Tower Crane--Topkit TC6016A/QTZ125--CMAX
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 unit
- Supply Capability:
- 200 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
CANMAX Tower Crane
1. main technical parameters for CANMAX TC6010 tower crane:
Certificate | CE,ISO9001,Gost, | ||||
lifting moment | 1250KN.m | ||||
Biggest lifting weight | 10t | ||||
Biggest working range/lifting weight | 60m/1.6t | ||||
Smallest working range | 2.5m | ||||
Hoisting height | Fixed form | 50m | |||
Attached form | 161m | ||||
Hoisting system (planet differential type) | Hoisting speed/
Biggest lifting weight | Two falls | Four falls | ||
m /min | t | m /min | t | ||
3.6 | 5 | 1.85 | 10 | ||
12.5 | 5 | 5.78 | 10 | ||
40.2 | 5 | 20 | 10 | ||
53.6 | 2.5 | 26.3 | 5 | ||
80 | 2.5 | 40 | 5 | ||
slewing system | Slewing speed | 0.6r/min | |||
Trolley system | Trolley speed | 25/51m/min | |||
Jacking system | Rating jacking speed | 0.5m/min | |||
Lifting boom’s length/correspond balanced weight | 60/15.7m/t | ||||
Crane total weight | 53t | ||||
crane total power(not including the hoisting motor) | 60kw | ||||
Mast section’s size (dimension) | 1.8×1.8×3.0m | ||||
Section’s size of the lifting boom | 1.356×1.00m |
- Q:How would the environment, habitat, or ecosystem be affected if whooping cranes were extinct?
- There would be no more whooping cranes for one thing. There would be a gap in the food chain and whet ever feeds off of them could go extinct if they have to have them. What ever the cranes ate might over breed if not held in check and if they are harmful might cause an epidemic that could upset the balance of power in the ecosystem of Florida. All this is speculation but anytime any species disappears it is gone forever and anything can happen.
- Q:Does anyone know of any companies that sell mobile cranes suited for extreme cold? I'm aware of Liebherr and Havator's harbor cranes, but I can't find much else.Thanks
- this is not my area of study but i will give you something to consider. if you are looking for a large capacity crane for use on permafrost, you wont find one. the pressure placed on the permafrost by large weights will cause it to melt. anything that is heavy, like a house, will sink in the tundra just like it will in a swamp. for houses they excavate the foundation a build a giant wooden raft that the hose floats on. in ST Petersburg, Russians preferred a mix of reeds and slave laborers corpses's to build the raft. as long as the ground is not frozen there is somebody how makes what you want. if the ground is frozen, you will only find small machinery. best of luck ps dont look to hard. lots of diesel engines work great at sub-subfreezing temps.
- Q:Tiger=StrengthSnake=FlexibilityCrane=Balance and the last two are?
- The traditional Shaolin animals were Tiger, Crane, Snake, Leopard, and Dragon. There are other animal systems used, including a few different Mantis and Monkey styles, as well as Dog boxing and Eagle Claw. Some systems, like Xing Yi, have sub-sets of other animals; I believe there are twelve in that system. According to Doc Fai Wong's Shaolin Five Animals Form, Crane was used for libido, Snake was used for Chi, Dragon was used for spirit, Leopard was used for tendon strength, and Tiger was used for strengthening the muscles and bones.
- Q:I ve read about crane flies and many experts say they do not bite nor sting. Ifor that is the case, what is the little piece of their abdomen that looks like a stinger?
- ovipositor?
- Q:The story I'm writing that has Frank Crane in it is here. Is there a better name I could be using for the protagonist?
- I agree with the first poster that you are doing something very wrong. Rather than worrying about the name you may want to reconsider the gender.
- Q:The crane will only be needed once. Is it possible to hire them?How much in general would a company charge to bring one in?
- Costs would include the distance the crane travelled and also the size of the crane needed and it could start at $350 per hour up to $1000 although I'm sure those prices would include the drivers costs also.A quick look in your local yellow pages for crane hire firms and a few phone calls would give you a better idea.
- Q:how do construction crews put up a crane?
- They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
- Q:↑ pretty much explains itself. (:~Animal_Lover
- no why not justr learn how to make one its free
- Q:list of people confirmed dead from crane accident nyc?
- i imagine they are injuries. regrettably those who artwork for the city authorities - a minimum of in lengthy island - are extremely incompetent and corrupt. What makes you say that No inspector ought to deliberately ignore a risky contemporary challenge ? That 's precisely what the inspector of the first crane crumple did. Oops, my mistake. He did not verify the cranes in any respect. And all those those who died lately in structure by utilising being blown off by utilising wind from large heights??!! I have in no way heard something like that in the previous. Who supplies those people the needed facilitates?? How educated are those people? the position is their union?
- Q:I am currently in the Air Force reserves as a heavy equipment operator. I really want to learn how to become a tower crane operator. How would I go about doing this? I live in CA.
- Hey Patrick, I was formerly a tower crane erector out of Washington DC. BUt, to yor question, I wold highly recommend you go to your town's Operator engineers Union Hall and inquire as to the qualifications and requirements to enroll in their apprenticeship program. Yes you will have to go thru the apprenticeship program. A tower crane operator is a coveted job among operators... You have to learn to hold your 'P for long periods as well as have great depth perception You coming out of the service, you should be given some preference Good luck
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane--Topkit TC6016A/QTZ125--CMAX
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 2 unit
- Supply Capability:
- 200 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords