Tower Crane TC6520 VFD PLC Control Mechanism

Ref Price:
$30,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 10T Maximum Lifting Height(M): 200M Rated Loading Capacity: 2.0T
Span: 65M Rated Load Moment: 160T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC6520(QTZ160) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This series of tower cranes, ranging from QTZ40 to QTZ400 has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism. It is original in design, reliable in operation and satisfactory in shape. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency. They can be widely used for the construction of high-rise hotels, residential buildings, high-rise industrial buildings, large-span factory buildings and tower-like buildings like tall chimneys.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane 

 

Tower Crane TC6520 VFD PLC Control Mechanism

Tower Crane TC6520 VFD PLC Control Mechanism

Tower Crane TC6520 VFD PLC Control Mechanism

 

 Images of Tower Crane

Tower Crane 4808 40T.M New Mini Crane in China 

Tower Crane Main Section TC5613 in China

Tower Crane 4808 40T.M New Mini Crane in China

Tower Crane Max. lifting Weight 10T  in China

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


(0)

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the insulation resistance of tower crane?
Three. Technical specification for temporary power safety on construction site JGJ 46-20055.4.2 within the construction site crane, derrick and Longmen machinery equipment, metal structure and steel scaffolding and under construction in construction projects, when lightning protection devices in adjacent buildings, structures and other facilities outside the protect zone of lightning arrester, lightning protection device should be installed in accordance with the provisions of.5.4.7 lightning protection electrical equipment machinery, connected to the PE line must repeat grounding at the same time, with a repeat of the mechanical and electrical equipment grounding and lightning protection grounding machines can share the same grounding body, but should be consistent with the repeated grounding resistance of grounding resistance requirements.The electrical equipment of 9.2.1 tower crane shall comply with the requirements of the current national standard "safety regulations for tower cranes" GB5144.9.2.2 tower cranes shall be subjected to repeated earthing and lightning protection grounding as specified in Clause 5.4.7 of this code. The earthing device of the track type tower crane shall comply with the following requirements:L the two ends of the rail are respectively provided with a grounding device;The joint of the 2 track is electrically connected, and the ends of the two tracks are electrically connected in the loop;3 long track every is not more than 30m and a grounding device.
Q:how do cranes get assembled ? on building sites?
They use hydraulic mobile cranes, (they're telescopic). I watched a crane being disassembled on a building site near my home. How did they do it before they had these mobile cranes? In Switzerland, in places where there are no roads they use helicopters.
Q:What other animals are there in an Eurasian Cranes habitat?
For example the Spreewald is representative of an ecosystem, the Eurasian Cranes live in. You find there also: Eurasian river otter (Lutra lutra), black stork (Ciconia nigra), white-tailed eagle (Haliaeetus albicilla), osprey (Pandion haliaetus), European fire-bellied toad (Bombina bombina) and several dragonfly species such as the beautiful demoiselle (Calopteryx virgo), banded demoiselle (Calopteryx splendens), several club-tailed dragonflies (Gomphus vulgatissimus, G. flavipes, Ophiogomphus cecilia) and a range of other invertebrates. www.bfn.de/0203_spreewald+M520875...
Q:Does anyone know how to send a letter to Kara Crane?
Try: Kara Crane c/o Orange County High School of the Arts 1010 North Main Street Santa Ana, CA 92701
Q:Did Noah build the Ark with no power tools, nails, or crane?
What do you mean, he didn't have any cranes? Back in those days, before dinosaurs were wiped out in the flood, Brontosauruses were used as cranes. Haven't you ever watched the Flintstones?
Q:What are Cranes and Derricks used for?
Cranes are used for lifting heavy equipment. Derricks are used to drill for oil. They are two different things.
Q:How does a person go about becoming a Gantry Crane Operator? And what is it like?
First you need an opportunity to operate a Gantry Crane, then you will to to get a crane operator license. Finally, you need to find a company who needs a Gantry Crane operator, but if you have located the first step, then you have found someone.
Q:are parts availble for shop crane? Hydraulic ram plunger o rings has split....need part?
may have one, or try a tractor supply shop in your area. You can try matching the ring at an auto parts store that has balk parts behind the counter.
Q:How does a crane get on top of a building and how does it go back down?
Depends on the building of course. Either a taller crane is brought in to lift them, or they're lifted by helicopter. And sometimes a building effectively builds itself, and the crane moves up with the construction platform after being constructed at ground level. Will still need a helicopter to remove it of course.
Q:Tips for the crane machine... D:?
make sure you find something that isn't trapped by anything else in the pit.. line up the crane one the front, then move over to the side and line it up... these machines used to be a lot easier 20 years ago, but now the arm doesn't apply much pressure.. it has to be lined up just right or you will never get anything...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range