• Tower Crane TC6520 Construction Equipment Building Machinery Sales System 1
  • Tower Crane TC6520 Construction Equipment Building Machinery Sales System 2
  • Tower Crane TC6520 Construction Equipment Building Machinery Sales System 3
  • Tower Crane TC6520 Construction Equipment Building Machinery Sales System 4
Tower Crane TC6520 Construction Equipment Building Machinery Sales

Tower Crane TC6520 Construction Equipment Building Machinery Sales

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC6520 Details:

Minimum Order Quantity:     1unit                                            Unit:     unit                            Loading Port:     China main Port

Supply  Capability:         5unit/month                                                                Payment    Terms:      T/T   or  L/C


Tower Crane TC6520 Description:

1.CMAX Tower Crane TC6520  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6520  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6520 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6520  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6520  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6520  Parameter:

 Max. working range 65m, tip lifting weight 2T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50

Max height with attachment (m) 200

Working range can be adjusted (m) 55、60、65

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2


Tower Crane TC6520  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC6520 Diagram:

Tower Crane TC6520 Construction Equipment Building Machinery Sales

Tower Crane TC6520 Construction Equipment Building Machinery Sales

Tower Crane TC6520 Technical Sheet:

Tower Crane TC6520 Construction Equipment Building Machinery Sales

Tower Crane TC6520 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6520 for example, the first two letters “TC” means Tower Crane, “65”means jib length is 65meter, and the last two letter “20” means the tip load is :2 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:What do lattice boom and hydraulic boom in cranes mean?
LATTICE BOOM: See first link. This is where the boom (the portion used to support the load) is made like a lattice ... i.e. interconnected trusses and girders. The cables for lifting the load are run from the base of the boom to the load over pulleys/gears located at the boom's tip. The boom itself is NOT adjustable in length or in angle. HYDRAULIC BOOM: See second link. This crane uses hydraulics to adjust either the length of the boom, or the angle at which the boom joints intersect. It looks more like a single beam construction, although its probably closer to a tube type design (hydraulics may be inside or outside the arm). The load is raised/lowered by cables operating at the end of the boom ... not necessarily tied back to the bottom of the boom.
Q:My understanding is that under Crane doctrine the tax basis of the property to begin with is Equity Invested + Financing (recourse or nonrecourse doesn't matter). i.e. 20K down + 80K purchase money mortgage = 100K. What if the property is appraised for only 80K right before purchase but purchaser paid 100K? Is the tax basis 80K or 100K.In other words, is the tax basis the actual assessed value of the property or is the tax basis the total investment?Thanks,Ben
Your understanding of Crane is correct. For purposes of calculating the gain on sale, the basis would be $100k. What Crane really said was that the net proceeds would have to include any assumed debt, in addition to any cash received -- basically that you had to include the debt on both ends of the transaction if my reading is correct. (That jives with the example in Commissioner v Tufts et al, 81-1356 so I think we're correct on that.) Where basis gets interesting is when you are calculating depreciation. At least when you convert a residential property to business use -- i.e. a rental -- you use the LESSER of the cost basis (Crane) or the FMV on the date that the property is placed in business(rental) service. In your example, the depreciable basis would be $80k since that was the lower. For calculating the gain on sale, the cost basis would still be $100k (adjusted down for any depreciation allowed or allowable while in business use of course).
Q:But theres always someone who gets a prize everytime. Its so unfair!lol
I suck at them lol. I actually like Spongebob (yea thats right), and im not afraid to admit it. Down here in the deep blue sea! It aint 80s I know but its pretty good nonetheless... and no im horrible at those skill cranes so I feel for Squidward in the episode...
Q:Does anyone know of any companies that sell mobile cranes suited for extreme cold? I'm aware of Liebherr and Havator's harbor cranes, but I can't find much else.Thanks
this is not my area of study but i will give you something to consider. if you are looking for a large capacity crane for use on permafrost, you wont find one. the pressure placed on the permafrost by large weights will cause it to melt. anything that is heavy, like a house, will sink in the tundra just like it will in a swamp. for houses they excavate the foundation a build a giant wooden raft that the hose floats on. in ST Petersburg, Russians preferred a mix of reeds and slave laborers corpses's to build the raft. as long as the ground is not frozen there is somebody how makes what you want. if the ground is frozen, you will only find small machinery. best of luck ps dont look to hard. lots of diesel engines work great at sub-subfreezing temps.
Q:Jon and Paul are folding origami cranes. If Paul works alone he can fold 100 cranes in 5hours. together they can do the same job in 3 hours. how much time would it take for Jon to fold 100 cranes alone? Please show your work. :)
1/5 + 1/x = 1/3 == x = 15/2 = 7.5 h answer : 7.5 hours ++++++++++++++++++++
Q:job description of crane operator and truck driver?
heavy equipment operator
Q:So Pretty much, there is a crane, and there are four blue minions on top. I can pick them up, and carry them back and forth, but I can't get them down. If I drop them in the middle they always die. Can somebody give me a way to beat this?
Found the answer!:) By that point, if you did everything right you should have 8 blue minions. Put 6 of them on the crane and 2 of them(with a guard marker) in the middle where you ar gonna drop the ones from above. Then when you drop them, the ones guarding will pick them up and heal them.:) P.S.A tip, if you want the crane to come back slower don't remove all the minions from it, just remove 2 and the rest will slow it down. Hope this helped, have fun.:)
Q:WHAT IS A WADDLE CRANE?
A Bird
Q:this wind speed refers to that height of wind speed?
This is not on the project department climbed to tower crane to measure wind speed, regardless of height, is listening to the local meteorological station forecast, more than five winds, should stop working.
Q:A Korean kid at my school made me one in a new kid meeting. Sadly, he made it with my hall pass that needs to be signed with the teacher that organized it. But when she had to sign it she ripped it up and he won't make me another one! How can i make one myself?
It's called oragami. See what you can find on the web, or go to the Koran kid and ask if he could make one just for you and do something for him in exchange.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords