Tower Crane TCD5032 with Competitive Price

Ref Price:
$40,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Structure of Tower Crane TCD5032 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction           

Tip Load:10T                                         

Span: 50m                                     

Certification: CE,ISO                           

Place of Origin: China(Mainland)          

Model Number: TCD5032         

  

Packaging & Delivery of Tower Crane TCD5032


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Features of Tower Crane TCD5032

 

Tower crane is a kind of vertical conveyor for construction, this series tower crane which with high lifting height, big working radius

mainly used for construction project, power station, port etc . It contain lifting system, luffing system, slewing system and running system. This kind of tower crane use standard section hydraulic lifting and connection, it can increase tower crane height by increase stand sections number, and load capacity will not influenced.

 


Tower Crane TCD5032 Specifiction

 

 

Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the requirements for jack up and plus section of jack up tower crane?
Shall conform to:1, tower crane has not reached the standard free height or attachment, not to the standard suspension height;2. The standard section of tower crane jacking must be the size of the original production;3, tower crane jacking work must be carried out by the professional installation team;4 tower crane jacking up, the wind must be less than four.Answer the 1 floor:The height of the self elevating tower crane is built up by other cranes like building blocks.
Q:How to install the jack up tower crane 30How to install the jack up tower crane?
It is required from the upper plus height, then the crane through the motor (hydraulic is not I don't know if not carefully studied to estimate almost) slowly up, because the installation of crane is a separate Union, only the crane is fixed on the top, and is connected to the lower die width ratio some long, above there are for the installation of people stay small table, but also it can open from the opening above the dead ground fill and then fix it by bolt, and then put the live up to OK
Q:Does tower crane belong to special equipment?
Tower crane is a high-altitude operation, the type of work belongs to special types of work, equipment belongs to special equipment.
Q:Can the tower crane personnel install the construction elevator?
First of all, it is certainly impossible to install the elevator, because the tower and elevator certificate is not the same
Q:What is the scope of the installation and disassembly of self lifting tower cranes and the applicable range of the cost and the off-site transportation cost?
The installation and disassembly of the existing self rated tower crane, the first cost and the off-site transportation cost quota are divided by the lifting moment 1000kNm and 2000kNm of the jack up tower crane.
Q:In the case of tower crane operation, the operation should be stopped
In case of six or more gales, heavy rain, heavy fog, heavy snow or tower crane, you should stop working
Q:Tower crane driver simulation exam which website?
This also needs to imitate exam? When you go to the training, the teacher will read the outline.
Q:What is the safe distance of a tower crane to the surrounding buildings?
The latest specification is that the tower crane is 4M from the proposed building.According to the safety regulations of tower craneRegulation 10.3: the tower crane tail and the surrounding building and its surrounding construction facilities between not less than 0.6m.Article 10.5 stipulates: between the two tower cranes of minimum distance should be erected to ensure that at least 2m in the distance between the tower crane boom end and another tower crane tower; the most part of the high tower crane (hook up to the highest or lowest part of the balance weight) should not be confused with the vertical distance of tower crane at in between the highest position of the components is less than 2m.The latest specification is that the tower crane is 4M from the proposed building.The distance from the tower to the building shall be considered:1, the slewing radius of the tower itself.2. The distance between the double shelf of building and tower crane.3, double shelf and tower crane safe distance.4, according to the specific type of tower crane to determine the specific.
Q:Tower crane four limit, two insurance, two insurance what is that?
Refers to the air switch and the electric leakage protector in the electric tray.
Q:Ask about the lift and transportation of the jack up tower crane
This problem is built in quality [2009]. Clause 87 has provisions.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range