Tower Crane TC6024 Construction Equipment Building Sale Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Tower Crane TC6024 Construction Equipment Building Sale Machinery


\Tower Crane TC6024 Construction Equipment Building Sale Machinery\

Tower Crane TC6024 Technical Sheet:

Tower Crane TC6024 Construction Equipment Building Sale Machinery

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the construction cranes? 50
The most common are tower cranes, elevators, and freight lifts. The big construction enterprise also has the track type tower crane
Q:How did the tower crane rise on the construction site? Fifteen
With a bar of steel, each layer has about 10 or more bars of steel. When the building rises, add a few more bars to the top floor, plus a few layers. It uses the stability principle of the triangle to keep the tower crane from tilting, and it also needs to pull some cables around to keep it balanced, just like a country pole.
Q:What is the inspection certificate for tower cranes?
Inspection certificate of tower crane must have two certificates:1, the manufacturer issued its own "product quality certificate"2. The product quality supervision and inspection certificate issued by the Technical Supervision Bureau
Q:What parameters are lifting machines called large equipment? 200
General purpose gantry cranes: MG, 440t, MG, 360t, MG, 450t, Me, 360t, ME, 900tGeneral purpose bridge crane: QD, 350t, QD, 400t, QD, 450t, QD, 390t, QD, 330t, QE, 350t, QE, 330tThe above tonnage is now recognized as a large lifting machinery.Hoisting machinery refers to the lifting of heavy objects with hooks or other lifting devices, and mechanical operations such as lifting and moving in space. There are many classifications of cranes, such as cranes, cranes, cranes, cars and so on. They are commonly referred to as one or more kinds of cranes.
Q:When the tower crane foundation is found, what should be discontinued?
The settlement, inclination and cracking of tower crane foundation can affect the stability of tower crane and should be stopped
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
According to GB specifications:2.0.3 the installation and disassembly of tower cranes shall be provided with the following personnel:1. The project and the safety supervisor and the mechanical management personnel who have the safety inspection certificate;2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:What are the main parameters of a tower crane?
The main parameters of tower crane are:1, rated lifting torque. Lifting torque is the most comprehensive reflection of tower crane performance because the lifting torque itself is the product of the two parameters of magnitude and weight. The lifting moment is the product of the lifting and the amplitude.2, lifting range. The lifting range is also referred to as the radius of gyration or the radius of work. It refers to the horizontal distance from the center of the tower crane to the center line of the hook. The range contains two parameters of maximum amplitude and minimum amplitude.3. Rated lifting capacity. Rated lifting capacity refers to the weight of a crane under different working conditions. In general, the lifting capacity and the maximum lifting weight are marked in the main performance parameters, and the rated weights of other states are determined by their characteristic curves.4, maximum lifting height. For boom type tower cranes, the maximum lifting height according to the boom of the elevation and the tower height is different.
Q:Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
This is the old saying. The international standard is now used. For example, the QTZ100T.M lifting torque is 980KN.M (kn. Meters).The QTZ100 is similar to the lifting torque of the TC6013. But not the same model.
Q:Are there any special requirements for the installation of wall fittings of tower cranes?
The spacing along the height of the retaining wall piece must comply with the installation instructions for the tower crane;

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range