Tower Crane The Product model-TC5010(angle bar)

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

TC5010 hydraulic self-lifting tower crane is a new-style hoisting and transporting machine designed to meet the need of assembling high-level construction equipment. The product is an upper rotary self-lifting kind with horizontal jib, trolley amplitude. The length of the jib is 50m, rated maximum lifting capacity is 5t, Tip load at 50 m is 1t and rated maximum lifting moment is 570kN.m. The following is the main characteristics.

1. Wide applicability. The applicability is ranging from civil construction in small and medium cities, to high-rise, multi-layered civil construction in big cities. It can also be used in the construction of multi-layered industrial factories, in the slip-form construction of huge chimneys and silos and in goods loading in port or goods yard.

2. Easy to assemble and disassemble. Hydraulic jacking device is employed to increase or reduce crane standard section to adjust crane height to construction height.

    3. High speed, easy adjustment, stable operation and high efficiency. Low speed with heavy load and high speed with light load can be realized through lifting structure. Two kinds of speed of trolley can meet operational needs. Open stopper is equipped to slewing structure, enabling precise placement and easy assembly of crane.

4. Complete protective and reliable safety devices. The product is equipped with weight limit, moment limit, height limit, trolley limit and slewing limit to ensure normal operation. Besides rest platform, protective railings are also equipped.

5. Driver’s cabin is separately set. It is broad, bright, comfortable, safe and easy to operate.

The product is supplied with the basic height (Free standing) 32.5m.If it is used in high-rise construction, the number of standard sections and attached devices can be increased to meet consumers’ needs. The maximum height of the product is 120m.

Free standing height is 32.5m and  attached height 120m are the maximum lifting height of crane lifting hook.

 

 Parameter listlist 1

List 1     parameter list

      Max.working range

m

50

Rated load moment

kN.m

570

Max.Load

T

5

Min.working range

m

3

KN

T

a=2

a=4

1.045

1.036

        Max.lifting load range

m

a=2

a=4

24.17

12.92

Lifting Height

Free height

m

32.5

Attached height

a=2     120

a=4     60

Size of the whole

Foundation base

M

5×5

Overall height

Free height

42.23

Attached height

128.43

Tip to slewing center

51.13

Balance jib to slewing center

11.18

Whole machine weight

Free height

(without counterweight)

T

20.98

Attached height

(without counterweight

T

43.98

Counterweight

T

10.5

Other

Total power

KW

25.9

Wind speed

m/s

Working         ≤20

Jacking mast section   ≤12

Operating temperature

0C

-20~+40

 Facilities datalist 2

Trolley Mechanism

Motor

Model

YDES112-4/8

Speed

r/min

1380

710

Power

KW

2.4

1.5

Decelerator

Model

BE2450X

Gear ratio

39

Trolley speed

m/min

40/20

Lifting Mechanism

Motor

Model

YZTDE200L3 -4/8/24

Speed

r/min

1440

720

220

Power

KW

18

18

5

Decelerator

Center distance

Mm

460

Gear ratio

I

18.2

Rope capacity

M

280

Brake

Model

YT145Z/5

Brake force

N

450

Lifting speed

m/min

65/32.5

32.5/16

7.3/3.6

         Rated load

T

1.25/2.5

2.5/5

2.5/5

Min.speed of descent

m/min

<7.3

Total weight

T

1.2

Slewing Mechanism

Motor

Model

132M2-4

Speed

r/min

1410

Power

KW

3.7

Decelerator

Model

100Z

Gear ratio

I

150

Output torque

N·m

8300

Pinion gear

Modulo

M

10

Teeth no.

Z

15

Stand-off error

X

+0.5

Hydraulic coupling

Model

YOX280A

Rotary support

Model

011.40.1120

Speed

r/min

0.71

Hydraulic jacking

device

Hydraulic oil station

Working pressure

Mpa

25

power

KW

4

Oil cylinder

Rated pressure

Mpa

20

Bore

Mm

Φ140

Stem diameter

Mm

Φ90

Travel

Mm

1300

Installation distance

mm

1748

Jacking speed

m/min

0.4

KN

t

30

Loading capacity

50M Ratio two

R(m)

3~24.17

25

26

27

28

29

30

31

32

33

34

35

36

Load C (KG)

2500

2406

2302

2205

2115

2031

1953

1879

1811

1746

1686

1629

1575

R(m)

37

38

39

40

41

42

43

44

45

46

47

48

49

Load C(Kg)

1523

1475

1429

1385

1344

1304

1267

1231

1196

1164

1132

1102

1073

R(m)

50

Load C(Kg)

1045

50M Ratio four

R(m)

3~12.92

13

14

15

16

17

18

19

20

21

22

23

24

Load C (Kg)

5000

4968

4589

4260

3972

3718

3493

3291

3109

2944

2795

2658

2533

R(m)

