Tower Crane VFD PLC Trolleying Mechanism

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 16T Maximum Lifting Height(M): 200M Rated Loading Capacity: 3.5T
Span: 71M Rated Load Moment: 315T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC7021(QTZ250) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

 

Technical Sheet for TC7135

 

Free standing   height (m)

50

Max height   with attachment (m)

200

Working range   can be adjustedm

5055606571

Min working   rangem

2.5

Max lifting   capacityt

16

Tip load @ 71mt

3.5

Hoist   mechanism (VFD+PLC)

Falls

2

4

Lifting   capacityt

04

08

08

016

Speedm/min

080

040

040

020

Motor

YZPBF280-8-55KW

Trolleying   mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YPBE132M-4-7.5KW

Slewing   mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YLEW112M-6-120N.M×2

Climbing speedm/min

0.5

Counterweightt

26

Mast section   sizeL×W×Hm

2×2×3

Working   temperature

-40+60

Total power (KW)

95

Power supply   requirement (KVA)

255KVA for   generator

Cable type (   within 30 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup   voltage & current

380V×95%=361V  260A

Rated working   voltage & current

380V  146A

 

Loading diagram

 

70m jib length

R

3.718.26

20

22

24

26

28

30

32

4 Falls (t)

16

14.48

13.02

11.8

10.77

9.89

9.12

8.45

R

34

36

38

40

42

44

46

48

4 Falls (t)

7.86

7.34

6.87

6.44

6.06

5.71

5.39

5.1

R

50

52

54

56

58

60

62

64

4 Falls (t)

4.84

4.59

4.36

4.15

3.95

3.76

3.59

3.43

R

66

68

70

4 Falls (t)

3.28

3.14

3

           

71m jib length

R

4.735.36

36

38

40

42

44

46

48

2 Falls (t)

8

7.98

7.38

6.96

6.58

6.24

5.93

5.64

R

50

52

54

56

58

60

62

64

2 Falls (t)

5.37

5.13

4.9

4.7

4.5

4.32

4.15

3.99

R

66

68

70

71

2 Falls (t)

3.84

3.7

3.56

3.5

 

65 m jib length

R

3.719.55

21

23

25

27

29

31

33

4   Falls (t)

16

14.79

13.36

12.16

11.15

10.27

9.5

8.83

R

35

37

39

41

43

45

47

49

4   Falls (t)

8.24

7.7

7.23

6.8

6.41

6.05

5.73

5.43

R

51

53

55

57

59

61

63

65

4   Falls (t)

5.15

4.9

4.66

4.44

4.24

4.05

3.96

3.7

 

65m jib length

R

4.738

39

41

43

45

47

49

51

2 Falls (t)

8

7.77

7.35

6.96

6.61

6.29

5.99

5.72

R

53

55

57

59

61

63

65

66

2 Falls (t)

5.47

5.23

5.02

4.81

4.62

4.45

4.28

4.2

 

60m jib length

R

3.721.45

22

24

26

28

30

32

34

4   Falls (t)

16

15.57

14.13

12.93

11.89

10.99

10.2

9.51

R

36

38

40

42

44

46

48

50

4   Falls (t)

8.89

8.34

7.84

7.4

6.99

6.61

6.27

5.96

R

52

54

56

58

60

4   Falls (t)

5.67

5.4

5.15

4.92

4.7

 

60m jib length

R

4.741.9

44

46

48

50

52

54

56

2 Falls (t)

8

7.58

7.21

6.87

6.56

6.27

6

5.75

R

58

60

61

2 Falls (t)

5.52

5.3

5.2

 

55m jib length

R

3.721.54

23

25

27

29

31

33

35

4   Falls (t)

16

14.89

13.57

12.45

11.48

10.63

9.89

9.24

R

37

39

41

43

45

47

49

51

4   Falls (t)

8.65

8.13

7.65

7.22

6.83

6.47

6.14

5.84

R

53

55

4   Falls (t)

5.56

5.3

 

55m jib length

R

4.741.6

43

45

47

49

51

53

55

56

2 Falls (t)

8

7.71

7.33

6.98

6.65

6.35

6.08

5.82

5.7

 

50m jib length

R

3.722.4

24

26

28

30

32

34

36

4 Falls (t)

16

14.85

13.58

12.5

11.56

10.74

10.011

9.37

R

38

40

42

44

46

48

50

4 Falls (t)

8.79

8.27

7.8

7.38

6.99

6.63

6.3

 

50m jib length

R

4.743.6

44

46

48

50

51

2 Falls (t)

8

7.92

7.53

7.18

6.85

6.7

 

 Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Main Section TC5613 in China

Tower Crane Main Section TC5613 in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What measures should be taken to make tower cranes stable?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
Q:Is the tower crane a special type of work?
Certainly, it belongs to the high-altitude workers, not the special workers, what is the tower crane talent network is a platform for the exchange of tower.
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:How to calculate the pouring and maintenance of tower crane concrete in valuation?
Valuation, tower crane concrete foundation pouring and maintenance costs are included in the tower crane rental costs, not separately assessed.
Q:What does tower crane jacking up mean?
First of all, the boom and trim balance arm, unlock the top are connected with a lifting sleeve frame with the standard section, start lifting system, lifting jack will superstructure.Jiangsu Zhendong port machinery manufacturing heavy port machinery is a professional manufacturer of mechanism
Q:What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q:What is the safe distance of a tower crane to the surrounding buildings?
The latest specification is that the tower crane is 4M from the proposed building.According to the safety regulations of tower craneRegulation 10.3: the tower crane tail and the surrounding building and its surrounding construction facilities between not less than 0.6m.Article 10.5 stipulates: between the two tower cranes of minimum distance should be erected to ensure that at least 2m in the distance between the tower crane boom end and another tower crane tower; the most part of the high tower crane (hook up to the highest or lowest part of the balance weight) should not be confused with the vertical distance of tower crane at in between the highest position of the components is less than 2m.The latest specification is that the tower crane is 4M from the proposed building.The distance from the tower to the building shall be considered:1, the slewing radius of the tower itself.2. The distance between the double shelf of building and tower crane.3, double shelf and tower crane safe distance.4, according to the specific type of tower crane to determine the specific.
Q:What are the safety devices in a tower crane?
Moment limiting torqueWeight limit; weight LimitedThe car looks for car restrictions limitFrom the ceiling to prevent hoistingThe slewing limit is limited to Slewing
Q:How many meters does the tower crane installation height require expert proof?
The mounting height of the tower crane is determined by the manufacturer's manual,It has nothing to do with experts,After the tower crane is installed, it needs to go through the provincial construction quality and safety supervision station, and the designated testing institution will meet the technical requirements of the production plant, and the method can be used only after the use of the permit.
Q:What are the safety devices for the horizontal arm self lifting tower cranes?
(1) the lift height limit position limiter must be able to stop lifting motion immediately when the lifting device is raised to the 8OOmm at the lower end of the boom. For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately. (2) lifting moment limiter and maximum weight limiter; when lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped. If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value. When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range