• Unconventional Rhombic Form Traveller with High Quality System 1
  • Unconventional Rhombic Form Traveller with High Quality System 2
Unconventional Rhombic Form Traveller with High Quality

Unconventional Rhombic Form Traveller with High Quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

UNCONVENTIONAL RHOMBIC FORM TRAVELLER

The front tranverse beam gravity height of unconventional rhombic
form traveller is betwwen the height of rhombic form traveler and
triangular form traveler. Comparing with rhombic form traveler and
triangular form traveler, it has the advantages of low gravity height,
more operational space than triangular form traveler, easy operation,
safety during walking and firm anchorage, etc..

● Low gravity of front trancerse beam

● Applicable to large-scale stay-cable cantilever casting bridge with wide bridge deck

● Safe & easy operation, easy fixing, and safty during walking

● Big operational space under the main frame, and easy installation and removal

Q:Can the vertical prestress of the hanging basket be tensioned after the subsequent section construction?
In order to improve the service performance of prestressed structure, during the construction to the structure of pre applied stress structures of pre compressive stress can be wholly or partially offset load caused by tensile stress, avoid structural damage. Commonly used in concrete structure, concrete structure under load is before, in advance to put pressure on it to make it in the outside load when the concrete tensile stress compressive stress produced in order to offset or reduce the load due to the tensile stress, the structure in the case of normal cracks or crack late.
Q:Combined with the hanging basket pouring construction process, the paper puts forward the quality control points and methods of hanging basket continuous casting box girder
The key points of quality control: 1, hanging basket template (including the bottom mold and the side mold) elevation 2, hanging basket preloading ensuring the load quantity; 3, the hanging basket forward, need special attention, when the cradle walking the preparatory work before the improvement, check again walking and walking condition of anchor beam connection rod the bottom, hanging point should adopt steel wedge pad, and ensure the stability of suspension;
Q:I would like to know that each piece of the construction of the hanging basket is connected by way of the whole as a whole, I always think of each section is a section of tension.As you said, the steel strand is the length of the whole beam, but how to form the whole concrete?
Pour the mud into the joint! Elephant building interface!!! Have to reinforce!! Reinforcing bar! That's it.
Q:Seven techniques of hanging basket
10.5. tube. When the concrete is vibrated, we should pay attention to avoid the bellows to prevent the vibration rod from leaking;10.6. to nap. Because of concrete pouring, the surface still paving asphalt concrete, in order to enhance the bonding between the deck and asphalt layer layer of political government must firmly on the concrete surface roughening treatment:10.7. maintenance. After the concrete pouring, maintenance to improve the strength of concrete and prevent the formation of fine cracks, has an important role. Therefore, water conservation should not be less than seven days.
Q:What is the use of hanging basket
Are you talking about the construction of the bridge? Generally refers to the construction of continuous beams do not support the use of a special construction process
Q:Construction of extra large bridge
Install side span closure section, installation of hanging mold closure segment skeleton, formwork, steel banding, installation of prestressed pipe and the core concrete pouring, side span closure segment and maintenance - tension closure segment longitudinal, transverse and vertical prestressed grouting, removing the side line and cross - - side span closure segment construction support the landing gear box girder.
Q:The hanging basket is the main equipment of the cantilever pouring construction of the bridge
Hanging basket is the main equipment of cantilever pouring construction of bridge,
Q:Is there any paperwork and forms a traveler from USA to Dubai should look into?
You do not need any paperwork if you travel to Dubai. USA citizens do not need visa for Dubai. You can just go trough the immigration and they will give you a visitor visa for 30 days.
Q:In the construction of the bridge hanging basket, the temporary prestressing force is adopted in the closing section
Almost the same procedure. Install jack, Jack extended a distance, not fully stretched
Q:Can you list all the characters form The Time Traveler's Wife? Help!
Henry DeTamble Clare Abshire Gomez Charisse Annette DeTamble Richard DeTamble Mrs. Kim (Kimy) Dr David Kendrick Alba DeTamble Lucille Abshire Phillip Abshire Mark Abshire Sharon Alicia Abshire Ingrid Celia Attley Ben Etta Nell

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords