Tower Crane TC6520 VFD+PLC Technical Control

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 10T Maximum Lifting Height(M): 200M Rated Loading Capacity: 2.0M
Span: 65M Rated Load Moment: 160T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6520(QTZ160) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

Specification of Tower Crane

 

Technical Sheet for TC6520

 

Free standing   height (m)

50

Max height   with attachment (m)

200

Working range   can be adjustedm

556065

Min working   rangem

2.5

Max lifting   capacityt

10

Tip load @ 65mt

2

Hoist   mechanism (VFD+PLC)

Falls

2

4

Lifting   capacityt

02.5

05

05

010

Speedm/min

080

040

040

020

Motor

YZPBF250M1-6-45KW

Trolleying   mechanism (VFD+PLC)

Speedm/min

0-56

Motor

YZPBE132S-4-5.5KW

Slewing   mechanism (VFD+PLC)

Speedr/min

0-0.6

Motor

YTW112M-4-5.5KW×2

Climbing speedm/min

0.5

Counterweightt

21.3

Mast section   sizeL×W×Hm

2×2×3

Working   temperature

-40+60

Total power (KW)

63

Power supply   requirement (KVA)

230KVA for   generator

Cable type (   within 35 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup   voltage & current

380V×95%=361V      219A

Rated working   voltage & current

380V                 121A


Loading diagram

 

65m jib length

R


20

25

30

35

40

46

48

a=2 (t)

5t---29.1m

4.84

4.1

3.53

3.02

2.87

a=4 (t)

10t---14.73m

7.33

5.8

4.77

4.03

3.46

2.95

2.8

R

50

52

54

56

58

60

62

64

65

a=2 (t)

2.74

2.62

2.5

2.4

2.3

2.21

2.12

2.04

2.00

a=4 (t)

2.67

2.55

2.43

2.33

2.23

2.14

2.05

1.97

1.93

 

60m jib length

R


20

25

30

36

38

40

42

a=2 (t)

5t---35.67m

4.95

4.67

4.42

4.19

a=4 (t)

10t---18.15m

9.06

7.2

5.94

4.88

4.6

4.35

4.12

R

44

46

48

50

52

54

56

58

60

a=2 (t)

3.98

3.79

3.61

3.45

3.3

3.16

3.03

2.91

2.8

a=4 (t)

3.91

3.72

3.54

3.38

3.23

3.09

2.96

2.84

2.73


55m jib length

R


20

25

30

32

34

36

38

a=2 (t)

5t---37.75m

4.97

a=4 (t)

10t---19.23m

9.61

7.64

6.31

5.89

5.52

5.19

4.90

R

40

42

44

46

48

50

52

54

55

a=2 (t)

4.70

4.45

4.23

4.03

3.85

3.67

3.52

3.47

3.3

a=4 (t)

4.63

4.38

4.16

3.96

3.78

3.6

3.45

3.3

3.23

  

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane 8T Max Capacity TC6014 Factory

Tower Crane 8T Max Capacity TC6014 Factory

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Can you use a cymbal stand as a camera jib/crane?
Try okorder.com/
Q:Deeper meaning of this Stephen Crane poem?
A Wayfarer is an aimless wanderer. It's often more comfortable and flattering to the ego to think about a goal rather than to have the conviction to actually go through with achieving it. It's painfully difficult and takes a lot of strength to create your own path in life. People like to talk about how great they are, but ultimately, when faced with the truth they will opt to go along with the crowd.
Q:What is the purpose of the stinger on Crane Flies?
Stinger Crane
Q:What is a better name than Frank Crane for a story hero?
I agree with the first poster that you are doing something very wrong. Rather than worrying about the name you may want to reconsider the gender.
Q:Summary on The Open Boat by Stephen Crane?
amazed that I found this topic already answered! It is like you read my thoughts!
Q:How do i make an origami flapping crane?
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q:How to choose tower crane in engineering, such as arm length and lifting weight?
First of all, your engineering structure is reinforced concrete Or steel? What's the weight of the lift? The lifting capacity of tower cranes should meet the needs. Generally speaking, steel structure hoisting, tower crane of the largest lifting weight and gravity moment should be large; hanging steel reinforcement of a smaller can.Secondly, the boom length should be covering the scope of construction (can also be arranged to meet several sets of crane lifting coverage). But in the 360 level luffing jib range, can not have obstacles (other cranes and buildings), and the boom and the distance between them (below) should be not less than 2m.Third, in the construction project is relatively high, the site is relatively small, you can mount the internal climbing tower crane. Building covers a large area, sometimes one can solve the problem. Of course, it is more troublesome to disassemble and lift inside, but the standard section used is less and the cost can be lower.
Q:Under what circumstances does a tower crane require third party testing?
New clothes, relocation or transformation should be examined by the quality and Technical Supervision Bureau
Q:IF YOU HAVE'T READ THIS BOOK, DON'T ANSWER! In Suzanne Collins novel, Catching Fire, who is Seneca Crane?
Seneca Crane is the previous Gamemaker who decided to allow Peeta and Katniss to live after the berry incident. The Capitol killed her and replaced her for that act of mercy. That's why Katniss hung her; she was rebelling against the Capitol and implying that they murdered Seneca Crane.
Q:What are the basic parameters of a tower crane?
The basic parameters of a tower crane include the length of the crane itself, the weight of the crane as well as the weight of the counterweight! Tower crane lifting mechanism; slewing mechanism; luffing mechanism; motor power;...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range