Tower Crane The Product model -TC5008
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
TC5008 tower crane,the max.working range is 50M and the rated loading capacity is 400KN•M.the free standing height is 29m and the max.height with wall tie is 120M(2 ratio) the electric box has waterproof and dustproof function and the main electronic component is Schneider made in China ,the slewing mechanism adopt planetary reducer and the technology of this kind of tower crane is advanced, performance is reliable and structure is simple and practical ,this tower crane has advance safety device and the price-quality ratio is very high
This kind of tower crane is used to build residential building construction. and main part of the mast section is angle steel ,the lifting jib adopt the square steel tube, the lifting mechanism adopt advanced reducer with four shaft to protect the body of the tower crane ,the slewing mechanism adopt wound-rotor motor and this kind of tower crane adopt two slewing mechanisms which make the operation more stationary and smooth.
TC5008 Loading capacity
Jib m | Rate | 14 | 18 | 20 | 22 | 24 | 26 | 30 | 32 | 36 | 38 | 40 | 42 | 46 | 48 | 50 |
2t-21 | 2 | 2 | 2 | 2 | 1.95 | 1.78 | 1.63 | 1.39 | 1.30 | 1.14 | 1.07 | 1.01 | 1.06 | 0.86 | 0.82 | 0.8 |
4t-11 | 4 | 3.15 | 2.41 | 2.16 | 1.95 | 1.78 | 1.63 | 1.40 | 1.30 | 1.41 | 1.07 | 1.01 | 0.95 | 0.86 | 0.82 | 0.8 |
TC5008 Parameter list
TC5008 | Max lifting capacity | 4t | Metric lifting moment | 400KN.m | ||||||||||
Independent | 29m | Attached | 120m | |||||||||||
Material of main tower | ∠160×160×12mm | Section of tower mast | 1.5×1.5×2.2 m2 | |||||||||||
Total power | 25.7KVA | voltage | 380V50Hz | |||||||||||
Hoisting | Type | Fall | Hoisting | Speed(m/min) | Rated power | Rope Length | ||||||||
JZQ460 | 2Fall | 1/2.5/2.5 | 50/33.7/6.5 | 15/15/4 | 280M | |||||||||
4Fall | 2/5/5 | 25.5/16.9/3.3 | ||||||||||||
Slewing | Number Type | Slewing speed | fluid coupling | Torque | ||||||||||
XL100-157 Single | 0.35/0.7( r/min ) | Y0X280A | 13000N.m | |||||||||||
XL83Z-195 Double | 0.38/0.76( r/min ) | Y0X250A | 2×8300N.m | |||||||||||
Trolley | TXB300 | Rated power | Rope Length | hauling load | ||||||||||
2.8/2.2KW | 50m | 2700N |
Factory and Mechanism Photo
- Q:They're so big
- large cranes are build at the factory and torn down and put together the first time, then after that the can be move in larger sections than when it came from the factory.
- Q:quick answer or i'll delete it!
- I think I've seeing Pizza Delivery more times, since it's season 1. It's a classic episode, I mean: The krusty krab pizza, is the pizza, for you and me! who doesn't love that?! I love Skill Crane. And The Splinter wasn't that bad, it would have being better if it weren't for the gross parts, but it haven't air that much since it premiered just a couple weeks ago.
- Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
- Lifting mechanism in tower crane: M5. Luffing mechanism: M4 is the working system
- Q:as the crane cabin temprature is very high which is not good for equipment pls advise which air condition is good for colling
- Ask the Marine Architect that designed the system. A consultation with the electrical engineer and the chief engineer of the vessel and the chief electrician is also necessary.
- Q:Why are there extra placards attached to the tower crane tower?
- 1. additional placards can sometimes damage tower structures and cause damage to the tower during installation. There is a security risk;
- Q:A. to make everyone become a CommunistB. to become rich at the expense of othersC. to kill all the villagersD. nothing in particular
- The main idea of Cranes by Hwang Sun-Won is more of a symbolic thing; he uses different objects such as chestnuts and cigarettes, as well as the cranes in the story to convey his hope and his dream, along with his message. He is expressing the power of war, particularly civil war, which can rip apart families, neighbors and the best of friends. The story, unlike many other tragic civil war tales, is not focused on the idealogical difference btw Tok-Chae and Song-Sam. Rather, it is about the human tragedy of the Korean War. Tok-Chae and Song-Sam were ripped apart by the War. Song-Sam, on his return to his village, he finds Tok-Chae and decides to escort him to a Public Peace Police office a few miles away. On the way, he gets flashbacks and talks with Tok-Chae. These things help to change his mind and he frees Tok-Chae. This is symbolized by the two cranes which soared high into the sky. Hwang-Sun Won conveys his message effectively; unification will be achieved and is needed to repair such ties like Tok-Chae and Song-Sam. He is saying that the two cranes will fly together once more.
- Q:Method for operating tower crane
- In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
- Q:WHAT IS A WADDLE CRANE?
- Well okorder / but I couldn't find any reference to them being called waddle cranes. While the W on a key board is close to the S, you'd have to miss the TR for waddle to be misspelling of straddle, so I have no idea, sorry.
- Q:A crane operator must ensure that the load is within load chart ratings for _________ and the __________ of the crane.A. Boom length; CenterpointB. Boom length; Load RadiusC. Center Point, Load RadiusD. Center of Gravity; Load Radius
- B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
- Q:The question is: A crane has a power of 500watts, and is pulling a 142kg. What is the velocity of the pulling of the crane?Please help and thanks!
- I don't remember ever doing a problem like this, but I will try to solve it. P = W/Δt, P = Fd/Δt P = Fv Force required to lift the 142 kg object; F = 142 * 9.8 F = 1391.6 N Therefore; P = Fv 500 = 1391.6*v v = 0.359 m/s So velocity of the crane is 0.359 m/s. Is that right?
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane The Product model -TC5008
- Loading Port:
- Qingdao
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 5 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords