trolley mechanism 5D3V4

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction

According to the France Potain Companys mature technologies and requirements, the series of the mechanism of the buggy is designed, and it is consitituted with the three-phase asynchronous motor torque, the inner planetery reduction gear, wound roll, rack, and other componets.Through voltage regulation and an eddy current brake role can be low, medium, high rate, the electrical own electromagnetic disc brake, a brake steady speed, brake safe, reliable, accurate positioning, the most suitable for Potain tower crane series and replace imported products.

Performance parameters

Model:5D3V4

Rated stalling torque of torque motor(N.M):95

Rated single rope tension (N):4500

Single-rope linear velocity(m/min):0-58

Rope capacity(m):56

Relevant parameter of the suitable tower crane

--Max lifting load(t):0.10

--Max crest(m):58

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Calculate how much power the crane has?
the crane ?? The crane is not defined.
Q:does it really take a crane to build a crane?
No. They are lifted into place in sections by one or more other cranes, the telescopic arm kind, which are either in a nearby street or on the building site. I watched several being built and then dismantled over a period of three years at a large development across the street from my house. However, I saw a TV programme about how they built one on top of a mountain, and there they used helicopters to lower the sections into place.
Q:Minimum QTZ63 tower crane special electric box open for many A
QTZ63 tower crane with air and leakage protection:Minimum three-phase air switch not less than 100A; at the same time leakage protector is not less than 100A three-phase four wire system leakage protection.Maximum three-phase air switch not greater than 150A; at the same time, leakage protector is not more than 150A of three-phase four wire system leakage protection.
Q:I need information about the author Stephen Crane?
Q:The Red Badge Courage by Stephen Crane?
My Lord, I read that book over 30 years ago.....If I remember correctly, not that enthralled by it.
Q:view severe crane accidents?
Although mechanical failure does occur, most crane accidents are caused due to human error. Here are some examples: 1) Operating a crane during adverse weather conditions, such as wind conditions 2) Overloading a crane/ improper load calculations 3) Inexperienced or untrained personnel 4) Improper rigging of the load 5) Bypassing safety devises 6) Improper selection of the crane for the environment (ground conditions, power lines etc.) based on the type of load 7) Shock-loading a crane 8) Failure to perform maintenance and inspections in accordance to manufacture specifications I hoped this helped Cheers
Q:do you know how to make an origami paper crane?
Video okorder.com/
Q:Have you studied Tiger and Crane Kung Fu? ?
I okorder.com/ Gung Gee Fook Kuen: Taming The Tiger Fu Hok Sueng Ying Kuen: Tiger and Crane Double Form Tiet Sin Kuen: The Iron Thread
Q:Sand hill crane Population of Florida?
Sand Hill Cranes are migratory birds. Their population will vary based on the time of the year.
Q:which crane makes only one Life Partner ?
Apparently, although traditionally, most cranes were thought to mate for life, recent research suggests that they do actually change partners during their lives. I don't know how extensive or how conclusive the research is, or what species it involved, but it does suggest that the folktale may not be true.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range