crane is not self erecting then mobile cranes have to be used to assemble the crane.
Q:In Stephen Crane's novel The Red Badge of Courage, why is the war itself not even named?
There are references in the book to events during the Civil War. In addition, the time of publication by this American author left no doubt in any American's mind which war it referred to. The Spanish American war happened after publication and the primary war on everyone's minds was still the Civil War.
Q:How to improve tower crane industry in china?
Powerful okorder.com) manufacturing standards according to the rules of tower crane industry market economy.    Manufacturing industry is a huge system, the formation of a broad face, not one or two companies can do a good job. Powerful alliances to promote the group is a good idea, but it can not Arbitrarily arranged association, we must do things according to the market economy laws. A lot of problems are not necessarily be resolved by the professional industry, you can use the cross-industry solution.
Q:How is a Crane dismantled?
A okorder.com/

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range