Tower Cranes luffing self-raising electric QTD80

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

QTD80 Description

Feature: Tower Crane                  Condition: New 

Application: urban construction    Rated Loading Capacity: 6T 

Rated Lifting Moment:600KN.M    Max. Lifting Load: 6T 

Max. Lifting Height:32M               Span: 60M 

Model Number:QTD80

Certification: ISO9001:2000; CE;Ukraine & Belarus Certificate 

Colour: Orange/ Yellow 

After-sales Service Provided: Overseas third-party support available 

QTD80 Features

1.Ten years of experience in supplying new self-erecting tower crane with Taiwo Brand.

2. Export to more than 20 countries with CE/ISO/GOST Certificates.

3. Stationary/Travelling, external/ internal climbing tower crane 

4. Impeller blasting/rust protection paint

5. Advanced painting process

6. Potain masts designed with dismountable panels, making teansport easier and cheaper. 

7. New designed mast, can be used to Internal and external climbing tower crane

8. Engineers available to service machinery overseas.   

QTD80 Specification

Tower Cranes luffing self-raising electric QTD80

QTD80 Pictures


Tower Cranes luffing self-raising electric QTD80

Tower Cranes luffing self-raising electric QTD80

Tower Cranes luffing self-raising electric QTD80

QTD80 FAQ

Q: What is the function of the monitor?

A: Monitor, namely inspection system (like black box), which could store 10000 tower crane operation reports, and it is recommended to be installed in big cranes more than 16t.


Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.


Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.





Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How does a crane get down from a skyscraper once they're done using it? Like the crane on top of the skyscraper, do they get take it apart?
Can only be assumed that the jibs are first dismantled then the actual crane base lowered down by a second crane or even helicopter
Q:what is the proper way to fold a paper crane?
I would go to a library or a book store and find a book on origami.
Q:What is the brand of ZOOMLION tower crane?
This is not very good answer, the United States originally used Tianshui 213, and then used the Japanese MITSUBISHI, used Schneider, LG, star power, Eaton.
Q:Will My Tripod Support a Crane?
Please let me know where you will be so I can capture the video of your camera crashing to the ground. Because you overloaded the tripod, there will be no warranty coverage for anything. Yes, they can tell. ++++++++++++ I realized I had not provided an alternative... the crane specs also specify Camcrane 200 mounts on the 3/8 standard bolt found on the majority of medium and heavy duty tripods an
Q:how do they get the construction crane onto the the tall buildings?
If the crane has a mountaineering physique it is going to diminish itself down, removing its very own tower sections till it somewhat is low adequate to be bumped off by potential of a cellular crane. If it doesnt a smaller crane stated as a derreck crane would be set up on the roof of the development, it is going to take the tower crane dowm, as quickly because it somewhat is bumped off the derreck crane is disassembled and taked down by potential of the homes raise
Q:How do they get large cranes on top of buildings?
they build it peice by peice.
Q:What are the climbing claws on the tower crane?
You mean the set section? Used to be rubber, and later found that when the top of the friction is too large, not too good, plus plus the festival, but also always remove the standard section paint, and now basically the pulley
Q:Protective earthing resistance of tower crane
Q:How Do You Build A Hydraulic Crane?
The first (visible in the first link) is the boom angle pistons. These are mounted to the rotating section and to the boom. The second hydraulics are inside the boom arm. The boom actually has several sections that telescope (like a motorized car antenna). Each section has a hydraulic piston that pushes the section out of the end of the boom. The cable that hangs off the end is wound onto a large cable reel that is on the rotating section. This cable reel is also gear driven, but is usually just run by two standard spur gears. E-mail me with more details as to how big you want this project and I can help out more from there. Make sure your account is set up to allow e-mails.
Q:I have to do some research on a crane and technology itself (please help me)?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range