TUV Solar pv cable 2x6mm²

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
2000000 m/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Specifications

Solar PV cable

1.Used in photovoltaic system.

2.Comply with TUV and UL 4703

3.Wildly use in solar system



Application Solar PV cable

Used in photovoltaic system. Comply with TÜV 2PfG 1169/08.2007 and UL 4703


Product Description

Double core:

1.Rating:Voltage: 600/1000V  Temperature:-40°C-- 90°C


2. Description: (1)Conductor:  Tinned annealed  copper


                     (2)Insulation:120°C  XLPE , black


                     (3)Jacket:120°C  XLPE , black or red


3.Marking:TÜV  2  PfG  1169  PV1-F  2×**mm2



4.Application: Specifically designed for connecting photovoltaic Solar system Power


Packaging & Shipping

1 1*4 mm2    12500 Meters/Pallet  

2 1*6 mm2    10000Meters/Pallet    

3 1*10mm2   6000 Meters/Pallet

4 1*16 mm2  4000Meters/Pallet

5 2*4 mm2    6400 Meters/Pallet

6 2*6 mm2    4000Meters/Pallet

One 20” Container can load max 20 wooden  Pallets or Boxes  

Load :1*4mm2  solar cable 250km,1*6mm2 solar cable 200km

         2*4mm2 solar cable 128km, 2*6mm2 solar cable 80km





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Some old videotapes want to transfer to the computer, the video recorder is the old video and audio jack, the video capture card collection need to line it? Expert help out
Mechanical and solid interface is the same, the power cord is the same, to find just fine.
Q:Online to buy the charge hand drill would like to change the cable power supply, what kind of power supply?
Duckbill jumper is generally used in the 110 patch panel and program-controlled switches used for the connection.
Q:The type of cable splitter box for the cable splitter box
CPU: I5-4590 (day cat 1203 yuan) Motherboard: ASRock Player Extreme B85 killer version (day cat 499 yuan) Memory: Kingston DDRG single (day cat 229 yuan) Graphics: MAXSUN GTX750ti Big 2G (day cat 699 yuan ) Hard disk: Western Digital WD10EZEX1T desktop computer hard drive 1TB (day cat 286 yuan) Power: Hangjia rated 450Wjumper450B power supply (day cat 279 yuan) Chassis: cooler Extreme Destroyer second generation (254 yuan) This is more than .000 yuan configuration The
Q:Decoration laying composite wood flooring, will the line pipe can be laid directly on the ground, need to be on the ground trough, or how to go.
Drawing above is very clear, the system map is also more detailed, want to learn the budget, to start from the drawings, and then can work well, hope to help you,
Q:Under the power to go back line, the length of the power cord is not enough how to solve?
Standard for design of cross - sectional area of ​​static and static cross - over copper core between flammable and explosive pipelines
Q:Will the line when the tube, a loop is not to use a tube, air conditioning lines and lighting lines can be used with a wire tube?
In the circuit buried bus pipeline, the two points between the pipeline can not be more than two right angle bend (pipeline length of 15 meters), more than two right angle bend or pipeline length greater than 15 meters, need to increase the cable box. From the description point of view, you should be the circuit wiring is not in accordance with the norms of operation, a line between the more than two right-angle elbow, right angle elbow, and certainly will lead to the wire can not penetrate, follow-up can not be replaced, The "dead line". As far as your current situation is concerned, I suggest that you re-route the pipelines to re-optimize the pipeline to operate in accordance with the standard operation.
Q:How to choose the diameter of the power cable threading protection tube?
There must be a difference ah, use different, the characteristics of the material will have to make the appropriate adjustments.
Q:Metal trunking national standards, wire and cable bridge national standards
Look at the instructions or call the cable company to install
Q:How to use a multimeter to measure the power line barrier
Integrated wiring strength bridge spacing between the specifications which is written?
Q:I would like to cut off the USB extension from the power cord and then connected it, how can not use?
Yes, so no electricity when the power supply time is correspondingly longer.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range