25

26

27

28

29

30

31

32

33

34

35

36

37

Load C (Kg)

2418

2312

2213

2122

2037

1958

1883

1814

1748

1687

1629

1574

1522

R(m)

38

39

40

41

42

43

44

45

46

47

48

49

50

Load C (Kg)

1473

1426

1382

1340

1300

1261

1225

1190

1157

1125

1094

1065

1036

Tower crane mast section

 

Product photo

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:Tower crane (tower crane)
Fixed tower crane, mobile tower crane, flat tower crane, movable arm tower crane
Q:What are the requirements for jack up and plus section of jack up tower crane?
Ask you experts on the construction site of self lifting tower cranes how to install?. Is it like lifting a jack up of a car jack and hanging it in the middle when it's empty?
Q:National standards for tower cranes
GB/T 5031-2008 GB 5144-2006 tower crane safety code for tower crane safety GB mechanical and electrical equipment thirty-second 5226.2-2002 mechanical parts: requirements for hoisting machines GB 5802-1986 lifting short chain hoists and other lifting equipment for the T (8) test specification level calibration chain GB 5905-1986 hoisting machine test code and procedures GB/T 5905-2011 crane and GB/T program 5972-1986 lifting wire rope for examination and discard utility specification GB/T 5972-2006 crane wire rope inspection and scrap utility specification GB/T 5972-2009 crane wire rope maintenance, maintenance, installation, inspection and disposal GB/T 5973-1986 wire rope with wedge joint GB/T 5973-2006 wire rope with wedge joint
Q:Construction tower crane operator certificate expires, how to verify?
Chongqing "construction crane operator qualification certificate", the need for training after the exam this year, Yubei District has organized a meeting, other areas will organize can ask the competent department, the Department in charge of the Certification Committee is.The following is a notice of the Yubei District organizing examination for your reference:Notice of Chongqing Yubei District construction post training center on training courses for construction lifting machinery operatorsAll construction enterprises, mechanized companies, tower crane leasing companies:In order to strengthen our district housing construction sites and municipal engineering site crane operations personnel management, improve personnel quality, prevent and reduce accidents, according to the State Quality Inspection Administration, the Ministry of construction and the Municipal Construction Committee of the spirit of the relevant documents and regulations. After the study, we decided to hold a training course for construction machinery operators, and hereby notify the relevant matters as follows:I. training objects and registration requirementsWhere the construction enterprises in our district and the relevant units engaged in or engaged in the work, at least 18 years of age, women are not more than 55 years of age, male, no more than 60 years of age, junior high school education, good health.
Q:In what circumstances should a tower crane be demonstrated by an expert?
Circular of the Ministry of housing, urban and rural construction on Issuing the measures for the safety administration of sub hazardous and sub divisional projectsBuilding quality [2009]87 number]Annex twoMore than a certain size of the risk of larger sub sub project scopeI. deep foundation pit engineering......
Q:What is the safe distance of a tower crane to the surrounding buildings?
The latest specification is that the tower crane is 4M from the proposed building.According to the safety regulations of tower craneRegulation 10.3: the tower crane tail and the surrounding building and its surrounding construction facilities between not less than 0.6m.Article 10.5 stipulates: between the two tower cranes of minimum distance should be erected to ensure that at least 2m in the distance between the tower crane boom end and another tower crane tower; the most part of the high tower crane (hook up to the highest or lowest part of the balance weight) should not be confused with the vertical distance of tower crane at in between the highest position of the components is less than 2m.The latest specification is that the tower crane is 4M from the proposed building.The distance from the tower to the building shall be considered:1, the slewing radius of the tower itself.2. The distance between the double shelf of building and tower crane.3, double shelf and tower crane safe distance.4, according to the specific type of tower crane to determine the specific.
Q:What does "slewing up" and "under rotating" in the slewing form of a tower crane mean?
In short, when the tower rotates in the form of a tower, the tower is stationary (ie does not follow the rotation), and the form of the lower turn is the tower will rotate.
Q:Tower crane 5610 why is it called QTZ63?
Q is reusable, T is tower, Z is jack up, and combined is jack up tower crane. (this is the earliest known China, now the various manufacturers have their own name, some close to the French take, such as F0/23B, the tower jib 50 meters, a maximum weight of 10 tons, 2.3 tons of weight lifting arm tip)80 is the moment, the unit is t * m, (should say is the force multiplied by distance, 800kn.m) for 5613 cranes, the maximum lifting capacity of 8 tons, the boom length is 56 meters, arm tip lifting weight 1.3 tons, maximum weight in the range of 2.5 meters ---13 meters, calculation of 8 * 13=104, so the name is QTZ104, now the provisions should be a QTZ104, but before, people think is 8 tons of weight, so called QTZ80, is now available.
Q:Tower crane attached concrete pump can be? Are there any state regulations?
Yes, but consider the direction of force. ZOOMLION began production machine.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range