Tractor Truck XHH-C5B/ZZ4184K3616C1TYPE

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
15 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Description for XHH-C5B/ZZ4184K3616C1TYPE 

Complete Vehicle Kerb Mass(kg) 6100

 Maximum authorized total mass (kg) 18000

 Maximum authorized towed total mass(kg)  243,002,810,030,900

External Dimensions(mm) Length 5950 Width 2490

Height 298,036,103,630  wheelbase(mm) 3600

Minimum Ground Clearance(mm) 250

 

Features for XHH-C5B/ZZ4184K3616C1TYPE 

Maximum Speed(km/h) 95

Economical Speed(km/h) 80

Maximum Gradeability(%) >25

Turning diameter(m) <24

 

 

Specifications for XHH-C5B/ZZ4184K3616C1TYPE 

 Tractor Truck XHH-C5B/ZZ4184K3616C1TYPE

 

Pictures for XHH-C5B/ZZ4184K3616C1TYPE 

Tractor Truck XHH-C5B/ZZ4184K3616C1TYPE

Tractor Truck XHH-C5B/ZZ4184K3616C1TYPE

 

FAQ for XHH-C5B/ZZ4184K3616C1TYPE 

 

Q:what is recommended Configuration Engine Engine Type A:WD615.92,WD615.93,WD615.93E,WD615.92E,WD615.92C,WD615.93C,WD615.97C,WD615.97E

 

Q:How many tyres for option?

 

A:tyre11.00-20 18PR,11.00R20 18PR,12.00-20 20PR,12.00R20 20PR,295/80R22.5 18PR

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:hoew do you start a waste paper recycling plant ? what are the machineries required?
the fee could rely on how large the plant replaced into. you are going to be able to desire to start with a bypass decrease paper shredder and a 5 gallon (19 liter) bucket and a water faucet. So it would desire to fee everywhere from approximately $one hundred to $a million.5 Billion, i assume. additionally the earnings could rely on the size and performance of the plant and the quantity and fee of hard paintings required.
Q:If you were being crushed by a heavy machinery to death, would you scream like a girl?
I would angrily try to clutch at the woman who was responsible for my death until I stopped moving and my red eye flickered out and then the whole screen would fade to black.
Q:How the pendrive made ? Manufecturing, components and machinery required.?
I think this technology is not available in India. Generally these things are imported from China.
Q:Explain why machinery used on a.c supply is usually rated in kVA instead of kW.?
Because most machinery present an inductive load and so has a less-than-unity power factor. The current peak lags the voltage peak in the two waveforms. However, as the current is drawn at a lower voltage (away from the peak), the load current is higher to get the same overall power to the machine. eg. if it took 20% more current to make up for the voltage phase offset, a 1000W load would be taking the same current as a 1200W load at unity power factor. That's the VA rating, it's equivalent to watts at unity power factor.
Q:Is this a 1245 machinery?
I suppose since the total gain is $6000 and the depreciation taken was $9000, then the $6000 gain would all be recaptured as ordinary income under Section 1245. So the answer would be a.
Q:caterpillar machinery windows?
You can get an exact replacement window from cat but it will be expensive ($300 or more) depending on the size of the window. You can call the local cat house and they will be happy to give you a price, you will need the model and serial number for the parts man to look it up. If it is just broken glass and the gasket and frame are OK you can go to a local glass company and get a new window cut which should save you some money.
Q:What is construction machinery?
A general term for construction machinery used in engineering construction. Widely used in construction, water conservancy, electricity, roads, mines, ports and national defense and other fields of engineering, a wide range of
Q:What are textiles machinery?
Spinning wheels Cotton gins, harvesters
Q:In Tally7.2 I have to pass journal entry of Machinery purchased?
Well you are not very clear with yoUr question , you need to be clear about what you are trying to do, Did you receive an invoice for the fixed asset or the payment has already been made ? answer would depend on the situation: Although i think the main entry you are after is DR Fixed assets ( machinery) DR VAT paid- (assuming Ur sub ledger doesn't pick up any VAT) CR Trade creditors see the above entry when ur paid first and purchases the machinery in last month and invoice received in this month u can take vat Cr ok it will depand upon this type of situation
Q:classical music song that evokes heavy machinery in a factory?
There is actually a piece called 'Iron Foundry' by Mossolov. Perhaps it's that.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range