Ultraviolet Sterilizer

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Ultraviolet Sterilizer

1)Requirements:220V/50HZ;
2)lamp life: 9000 hours or more
3)Reactor sterilization's standard 304 stainless steel (316L optional
4)Sterilizers shell mechanical polishing processes, user requirements can also be used   Electropolishing

Model     Flow Rated(MT/H)             Power(W)  Caliber  Pressure         Size(CM)
UV-XH05         1                             28           R1/2        0.6            68*10*19
UV-XH08         2                             40           R3/4        0.6            93*12*22
UV-XH14         3                             40          R3/4         0.6            93*12*22
UV-XH22         5                              75          DN32       0.6            93*12*24

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:After the powder metallurgy parts are machined, how to prevent rust?
1, the traditional method: soak kerosene can be short-term rust prevention, but do not expect long-term rust prevention or transportation process rust prevention, rust prevention period is generally in 1-3 months or so.
Q:A workshop needs to be packed with machine parts. 5 boxes are packed in 80
5 boxed with 8020 boxes are 4 times as many as 5 boxesIn other words, the 4 5 boxes are 20 boxes80 x 4=320So I can't finish it
Q:The true size of a mechanical part is based on what is on the drawing
The most accurate size is dimensioning! You can't draw correctly, but as long as the marking is correct, the processing is in accordance with the dimensioning!
Q:Air conditioning installed in the outer machine packaging, found a small part, please master to help see what is this?
Maybe the workers were not caught in the right place and they fell off during the transportationAfter installation, the blade is unbalanced, the sound of the outdoor fan will increase, and the long time use will also affect the durability of the outdoor fan motor
Q:How to package machined parts?
What questions do you ask? How to pack the machine parts, isn't it? If that is the case, I can tell you, basically the packaging machine large cast iron parts are lathe, milling machine, planer, do it.
Q:What are the main parts of small vacuum machines?
Hot pressing device and printing deviceThe device is installed in the vacuum chamber, there are usually two groups, a group of single room tipping activities arranged on the lower part of the vacuum chamber and double chamber reciprocating movable part is arranged on the upper part of the vacuum chamber, active device mainly consists of the following parts, heat sealing chamber is fixed on the upper vacuum box room two, head guide column and a spring reset device, hot press frame seat two head guide sleeve is sheathed on the guide pillar, heat sealing between the gas chamber and hot box frame seat is provided with a heat sealing chamber (also known as atmospheric vacuum chamber, said heat sealing chamber for small room heat) sealed air chamber is provided with plastic pipes, two head with a pinch clamp, rubber adhesive processing water is also useful a bicycle or a manpower vehicle tyre, the middle has a gas nozzle, hot pressing frame body with epoxy boards fixed pressing frame seat, two head belt rolling shaft, the winding shaft roll of Ni Cr alloy belt Tight positioning, covered with heat sealing cloth. The fixed part device mainly printing tape and tape box printing, printing glue used in silicone rubber processing, a plane with twill or straight lines, the other side is provided with a round or square hole, the silicon rubber used for processing of words or characters embedded in the park, in the seal and printed on the concave transparent production date. If need is needed in the color printing, printer ribbon. Small treasure vacuum machine
Q:What's the price difference between feed packer and organic fertilizer packing machine?
Organic fertilizer packaging machine and feed packaging machine is still the main difference between, in the mechanical structure, equipment selection, components and so on
Q:What is the principle of cleaning machine parts? How should the parts be kept after cleaning?
The cleaned parts should be kept in a dry, ventilated place and coated with a thin layer of butter when necessary. Flat type parts must be flat, the middle shall not be suspended; shaft parts can not be placed flat, must be vertical suspension, to prevent bending.
Q:What are the components of mechanical equipment (automatic equipment)?
I have been away from this industry for a long time, and I can't give you any specific suggestions. But I think you should be more specific in the process of machining. It is estimated that it is a precision machine component, and the material requirements are relatively high. But I think in principle, we should look for local steel mills with special steel production capacity, and the other one depends on the local technical strength, such as northeast China and Shandong, where the strengths are in large equipment. Jiangsu Shanghai side of the precision mechanical technology strength in the country should be relatively strong.
Q:The standard problem of parts in mechanical drawing
A total length of a certain truth, such as easy cutting, easy processing (such as the big machine, easy to heat treatment), ease of assembly, so that people see, you should take control of size is not important for the free length to form a closed size.Mechanical drawing dimensioning can improve product quality and improve production efficiency, which is not necessarily inconsistent with mechanical drawing standards, which has a lot to do with practical experience, especially the choice of benchmark.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range