Tower Crane TC6024 Construction Equipment Wholesaler Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Tower Crane TC6024 Construction Equipment Wholesaler Sales


\Tower Crane TC6024 Construction Equipment Wholesaler Sales\

Tower Crane TC6024 Technical Sheet:

Tower Crane TC6024 Construction Equipment Wholesaler Sales

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:it says theres cranes bill in my primer???!!!?
It probably is cranes bill unfortunately. You could always contact the manufacturer be sure. They should have a number somewhere on the packaging. Lots of animals are used in cosmetic products. Sharks, whales and other fish are commonly used in lipstick ground beetle shell is used in most kinds of makeup. All you can do is use it up, because if you waste it then that animal died for nothing. If it really creeps you out, give it to someone who would use it. If I were you, I wouldn't buy this primer again... :S Hope this helps xx
Q:How did they get that crane on the top of the Deutsche Bank bldg here by the WTC in NY?
They do it a few diferent ways: (1) They use another crane to put it up there (2) They fly it in - either whole or in pieces - usually with a set of helicopters (3) The pieces are lugged up in an elevator and assembled up on top Seriously, most cranes are bought to the site in pieces and assembled on the fly. They can usually put them up in a span of a few hours. They have the erection of the cranes down to a simple science nowadays. They can also build the crane by using a small crane at the start and building on that until they expand it out to a large one.
Q:How does the torque of a construction crane relate to the torque of a car?
Torque is force x distance. In a car, the torque is the force twisting the drive axles, and the distance is the radius of the driving wheels. It controls the rate of acceleration of the car. In a crane, the force is that provided by the winch cable, and the distance is the length of the jib. It controls the weight the crane can lift.
Q:What does "automatic tower crane" mean less than 100 tons per metre?
The crane must not exceed the maximum lifting capacity when working! Otherwise, there will be danger.
Q:does it really take a crane to build a crane?
No. They are lifted into place in sections by one or more other cranes, the telescopic arm kind, which are either in a nearby street or on the building site. I watched several being built and then dismantled over a period of three years at a large development across the street from my house. However, I saw a TV programme about how they built one on top of a mountain, and there they used helicopters to lower the sections into place.
Q:How do you hang origami cranes?
TAke a needle threaded with a long piece of black thread, and make a small knot at end of long thread. Push the needle thru the middle of the crane's back and pull the thread all the way thru the hole till the knot catches. pull the needle off the loose end of the thread and make another knot on that end. take a push pin or thumb tack and push the pin thru the knot, then push the pin or tack into the ceiling. FYI, tape never works - I have tried. The black thread lets them flutter a bit, and is invisible most of the time. p.s. ask your parents if you can hang stuff from the ceiling first. they may not want you to do that since it will leave holes in the ceiling when you take them down.
Q:Moment Problem, Help! A crawler crane of 10,000N weight, has a 20-M boom weighing 1000N acting midway....?
Q:Making 1000 origami cranes?
It's like asking: If you make a wish on a shooting star, will it come true? Although both are nice gestures, no it will not come true. Origami cranes are simply pieces of paper that are folded to resemble birds; no matter how many you make, they will not take on supernatural abilities such as wish-granting.
Q:what can lead tower crane to blank out?
(1) tower crane has crack; (2)Brake block friction lining wear up to 50% ofRaw material thickness ; (3)Brake wheel surface wear reaches 5mm ~ 2mm (4)Spring has plastic deformation; (5)Lever system, air travelis more than about 10% of its rated trip
Q:does wing chun and karate come from the same white crane style of wushu/kung fu?
Ng Mui, the Shaolin monk that survived to carry the research in Wing Chun, was a specialist in the white crane style, I have heard.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range