used cuplock scaffolding for sale ISO passed in hot sale

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
10000 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Model Number:

YN-Cuplock-A037

Material:

Q235 or Q255 or Q345

Surface Finish:

Zinc plated, HDG, painting

Packing Ways:

In pallet or in bulks

Payment Terms:

T/T, L/C or others

Packaging & Delivery

Packaging Detail:In pallet or in bulks
Delivery Detail:with 20 days after signing the order

Specifications

used cuplock scaffolding for sale 
1.material: q235 or q345 
2.surface finish: galvanized or painting 
3.OEM is offer

used cuplock scaffolding for sale

 

 

Product Description

1. Material: Q235, Q255, Q345

 
2. Surface treament: painting or  hot-dip galvanized 

 

3. Elements: vertical, ledger, diagonal, top cuo, bottom cup and ledger blade

  

4. High strength bearing capacity

  

5. OEM service  as available

  

6. Inspection: by ourselves or by SGS,or B.V,or others. 

  

7. Samples are available 

 

Company Information

Our company is a professional manufacture and supplier for scaffolding and scaffolding accessories , our normal products as followes:

 

1. Formwork System

 

   Wing nuts and tie rods; Formwork panel

 

2. Adjustable Jack Base

 

   Hollow Screw Jack Base; Solid Screw Jack Base and Swivel Adjustable Screw Jack Base.The Accessories

   we can offer 

 

3. Adjustable Shoring Prop

   

    The normal light-duty shoring prop and heavy-duty shpring prop, also the accessories is available; as

    Itay-type shoring prop, Spanish-type shoring prop, American-type shoring prop; U-type shoring prop and

    Cross-type shoring prop we can offer.

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Scarlet Letter Scaffold scenes?
do you mean the part where she's on the scaffold with pearl when she's just born or when the three of them hold hands and then the priest has to leave? Well either way, the scaffold means embarrassment, it's like having to wear the A but being more upfront with people so you don't really have to explain yourself, everyone just knows. That's the reason, i forget his name, the priest that's pearl's father, goes up to the scaffold, because no one knows he secretly wears the A that's why going on the scaffold allows him to free himself of guilt, he wanted everyone to know so he would stop living in hidden pain but when pearl and her mother come, it makes it too real for him, he kind of wakes up, you could say, so he becomes too frightened and decides not to carry out his plan.
Q:On what page of The Scarlet Letter does Hester enter the scaffold?
i'm no longer completely constructive of the answer to this actual question, yet I only finished a unit in this novel and could like to help with any extra questions...be satisfied to invite -Alice
Q:I Just got an industrial piercing or Scaffold and im worried it might get infected?
sounds like what your doing is fine. just keep it clean that's basically all you can do.
Q:How to calculate the rental price of portal scaffolding
Fierce competition, is 2 yuan / sets / dayPulleys, pedals, and base are normally 1 yuan per day
Q:How to solve the problem of scaffold pipe repair
In the construction of the bending, torsional irregular steel tube to adjust the straight, mechanical transmission, reasonable structure, high efficiency, safe and reliable
Q:Can you do the outer scaffolding?
(4) the lower part of the inclined bar at 30 cm in height from the ground and control connection pole. (5) according to the height of the structure and the length and the width of the scaffold, it should be combined with the actual situation in the construction to set up the scissors and the diagonal brace. (6) the scissors rod connected by the lap, lap length not less than 100 cm, and not less than 2 rotating fastener, rod end edge to the distance of the fastener cover more than 10 cm. 8, laying the scaffolding board (1) scaffold set level in 3 horizontal bar, and the two ends at 8 cm with a diameter of 1.2 mm galvanized wire hoop around the 2 to 3 ring fixed. When the scaffold length is less than 2 meters, the two small bar support.
Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q:How many meters per square meter and the number of steel fasteners
According to the height of their own construction plans, according to the construction area of 1 square root, fasteners ranging from docking fasteners and rotating fasteners, rotating fasteners should be every square of the 3 bar, a detailed look at the old construction workers
Q:how did they turn the cells into a polymer for the heart scaffold ?
May have misunderstood. The heart is gently stripped of cells by using a detergent - this leaves the extracelllular matrix - a polymer of collagen - inert and insoluble. New cells (stem cells) will then be added to the structure to repopulate it with living heart muscle which gain coordination and structure from the matrix.
Q:Fastener type steel pipe scaffold composed of which components?
3.2 fasteners3.2.1 fasteners shall be made of malleable cast iron or cast steel, the quality and performance shall be in accordance with the current national standardRegulation of GB15831 for pipe scaffold fastener. Fasteners made of other materials shall be tested and verifiedQuality meets the requirements of this standard before use.3.2.2 fasteners in bolt tightening torque to 65N * m, shall not be damaged.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range