Tower Crane TC7135 Building Wholesaler Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC7135 Description:

1.CMAX Tower Crane TC7135  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7135 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7135 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7135  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7135  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7135 Parameter:

 Max. working range 71m, tip lifting weight 3.5T and Max. lifting weight 16T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 50、55、60、65、71

Min working range (m) 2.5

Max lifting capacity (t) 16

Tip load @ 50m (t) 3.5

Tower Crane TC7135  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7135 Diagram:

Tower Crane TC7135 Building Wholesaler Sales

Tower Crane TC7135 Building Wholesaler Sales

Tower Crane TC7135 Technical Sheet:

Tower Crane TC7135 Building Wholesaler Sales

Tower Crane TC7135 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7135 for example, the first two letters “TC” means Tower Crane, “71”means jib length is 71 meter, and the last two letter “35” means the tip load is :3.5 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can you use a cymbal stand as a camera jib/crane?
The angle of the cymbal on the stand determines the amount of vibration being transferred to the stand. A cymbal on a boom arm verses a straight stand, a heavy tripod verses a lightweight base sounds drastically different. Boom stands can make some cymbals rumble. When boom cymbals stands are somewhat close to staight stands, arm placed close to 180 degree, the cymbal will rumble less.
Q:What does tower crane jacking up mean?
Attached tower crane upper work structure and the lifting sleeve frame connected to the lifting sleeve frame is installed on the lifting jack.
Q:are parts availble for shop crane? Hydraulic ram plunger o rings has split....need part?
What is the crane make and model? If you don't have the model of the crane you can stop by almost any hydraulic/hose shop, they should be able to match up the packings.
Q:What are the colors in the Open Boat by Stephan Crane?
From: The Open Boat By Stephan Crane. These waves were of the hue of slate... ...save for the tops, which were of foaming white... In the wan light, the faces of the men must have been grey. ...the color of the sea changed from slate to emerald-green... ...wild with lights of emerald and white and amber. ...near patches of brown seaweed... ... at the men with black bead-like eyes. ... marked by dingy clouds, and clouds brick-red, ... Ain't they peaches? A faint yellow tone came into the sky over the low land. ... a small bluish gleam on the edge of the waters. ... with a sky of pure blue...
Q:method how to assemble tower crane?
Generally tower cranes are self erecting. The first mast and jib sections are assembled at ground level. The mast and jib are then jacked up and another mast section inserted. If the tower crane is not self erecting then mobile cranes have to be used to assemble the crane.
Q:Tower crane and construction hoist service life? What are the norms and standards? How to detect?
According to Hangzhou quality safety supervision station (2011) No. 56 document:Six, strengthen the use of longer construction crane management1, more than the required number of tower cranes and construction hoist should be qualified units for security assessment, the specific years with reference to the following requirements.Tower crane: 630KN.m (excluding 630KN.m), factory more than 10 years of age (including 10 years); 630KN.m1250KN.m (excluding 1250KN.m), factory more than 15 years of age (including 15 years);
Q:How long does it take to fold 1,000 origami paper cranes?
I think it will be hard to tell, the easiest form to calculate is the time to make one crane times 1000. However, as long you fold you will get a little bit exhausted therefore you should add 1/5 of the total times to make of the 1000 cranes, good luck!
Q:lifting a machine with two crane and a beam?
You left out crucial information and working it out with risky assumptions takes too much work. Whatever this was supposed to mean Machin connect to beam in 3 point What is missing is whether the cranes connect to the end and the entire weight of the machine is in the middle - or is the machine attached at 3 distributed points. In addition, there has to be some condition - looking at the ASTM spec will give strength, but you have specified whether the beam is to be just at failure or 50% safety factor, etc.
Q:Equipment safety of tower crane
Some use units over profit, not pay attention to safety, small horse cart, overloading seriously, tower crane accident is one of the main source of high incidence. Some manufacturers in order to meet the construction requirements of the enterprise, expand sales, to occupy the market, will be independent of height increase, the boom will be lengthened to increase the tower coverage, this is bound to reduce the stability of tower crane, reduce the rated lifting weight, increased insecurity. There are some private and unauthorized modification of the tower crane tower crane in the assembly, this part of the tower crane for a long time in the second-hand purchase price is cheap, not willing to invest in maintenance, and frequent failure, which should arouse our attention, we should seek truth from facts, according to local conditions, to solicit the views of all parties on the basis of the introduction of relevant the supporting policies to solve this problem. By strengthening the safety management of several aspects of tower crane, it can effectively prevent all kinds of accidents in the process of tower crane use, and play a preventive role. Practice shows that as long as the construction enterprises, factories, construction administrative departments, in accordance with the tower crane detection institutions can each link to do, to strengthen the safety management of the tower crane, can effectively control the incidence of major accident of crane.
Q:How crane can hold huge counter weights? Why CG is not changing while adding counter weight on cranes?
Usually the counterweights can move back and forth on an arm. They are moved toward the crane when there is no load and away from the crane when there is a load. If the counterweights can't move, then the crane must be designed to hold (at least) the minimum counterweights in their fixed location. As the crane gets loaded, the net moment decreases, and then increases in the other direction as more and more load gets added. It is still likely that the maximum design moment when loaded far exceeds the moment due to the counterweights on an unloaded crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range