Two-mast Aluminium Lift Table

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
500 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Two Masts Aluminium Lift Table with high strength aluminum alloy materials, lift with beautiful shape, small volume, light weight, flexible operation, easy to implement.Landing a smooth, safe and reliable advantages.

This lift is used in plant, hotel, building, shopping mall, station, airports, stadium, etc. Also can be used on a power line, lighting appliances, elevated pipeline protection, the floor clean install etc.


Overload emergency safety protection device.

Safeguard valve to avoid hydraulic pipe rupture.
Emergency manual hydraulic valve to cope with power cut.
Double chains greatly improve the safety factor.
Electrical control, or manual pump control when the electricity is not available.
 Power 220v/380v, 50hz/60hz; battery driving optional.

 

 

 

Model

Capacity

Table size 

Max height

Working height 

Total dimension

Weight 

YBC0.2-6

200Kg

1380*600mm

6m

7.7m

1500*900*1980mm

550Kg

YBC0.2-8

200Kg

1380*600mm

8m

9.7m

1500*900*1980mm

600Kg

YBC0.2-10

200Kg

1480*600 mm

10m

11.7m

1600*900*1980mm

700Kg

YBC0.2-12

200Kg

1480*600 mm

12m

13.7m

1600*900*1980mm

800Kg

YBC0.2-14

200Kg

1580*600 mm

14m

15.5m

1700*900*2320mm

900Kg

YBC0.2-16

200Kg

1600*600 mm

16m

17.7m

2000*1000*3000mm

950Kg

 YBC0.2-18

(four -mast)

200Kg

1700*950 mm

18m

19.7m

2300*1500*2850mm 

2200Kg

 

 

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How are the baskets assembled?
The basket is the risk factor is high altitude operations, this basket production vendors so that Lida basket in the pre construction and installation must be careful when, in order to avoid what accident
Q:What are the basic components of the overhead hanging basket?
Gondola structure: the structure is divided into three parts: suspension platform, wire rope, sling suspension platform containing platform, elevator, safety lock and limit switch, the control box containing suspension frame, weight lifter
Q:What issues should I pay attention to when removing the galvanized basket?
1, before the demolition of the basket to conduct a comprehensive inspection, record damage. 2. Park the platform on the flat ground and remove the rope and tie down the iron. 3, the power cut off Lida electric basket.
Q:How many kilograms weight can the basket hold?
ZLP500 basket: 1) platform length: 5 meters (2.5 meters) 2.5 meters) 2 load: 500 kg 3 Motor Power: 1.5 kW)
Q:High altitude hanging basket in construction, sudden power failure, emergency measures
The faulty hoist must be overhauled before it can be put into use. At one end of the rope breaking safe lock, lock the safety rope, must be professional maintenance personnel for risk. In the risk process, we must pay special attention to action to light, smooth, avoid hot galvanized electric basket safety lock suffered a major impact accident. When the nacelle is repaired and disassembled, the power supply must be cut off first, and the warning signs of "maintenance forbidden" and "demolition and disable" are set up in the marked position, and special personnel are put in charge
Q:What is the power of the zlp630 electric basket?
At present, the use of electric basket has gradually become a trend, in the high-rise building construction, installation, maintenance and construction of curtain wall insulation cleaning exterior wall has been widely recognized by higher operation, and can be used for large tanks, bridges and dams and other operations.
Q:What are the structural components of an electric gondola?
The basket by the suspension mechanism, suspension platform, hoist, safety lock, steel wire rope, wire rope and electric box and electrical control system for main parts. For the convenience of transportation and transportation, the products are broken down by parts or groups and parts when they are transported out of the factory and assembled into the whole machine after the construction site. The suspension mechanism is installed on the top of the building work at the supports, a steel wire rope to steel structure under suspension platform, rated load weight, (see Figure two: suspension mechanism) were using two sets of suspension mechanism.
Q:How to use an electric basket properly?
Every time before operation, we must conduct a comprehensive inspection of the safety lock, including lock rope distance is consistent with the standards, both ends of the bottom surface of the electric basket height is consistent with the standards. If the standard is not met, the work is not allowed.
Q:What kind of hanging basket can be used for exterior wall construction?
That is, from the roof to drop a basket, which inside the wall or other parts of the construction methods ~!
Q:Construction basket operation certificate is not able to operate?
5, basket installation, demolition must be prepared special program, after approval procedures, strictly implemented according to the program, the implementation process should be designated security alert area, and set up care personnel.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range