Product Description:

Building Tunnel Formwork:

A compositional steel formwork system mainly used in the building which has regular structure

without beams, the excellent formwork system can make the integral pouring for the wall & slab

easily achieved.


Characteristics:

◆ No assembling, easy operation with formed formwork.

◆ High stiffness, make perfect shape for concrete.

◆ Repeatedly turnover is available.

◆ Widely applied range, such as building, bridge, tunnel, etc.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to arch the arch concrete pouring
Small pipe or large, medium pipe shed is the advanced support for the broken rock area or into, out of the hole, of course, grouting, grouting without losing the significance of the implementation.
Q:There are no recycling tunnel templates
Tunnel template, as far as I understand, is the tunnel two lining template
Q:On the measurement of total station
Slag road slope line, shotcrete receiver measurement, measurement of highway tunnel excavation section, the most important measure is the monitoring and measurement precision of total station but couldn't finish that much. Ha-ha
Q:Tunnel steel arch behind the steel mesh after a layer of fine iron wire mesh what effect is there?
5, the construction of the lining structure in the construction process of the power tunnel, the construction of the first lining structure is the eighteen word construction principle of the strong support principle. Construction of lining structure is the guarantee and foundation of tunnel construction safety.
Q:Concrete construction technology of tunnel roof?
Concrete construction technology of tunnel roof:Due to the main roof, the floor of a large amount of concrete pouring, consider the construction period and other factors, the site is equipped with 2 sets of automotive pump or HBT60 pump and 300m Phi pipe and a variety of accessories.
Q:How to set the location of the tunnel trolley,
The first measurement group with total station will be five points (template center, 2 large side mode along the point, 2 small side mode along the projection point) in lofting invert, with nails into the inverted arch concrete as a symbol, and note the nail surface elevation
Q:What are the safety awareness of the tunnel lining formwork trolley?
No special requirements, not special equipmentFirst of all, it must be the track, the sleeper to the sleeper rail
Q:Main diseases and prevention of tunnel
Main diseases and prevention of tunnel1 over excavation in tunnel excavationPhenomenon: in tunnel excavation, the upper, lower, left and right contours are exceeded.The reason analysis: the measurement is not allowed, the deviation is big; the hole position deviation is bigger; the hole in the hole drilling process does not have the straight hole to have the slanting hole to exceed the limit; the blasting parameter choice is wrong, the charge quantity is too much or unreasonable.Preventive measures: to ensure the measurement work turnover review system; accurate calculation of blasting parameters, the formal process test before entering the tunnel, timely adjust the parameters change of geological condition; hole position and direction control in drilling process.
Q:How to remove the template of the two lining trolley moving outside the tunnel
The template is removed, the car generally has a fixed track, easy to move. What do not understand, you can secretly I hope to help you!
Q:What is the width of a ring in a tunnel
Generally used in the tunnel as a two car lining template

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range