Tower Cranes of the Construction Equipment QTZ80(6010)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
1000 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTZ80(6010) Description

Feature: Tower Crane                  Condition: New 

Application: urban construction    Rated Loading Capacity: 8T 

Rated Lifting Moment:600KN.M    Max. Lifting Load: 6T 

Max. Lifting Height:160M               Span: 60M 

Model Number:QTZ80(6010)

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTZ80(6010) Features

1.Advanced technical parameters, max. Radius is 65m, max. Height is 200m. Good looks, popular in China and the world.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Advanced painting process

4. New designed mast, can be used to Internal and external climbing tower crane

5.Speeds of trolleying and slewing mechanisms are high, good speed adjusting performance, excellent stability.

6. Engineers available to service machinery overseas.   

QTZ80(6010) Specification

Tower Cranes of the Construction Equipment QTZ80(6010)

QTZ80(6010) Pictures

Tower Cranes of the Construction Equipment QTZ80(6010)

Tower Cranes of the Construction Equipment QTZ80(6010)

Tower Cranes of the Construction Equipment QTZ80(6010)



QTZ80(6010) FAQ

Q: What is the main structure of building hoist?

A: The P/M construction hoist mainly contains metal structure, driving system, electrical control system, cable guide & protection system, electrical top crane and safety device.


Q: How can we calculate how many mast section we need?

A: Mast section height is 1.508m, you can use the client’s building’s total height divided by the height of mast section, and you will get the quantity of mast section.


Q: How many tie-ins are needed?

A: The tiein is the linked part between mast and building and it is used to keep the stabilization of the mast. Distance between the tie-in is about 6~9m.




Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Some questions about the 1000 paper crane myth?
The myth seems to surround the FOLDING on the 1,000 cranes - it is the sacrifice on the part of the person doing the folding that is the magic not the cranes themselves. See the Wiki......
Q:Do US Navy Boatswains Mates Operate Cranes?
In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www.public.navy.mil/bupers-npc/re...
Q:How did the tower crane rise on the construction site? Fifteen
It's not a cable, it's a steel bar! Scaffolding
Q:What is a better name than Frank Crane for a story hero?
I just read your skimmed through your story very quickly. His personality from what I got from the story seemed to fit the name Frank Crane very well. I like the name for that character. Not sure what other name options you have in mind though, maybe you should post some other naming options. BTW, cool story.
Q:lifting a machine with two crane and a beam?
You left out crucial information and working it out with risky assumptions takes too much work. Whatever this was supposed to mean Machin connect to beam in 3 point What is missing is whether the cranes connect to the end and the entire weight of the machine is in the middle - or is the machine attached at 3 distributed points. In addition, there has to be some condition - looking at the ASTM spec will give strength, but you have specified whether the beam is to be just at failure or 50% safety factor, etc.
Q:How much more than m of tower crane jib winch point height should be equipped with anemometer
According to the regulations of JGJ196-2010 for the safety and safety of installation, use and disassembly of tower cranes for construction purposes:
Q:Common themes in Stephen Crane's works?
Stephen Crane Works
Q:Tower crane attached concrete pump can be? Are there any state regulations?
The state expressly states that it is not possible to have serious safety incidents in Hunan and Zhuzhou before
Q:On an offshore oil rig, is the crane the same as the flare boom?
Flares are used to burn off oil and gas that can not be transported to be processed without extensive costs. They can also be used at refineries as a safe way to release gas build ups in case of problems in the refining process occur. I imagine that a flare boom could be on the end of the crane but I know it's not always the case. The crane does what cranes do best... move things, usually from the ship to the platform or vise versa.
Q:Examples of filling and acceptance forms for tower cranes and examples of filling in.
3 no or no inspection items are completed". In the absence of such or part of the sub - item, it shall be drawn on its serial number".

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range