Used Cuplock Scaffolding for Sale,scaffolding parts,scaffolding pipe parts

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Material:

Q195-Q235etc





Surface Treatment:

Hot Dip Galvanized

Coupler:

Silver

Minimum Order Quantity:

40bags

Origin:

XinGang,China

Port of Loading:

XingGang,China

Model Number:

48-48.3mm

FOB Price:

USD 0.88-2.7 Per Piece

Delivery Time:

Within 30days

Packing Details:

Packed in woven bags or pallet. 25pieces one bag.

Packaging & Delivery

Packaging Detail:Packed in woven bags or pallet. 25pieces one bag.
Delivery Detail:Within 30days after receiving your advance payment or L/C

Specifications

1.Material: Q195, Q235, etc 
2.Advantage: easy combination, safety, stable 
3.Surface: Pre galvanized

Specifications of the Product

 

1)size: 48.3mm 
2) Min.Slip Load:10.5Mpa 
3) Distortion Load:18KN 
4) Weight: 0.5--1.5kg 
5) superficial treatment: hot dip galvanized; galvanized

 

6) Material:Q235,Q195etc

 

7) Size for tube:45mm 47.5mm 48.3mm 50mm

 

8) Production technology: Drop forged

 

9) Surface treatment: Dipping paint, Zinc plated, Galvanized.

 

10) Color: Red, Self color, Gold color, Silver color or as per customized.

 

11) Application: Connect tow scaffolding pipe for arbitrary angle( Swivel)

 

12) Quality: Excellent Anti-Broken/ Anti-Slipping/Anti-Resisting/ Anti-Rusting/Easily Installing

 

13) Standard:EN74/BS1139 swivel coupler

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:looking for a scaffolding job in dubai can anyone help?
Hi okorder.com, we are Dubai based scaffolding contractor.
Q:How long do you have to wait in between getting two piercings? cartilage and industrial (scaffold)?
You can have both done in the same day if you can handle the pain and shock. Get the industrial done first, and if you still feel OK afterwords, you can get your other ear done by the same piercer. Talk to him/her and let them know what you want to do before you start. If you feel like you need to wait after the industrial, wait at least a day before getting the second piercing. It's all about what you can handle.
Q:Sweeping rod, large cross bar, small cross bar, scissors brace, vertical pole, right angle fastener, rotating fastener, butt joint fastener, even wall piece! If there is a cantilever frame, the main beam, steel wire rope, such as pull down support
Mobile scaffolding is the main frame, cross frame, cross diagonal brace, foot board, adjustable base and other components. The cross rod is also called the diagonal pull rod, and is a cross connecting rod which is vertically connected with the two door frames. The part of both ends of the rod part is punched with a pin hole, and the locking pin on the vertical rod of the door and the frame is locked when assembling.
Q:Can I clean my scaffold piercing with my make-up wipes?
The reason why the earring will stick to the skin and dry up because you're using too much salt. Cleaning it with warm sea salt water is the best way to clean your piercing, especially soaking it in a bowl for 5-10 min. Make-up wipes have alcohol in them, which irritates piercings, just stick to salt. H2Ocean is great, it's a little pricey but it has the right salinity and other ingredients essential for healing tissues. It's not infected, it's just irritated because you slept on it. An infection will have pain, lots of swelling, dark yellowish pus, and throbbing. Give it a sea salt soak and the redness and soreness will go away.
Q:In the calculation of the bearing capacity of the scaffold, what is the axial force produced by the "N g2k" - the standard value of the component?
(3) the railings and retaining scaffold deadweight standard value (kN/m); the railings, bamboo amphipodsshouban baffle, the standard value of 0.15NG3 = 0.150 x 7 x 1.500/2 = 0.788 kN;(4) the load of the hanging safety facilities, including safety net (kN/m2); 0.005NG4 = 0.005 x 1.500 x 24 = 0.180 kN;
Q:Cantilever scaffold technical disclosure
Vertical bar, vertical horizontal bar (large cross bar) of steel pipe length of 3-6 meters, horizontal horizontal bar (small cross bar) steel pipe length of 1.1~1.3 meters, the lateral bracing steel pipe length of 3-4 meters.
Q:What's the difference between scaffold and industrial piercing?
Theres no difference scaffold is what they call it in like europe, indusstrial is usa
Q:According to the standard set up double scaffolding scaffolding to the number of meters per square meter
Once the calculation is qualified, you can according to the vertical distance
Q:What are the full house scaffolding specification
7 "technical code for safety of wooden scaffolding in construction" (JGJ164-2008)8 "safety management of construction enterprises" (GB50656-2011)9 "construction safety of the bowl buckle scaffold technical specification" (JGJ166-2008)
Q:industrial/scaffold piercing question?
id leave it. theyre hard to heal nyway,and the added pressure of the helmet and the sweat and the possibility of getting hit in the head and knocking the piercing....well, i wouldnt risk it

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range