Product Description:

Tower Crane TC7021 Description:

1.CMAX Tower Crane TC7021  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC7021 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC7021 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC7021  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC7021  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC7021  Parameter:

 Max. working range 70m, tip lifting weight 2.1T and Max. lifting weight 12T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 40、45、50、55、60、65、70

Min working range (m) 2.5

Max lifting capacity (t) 12

Tip load @ 50m (t) 2.1


Tower Crane TC7021   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC7021Diagram:

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 Technical Sheet:

Tower Crane TC7021 Construction Equipment Building Machinery Distributor Sales

Tower Crane TC7021 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC7021 for example, the first two letters “TC” means Tower Crane, “70”means jib length is 70 meter, and the last two letter “21” means the tip load is :2.1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How are skyscrapers been build ?no cranes can be that high?
That is a good answer. Ordinary cranes build the steel frame to a height of perhaps 60 feet. The frame is designed so a specially designed crane can climb up the side (like climbing a ladder) to about 50 feet where the climbing crane can complete the frame to about 100 feet, then the crane can climb to the 90 foot level and build the frame to about 150 feet etc. Another method is the floor at about the 60 foot level is completed and extra strong. A crane is assembled on that floor and can complete the steel frame to about 100 feet where another extra strong floor is built. The crane at 60 feet is then dismantled and moved to the floor at the 100 foot level, or perhaps this is a second crane. Repeat until the full height of the building is frame work. As cranes are removed at the lower levels, more floors can be installed and some of the finishing work done. Either way, you can see why very tall buildings are very expensive. Likely both methods are used for some very large and very tall buildings. Neil
Q:What association does Wing Chun have with Fujian White Crane (Tiger-crane) kung fu?
Wing Chun Fist is derived from White Crane Fist and Snake Fist. The original name of the White Crane Fist is Eng Chun Bai He Quan. The Eng Chun part is the Fukienese dialect for Wing Chun, which is the name of the Village it derived in. It is also pronounced Yong Chun White Crane Fist and from it is where Wing Chun derives its Fajing technique known as 1 inch punch. The 5 Ancestor style is Ngo Cho Kuen or Wu Zu Quan, again - dialectal differences. It is also a Fukienese Art. Wing Chun, a Southern Shaolin Style is NOT related in ANY way to Hsing I Chuan, which is of Wu Tang/Taoist origin. Goju Ryu has some White Crane Influence but is derived from the Hakka Arts like Southern Mantis, Bak Mei and the like. Tiger Crane and White Crane are not related. The crane in the Hung Family Boxing is more the Tibetan White Crane and not the Fujian Crane. There is a mix up in the history which makes it a bit complicated. Gee Sim was from the Northern Shaolin School and went south to the Fukien temple to escape the Ching. He taught there, met Hung Hei Koon and taught him Tiger Fist. Gee Sim and Hung also left Fukien because of the Ching and went to Guandong and there is where Hung Fist developed into what it is today. The White Crane Fist of Fujian/Fukien came from the 18 Lohan Style Fang Chi Niang learned from her Father, who was a student at the Fukien temple, and mimicry of Crane movements. These styles, Crane and Hung were being developed around the same time but hundreds of miles apart. It is known that Wong Fei Hung trained in Lama Pai aka Tibetan Crane and also he is credited with creating the Tiger Crane Form aka Fu Hok. I hope this helps.
Q:Why didn't Machida use the crane kick on Jones?
On the whole fight, Machida try to use the front kick (not crane kick) to the head against Jon Jones during first round, but due to reach differences, he is not able to hit him, and Jon Jones are keeping distance against Machida, because when Lyoto try to hit him, Jones simply slide back to avoid the strike. But, on all the bouts of Jon Jones, the only time I have seen him struggling against his opponent, is during the first round that he feel nervous, especially when Machida counter him by left punch while pushing him or kicking in the leg. Jones is lucky enough to hit Lyoto unexpectedly and choke him via technical guillotine, because if not, then I am expecting that Lyoto will win via decision. I am expecting that Lyoto Machida will go back in the octagon to fight somebody before arranging the rematch against Jon Jones. ......................................
Q:How many stops are there in a tower crane? Where are they located in the tower cranes?
The hook has an upper limit on the windlassThe car has front and rear spacing on the trolley hoistSlewing is limited to the slewing gearAnd the torque limit is on the spireWeight limit
Q:Cranes can be overturned as a result of unknown load weights.?
B. The load radius is the horizontal distance from the center of rotation of the crane to the center of gravity of the load being lifted. The load radius is a critical consideration when determining what size crane is required for most lifts. There is generally a chart that tells what that machine will lift at any boom length,
Q:Who is Seneca Crane in the series of Hunger Games?
Oh, yeah! Ha ha, I got lost on that part too. It's hard to catch. Seneca Crane was actually the old producer so to say of the games. Katniss is calling them out, because she knows Seneca was punished due to the fact he came up with the fact to pretend two tributes could get out alive. The capitol blamed him for their failure to contain Katniss and Peeta.
Q:What do lattice boom and hydraulic boom in cranes mean?
LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.
Q:How to build a electromagnetic crane?
The bible does mention the pyramids. It is in Exodus when the Jews have been in captivity in Egypt and developed them. What? You suggestion the Egyptians had the skill or science to do it? The secret is that they were built from the highest down as a substitute than the bottom up.
Q:Paper Crane tattoo design issues?
Hey okorder.com/ I reckon the Japanese tradition would really suit this style because of the crane is a Japanese form of art. I do give you permission to print out this piece and work with it as this is only a basic sketch and ive stuffed up a lot of the detail as I forgot it would be easier for you with just an outline also the top flower may need re-doing. I hoped I helped.
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range