Tower Crane TC6024 Construction Equipment Sales Wholesaler

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Tower Crane TC6024 Construction Equipment Sales Wholesaler


\Tower Crane TC6024 Construction Equipment Sales Wholesaler\

Tower Crane TC6024 Technical Sheet:

Tower Crane TC6024 Construction Equipment Sales Wholesaler

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How difficult is white crane boxing?
its verry hard to find a place that teaches white crane boxing you are better off looking for hung gar its more easy to find a hung gar place plus hung gar has some moves from white crane boxing.
Q:Estimating crane size...?
The only effective way to estimate the size of a crane when needed is to know, without a doubt the weight of the heaviest thing that you have to lift, and allow at least a 20% margin for safety. This is standard practice in building bridges, in particular - the weight of EVERYTHING is clearly marked, or just generally known. If there are bridge segments to load on a barge, for example and the heaviest segments are 220 tons, then a 300 ton crane is used. Always err on the side of safety.
Q:Where are gears used on a crane?
It's more a matter of where gears MIGHT be used. 1. Gear reduction to lifting cable drum. 2. Gears to rotate the crane, or driving cable drum to extend jib. 3. If a mobile crane, gears to transmit drive to wheels/ tracks etc.
Q:Making 1000 origami cranes?
It's like asking: If you make a wish on a shooting star, will it come true? Although both are nice gestures, no it will not come true. Origami cranes are simply pieces of paper that are folded to resemble birds; no matter how many you make, they will not take on supernatural abilities such as wish-granting.
Q:Hunger Games Movie Spoiler! (question about Seneca Crane aka Gamemaker)?
Yes, although it is only a movie adaptation; it isn't supposed to be mentioned in the first book. In Catching Fire, the second book of the trilogy, President Snow hints to Katniss that he had Seneca Crane executed because of his decision to let allow both Katniss and Peeta to emerge as victors, but his exact method of doing so was never mentioned; in the movie, it just reinforces this and heavily implies that the method of Seneca's execution is to lock him in a room with absolutely nothing but the nightlock berries, forcing him to commit suicide or eventually starve to death.
Q:Best structural crane design?
Is this for a nuclear power station? If 2500 Te and 60m really are the specified loads and span then it is likely that it will be used very seldom. In theory you can design for any load to be lifted but maintenance on a crane system that is used once a year (10 years?) is a real problem. The main items to consider are: Availability of winches and bogies which then dictates running beam and rail sizes. For the spanning beam several alternative sizes needed to be designed and then costed. It will be not just weight but transport costs that determine the most efficient sizes The overall height of the crane will then determine the required roof height assuming that the crane is under cover. For comparison the Harland and Wolf cranes in Belfast called Samson and Goliath can lift 840 Tonnes each. Overall design needs to consider speed of travel, acceleration and deceleration rates and a host of other things.
Q:the lifting capacity of a hydraulic crane is based on two primary design factors what are they?
The potential lifting force of a hydraulic crane is primarily based on the diameter of the piston and on the pressure of the oil. Everything else is subservient, but necessary.
Q:Why are the rescue workers in turkey not using cranes to remove the debris of the earthquake? ?
It's a good thought, but, in addition to the points others have mentioned, there could be 500+ collapsed buildings in even a small city. How many construction cranes with sufficient lifting capacity do you think a small town would have? How many qualified operators would there be (keeping in mind that some of them may themselves be buried in the rubble? Amateurs operating heavy equipment in the situation - well meaning though they may be - is almost sure to cause additional casualties among the rescuers. In any case, my personal opinion (cynical, for sure) is that the news media would rather have footage of the rescuers desperately digging by hand than a crane lifting huge slabs off of victims. There is much more pathos and drama in a hand dug rescue than a mechanical one, even if the mechanical one is actually more difficult to arrange.
Q:Tower crane (tower crane)
In the form of the structure for the tower type, flat type and movable arm type. The model can be divided into QTZ63 suspension, QTZ80 crane, QTZ125 crane, QTZ crane, 315 crane and so on according to the moment division. Now used to arm length + tip weight of the way named, for example, 5513, that is, the longest length of 55 meters arm, the tip of the largest weight of 1.3 tons.
Q:The Open Boat by Stephen Crane-setting and relationship to the theme?
I can't tell you what to write or what you see as the theme but one of the themes in the book is man versus nature. Maybe you could discuss the setting as part of nature and what Crane seems to be saying about it. One thing that might help is a poem Crane wrote which explains how he sees things. Maybe you already know it. It's titled A man said to the universe A man said to the universe, Sir, I exist! However, replied the universe the fact has not created in me a sense of obligation. An indifferent universe. Not unlike how Thomas Hardy saw things.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range