Tower Crane TCD4021 with Excellent Quality

Ref Price:
$40,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Structure of Tower Crane TCD4021 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction           

Tip Load:8T                                           

Span: 40m                                     

Certification: CE,ISO                           

Place of Origin: China(Mainland)          

Model Number: TCD4021         

  

Packaging & Delivery of Tower Crane TCD4021


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Features Tower Crane TCD4021

 

Tower crane is a kind of vertical conveyor for construction, this series tower crane which with high lifting height, big working radius

mainly used for construction project, power station, port etc . It contain lifting system, luffing system, slewing system and running system. This kind of tower crane use standard section hydraulic lifting and connection, it can increase tower crane height by increase stand sections number, and load capacity will not influenced.

 


Tower Crane TCD4021 Specifiction


Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to install the jack up tower crane 30How to install the jack up tower crane?
Since it is self lifting, as the name suggests, it is on its own power that no other crane can rise. It has a special elevated section, a hydraulic device, the upper section rises, the middle empty time section, with his arm to be added to the festival hanging near the artificial it fixed, so that a section of the rising of the. Is to support themselves, and then in the middle plus standard section.
Q:National standards for tower cranes
Tower crane GB/T5031 - 2008 has been implemented since February 1, 2009. In accordance with the new standards promulgated, chief editor -- China Academy of Building Research Institute of building mechanization of Langfang, Beijing and Hebei respectively in Hangzhou, Nanning held the new standards xuanguan. Luo Wenlong, director of the standard editor and vice president of Li Shoulin, explained the new standards comprehensively. The new standards are quite different from the previous standards, adding a lot of security related content, mainly embodied in the following 3 aspects: 1) the principle of different. Previously considered issues mainly consider the domestic tower crane industry technology status, appropriately reflect the advanced nature, and now is the requirements and international benchmarking, consider safety. 2) different forms of organization. The standard used in scientific research institutes, universities, factory assistant; the preparation unit including Research Institute, and the host plant, supporting enterprises, universities, inspection unit, there are relatively large units on behalf of (rental business), etc..
Q:Why are there extra placards attached to the tower crane tower?
Because the span of the base is short, the tower is efficient, and the billboard is easy to cause the tower to overturn or bend.
Q:Four for crane, two for insurance, two for insurance. What does that mean?
Refers to the air switch and the electric leakage protector in the electric tray.
Q:What is the power of a tower crane? Five
TC7525-16D switchboard power 80KWTC5610-4 switchboard power 34KW.TC6015A-10E switchboard power 71.5KWThe other two types have not been touched and will not be answered. I'm sorry
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:Tower crane and tower crane 5
Vertical transportation can be done with elevators, construction lifts, and Longmen racksTower cranes and tower cranes are one thing
Q:What does tower crane jacking up mean?
Jack beam and the lifting sleeve frame is connected with the movable claw beam under the fulcrum can fall in the tower body section on the top step.
Q:Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q:What are the luffing, slewing, and walking points of a tower crane?
The luffing of a tower crane is the forearm of a crane;Slewing means the steering mechanism of a crane;Walking means the walking trolley on the luffing range of a crane

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range