Tower Crane TC6024 Construction Machiney

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
15 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Introduction:
Tower crane is used to lift, lower and horizontally move materials in construction and other industry. It has large lifting capacity and lifting height, wide moving range, and can rotate. It basically consists of base foundation, mast, slewing unit, working jib, counter jib, counterweight, hook, and operating cabin.


Features:

1. High working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
2. The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
3. The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.
4. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

5. LVF: Frequency control, variable speed, smoothness and high stability, non-striking.
6. Moment motor, high stability, long working life.
7. SM: Three-speed change pole motor, simple in structure, economical ,fitting.


Specifications:

Tower Crane TC6024 Construction Machiney

Tower Crane TC6024 Construction Machiney


Tower Crane TC6024 Construction Machiney

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How are skyscrapers been build ?no cranes can be that high?
That is a good answer. Ordinary cranes build the steel frame to a height of perhaps 60 feet. The frame is designed so a specially designed crane can climb up the side (like climbing a ladder) to about 50 feet where the climbing crane can complete the frame to about 100 feet, then the crane can climb to the 90 foot level and build the frame to about 150 feet etc. Another method is the floor at about the 60 foot level is completed and extra strong. A crane is assembled on that floor and can complete the steel frame to about 100 feet where another extra strong floor is built. The crane at 60 feet is then dismantled and moved to the floor at the 100 foot level, or perhaps this is a second crane. Repeat until the full height of the building is frame work. As cranes are removed at the lower levels, more floors can be installed and some of the finishing work done. Either way, you can see why very tall buildings are very expensive. Likely both methods are used for some very large and very tall buildings. Neil
Q:What Japanese counter word is used for multiple origami objects...such as 1000 cranes?
1,000 cranes is counted using the bird counter (there's one specifically for birds or rabbits) so it's sen-ba-tsuru. It would depend on what you've made in origami. The most general counter would probably be -ko. one origami work ikko two niko three sanko four yonko five goko six rokko seven nanako eight hakko nine kyuuko ten jikko I think you could use it for almost anything that you could make in origami, though, (like senbatsuru) there could be a more specific counter to use depending on what you made, but there are so many counter words. If it's something flat, or you wanted to count origami paper, then it's -mai If it's a long slender work of origami -hon
Q:Who invented the tower crane, please?
In 1923, a prototype of modern tower crane was built. The first relatively complete modern tower crane appeared in the same year. Our tower crane started from Shanghai in 1950.
Q:where can i buy a cheap plush crane machine?
Supplier of plush animals for skill crane and claw machines everywhere
Q:how do you make an electromagnet crane?
For okorder.com/
Q:Overhead Crane supporting Columns.?
See okorder.com/
Q:What is your favorite poem by Hart Crane?
How about my favorite poem about Hart Crane? AT HART CRANE’S TOMB by Glenn Robert Swetman In his mind’s dark, he spoke a frivolous age where marriage of the like was spring, where vitelline worlds of virgin instinct were crushed in the obscene cleanliness of a raccoon’s paw. Did he imagine that his great sun could come trailing yellow handkerchiefs of light, like a queer comet? No, there is something out there that commands, and not worlds of perfect clipping will turn these rotund hedges into maypoles—and live. That’s why the green expands as it reaches. He must have seen this finally. His leap Into the green sea was, aesthetically, clean.
Q:I need Help now : Crane Fly?
Crane flies are harmless. They don't bite or sting. You could just get a T-shirt and swing at it if it dares cross your path.
Q:Safety rules for tower cranes
Three. Check after shutdown3.1 after the tower crane has stopped operation, it is necessary to select the suitable position of the barrier and the middle of the track when the turret is turned and the arm to stop along the wind, and then lock all the rail clamps.All 3.2 tower crane rotary mechanism with a normally closed or braking device, in the stop after the operation, the driver must remove the handle, release the brake for crane in the wind blowing in under the direction of rotation.3.3, the hook should be lifted to the minimum distance from the lifting wall, not more than 5m position, hanging on the hook is strictly prohibited. Not to take reliable measures, not by any means, limiting the boom rotate with the wind.
Q:Asian crane picture and symbols- can anyone tell me anything?
The kanji / symbol (character of Chinese origin, also used in Japan) is the kanji for 'crane' (the bird, not the construction site vehicle!!)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range