Used Tower Crane Potain/BPR GT1000 tower crane

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
2 unit
Supply Capability:
200 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specification of 4t Tower Crane

1)      We are a professional manufacture of construction machine, have CE, ISO and GOST certification, with high quality and competitive price. The annual value of production has reached 400 million yuan, and keeps sustainable growth.

 

2)      QTZ40 tower crane is a combination of advanced technologies from home and abroad, it is equipped with a hydraulic self-raising mechanism and frequency-converting slewing mechanism.

 

3)      The crane has a complete set of safety devices, which can guarantee the safety and high efficient operation of the equipment, It is equipped with height limiter, moment limiter, radius-changing limiter and circumgyrating limiter, etc.

 

4)      Our products have been export to more than 20 countries. And we have applied robot automatic welding in our production line.

Creativeintroduce design philosophy single reducer dual output, the successful trial of a recyclable waste rack unit modular dual output construction lifts, lift the rack and pinion contact stress decreased by 50%, the transmission of the modular units can maximize the elimination of the error superimposed gear pair in the rack height direction, so that the whole movement is very smooth, greatly improving the rack and pinion and other key pieces of the life of this technological innovation for three national patents.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who is responsible for the construction of the pile foundation of the tower crane?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q:QTZ63 (Q5610) tower crane power, how many power parts, name, model specification, product number, date of appearance
All the details of the equipment are availableAs for power, it depends on the specific configuration of the frequency conversion and non frequency conversion will not be the same
Q:Tower crane and tower crane 5
Tower crane is tower crane. It depends on where you are and what you transport. These are the keys.
Q:How to explain and classify the types of tower cranes? What do QTZ80 and Q5510 mean?
P---- represents flat head (without tower top), and T----- is tower crane,TC------ is the English abbreviation of tower crane, that is tower crane
Q:Equipment safety of tower crane
The boom of a tower crane is divided into two types: horizontal and compressed arms. When the movable arm is horizontal, the carrier car runs along the horizontal arm with variable amplitude and amplitude, and the movable arm is longer, but the boom has a larger deadweight. The arm for the strut type when the tractor boom luffing mechanism pitch amplitude, amplitude motion than horizontal smooth, but its relatively small weight.The weight of a tower crane varies with its amplitude. The product of the weight and the amplitude is called the load torque, which is the main technical parameter of the crane. Through the rotary mechanism and slewing tower crane, lifting height, rotation and walking the inertial mass, so it needs to have good control performance, especially the lifting mechanism can fast, slow, heavy and light load installation fretting. In addition to the general use of resistance speed regulation, but also often use eddy current brake, FM, pole change, SCR and mechanical and electrical joint speed regulation. When the crane in the layout to drawing, especially in real estate development area, residential buildings, such as tower crane, but also to consider the safety distance of adjacent tower crane, two in horizontal and vertical direction to ensure the safe distance of not less than 2m, the adjacent tower crane tower crane and interference can not occur. Try to ensure that the tower crane in the wind is too large to be free of rotation. The safe distance between the rear arm of tower crane and adjacent buildings shall be no less than 50cm. The safe distance between tower crane and power line meets the requirement.
Q:What are the four major moving mechanisms of a tower crane?
Tower crane refers to the fuselage for the tower frame, can walk along the track, a crane equipped with rotary arm. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. It consists of three parts: metal structure, working mechanism and electrical system.
Q:Does tower crane belong to special equipment?
Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
Q:What role does the tower crane torque limiter play?
The torque limiter can play the weight overload or working radius beyond, beyond the technical performance of the tower crane at the moment, immediately cut off their own lifting or variable power source, will send the alarm signal to prevent the occurrence of accidents.
Q:Do self lifting tower cranes allow a small swing of the boom in jacking operation?
The upper working structure of the attached tower crane is connected with the jacking sleeve frame, and a jack jack is mounted on the top lifting jacket frame. The upper crossbeam of the jack is connected with the jacking frame, and the lower cross beam is provided with a movable claw, and the lower supporting point can fall on the step of the standard section of the tower body. During lifting, first trim jib and balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.
Q:What are the basic parameters of a tower crane?
The basic parameters of a tower crane include the length of the crane itself, the weight of the crane as well as the weight of the counterweight! Tower crane lifting mechanism; slewing mechanism; luffing mechanism; motor power;...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range