Tower Crane TC6024 Sales Construction Equipment Building Machinery Distributor

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.

Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4

Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit

Tower Crane TC024 Diagram:

Tower Crane TC6024 Sales Construction Equipment Building Machinery Distributor

\Tower Crane TC6024 Sales Construction Equipment Building Machinery Distributor\

Tower Crane TC6024 Technical Sheet:

Tower Crane TC6024 Sales Construction Equipment Building Machinery Distributor

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the Tower crane Roadb track laying criteria ?      ?
The track in the vertical and horizontal direction is not more than 1 / 1000. (we Should use the standard instrument, two tracks, and keep in10m range ,Measuring not less than 3 periods, respectively,taking the average).
Q:dynamic force on crane when a load of 37k falls 1',2' 3'or 4'?
Need more information. In general, the answer is that the dynamic load depends on how quickly the payload decelerates. The dynamic load will be the mass of the payload times the peak deceleration rate. In a strength calculation, do not forget to include the static weight component of the load. The deceleration depends on the elasticity of the cables supporting the load. If the crane has a flexible supporting structure, then that could also affect the result. (You didn't say whether the crane is the traveling overhead hoist type usually seen in a factory - which typically has a stiff support - or the cantilevered truss type seen on construction sites - where the support might have a little flexibility.)
Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:how long do i have to work as a yardhand in oilfeild to become a crane operator?
You need to get licensed or certified to operate the crane. make sure you are qualified before you start complaining about not getting more challenging work. The world needs ditch diggers to so get back to work.
Q:method how to assemble tower crane?
Generally tower cranes are self erecting. The first mast and jib sections are assembled at ground level. The mast and jib are then jacked up and another mast section inserted. If the tower crane is not self erecting then mobile cranes have to be used to assemble the crane.
Q:How do they erect HUGE cranes without a crane?
They use Hydraulics. I don't know if you have any understanding of Fluid power but a hydraulics system can lift up to 400% of its weight multiplyed by its density. There are other factors to consider such as cylinder size, flow, and pressure but these are usualy constants. For example: If the hydraulic fluid used weighs 5 lbs. per gallon and its density is .9 gram per cubic centimeter then 1 gallon of this fluid could lift 53.1441 lbs. A jack system is hydraulic
Q:Really not sure about white crane kung fu?
There are two types of White Crane one is Tibetan which is called HOP GAR or Bak hok it has both high and low kicks with long arm movements Fujian white crane has lower kicks and shorter arm/hand movements...At your age both will be fine
Q:How does a crane operator's knowledge of where the centroid is generally located for most uniform objects?
If an object is uniform, it's a fair bet the centre of mass will be at the centre of the shape. If lifting with slings, he will have them placed equidistant from centre, at an angle to each other not exceeding 60 degrees. He will then lift a little, and can tell by the angles from vertical of each sling whether or not the CM is under the centre of the crane cable. If not, he will lower the load, and have someone adjust the sling positions. Having slings equally loaded ensures a level load when lifting, and when a load is level it is a much safer lift than when it tilts one way or the other. A tilt would mean greater force in the sling on the low end. The load could slip out, or the excess force could break the sling.
Q:Does anyone know how cranes are put in place?
There broken up into pieces and then assembled on site. Your right they are to big.
Q:Common themes in Stephen Crane's works?
Stephen Crane Works

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range