Uninsulated Flexible Duct and Insulated Flexible Duct Factories in China

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
500 pc
Supply Capability:
100000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

Features and Characters:

-Applied in Heating, Ventilation and Air Conditioning

-Non-insulated and insulated Flexible Duct offered

-Up to 150 and 250 high temperature

-Fire Retardant

-Corrosion Resistant

-High flexibility

-Convenient installation

-Non- toxic

Introduction

Flexible Duct is widely used in Heating, Ventilation and Air Conditioning (HVAC) systems for air ventilation applications. Flexible Duct provides greater thermal efficiency to save energy. The product is also covered in a heavy duty, silver jacket for durability. The vapor barrier prevents condensation forming on the outside of ducts carrying air. Because it is flexible, it is easy to run around and through obstacles in the building.

Non-insulated Flexible Duct

Structure: Two-layer aluminum foils +1 layer of PET film.

Non-insulated Flexible Duct
(2 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +250

Velocity of Airflow (Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

 

Non-insulated Flexible Duct
(1 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

 

Insulated Flexible Duct

Structure: 1 layer of Alu. Foil+1 layer PET film+ glass wool

Outer jacket: 1 layer of Alu.foil

Glass Wool Density: 16kg/m3; Thickness: 25mm

Insulated Flexible Duct
(2 Layers Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +250

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Insulated Flexible Duct
(1 Layer Alum. Foil+ 1 Layer PET)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow(Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

Fire-retardant Grade

S1

Standard Length

10m or 7.6m

Combined Flexible Duct

Structure: flexible duct PVC jacket.

REMARK: Special structure is available according to customer's requirements

Combined Flexible Duct (PVC jacket+ flexible duct)

Diameter

80-1200mm3''-48''

Temperature Range

 -30℃~ +150

Velocity of Airflow (Max.)

30m/s

Working Pressure

2500/Pa

Bending Radius

0.54*D

 

FAQ:

  1. What teperature maximum? Our products: 150℃ and 250℃

  2. What MOQ? Our MOQ: 500 pcs

  3. What payment terms? We accept T/T and L/C

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Gree air conditioning 50 heating and cooling mechanism heat when the host cooling network is how the matter
Can be small, according to your roof to do what material.
Q:Home 2 air conditioning is the cooling of electricity or heating electricity? How much power is spent in hours
But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
Q:External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @ .com
Q:Ventilation is very good, why still have to install fresh air system
You are a single raft toilet wipes Pie Tanzhuang open card would like to confirm what? Contract notarization or. The The If it is contract notarized, generally notary value of 0.25% -0.3%
Q:Air conditioning ventilation when the sound is a big reason
According to my specific circumstances, in the following seven major hazards include the division, sub-project focus on control
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q:HVAC Heating: What are the main components of the air distribution system?
Geothermal construction, the heating pipe spacing can not be less than 100mm, the construction can not be achieved, big brother!
Q:Public building design, the building structure and water is generally designed by the Architectural Design Institute, air conditioning and ventilation is based on the design of the interior? Or first air conditioning ventilation?
Normal heat absorption is also due to poor ventilation (dirty) and air humidity so icing
Q:The United States direct mail dyson hp01 Dyson air purification cooling machine triple in the country to warranty it
Embedded stove, such as the use of rubber tube connection, then the rubber tube in the platen, often subject to heat radiation easily aging; and aging, falling more difficult to find, so many local poisoning and other vicious accidents
Q:Do 3cm thick wall insulation how much kilogram of slurry and how many kilograms of polystyrene particles
Of course, is heating electricity. Heating has auxiliary electric heating, so electricity and electricity. Frequently open the fee, the air compressor is not good. 2 machine cooling power is 1700 watts, 1 hour is 1.7 degrees electricity. Heating with auxiliary electric heating power of 1500 watts, 1 hour is 3.2 degrees electricity.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range