Tower Crane TC6016 from Famous Chinese Factory

Ref Price:
$40,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Structure of Tower Crane TC6016 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction          

Max.Lifting Load: 10T                            

Max Tip Load:1.6T                          

Independent Height:50.5M

Max Lifting Height: 200M                      

Span: 60m                                      

Certification: CE,ISO

Place of Origin: China(Mainland)          

Model Number: TC6016         

 

Packaging & Delivery of Tower Crane TC6016


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Feature of Tower Crane TC6016


 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 


Tower Crane TC6016 Specifiction



 


Images of Tower Crane

 

 

FAQ of Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Method for operating tower crane
2.21, drivers must pass the escalator up and down, up and down the escalator, hand tools are prohibited items.2.22 do not drop any objects from tower cranes or defecate.2.23 winter in tower crane operating room heating, should be taken to prevent electric shock and fire measures.2.24 any tower crane with an elevator must comply with the instructions in the elevator manual. No overloading or violation of the operating procedures.2.25 multi machine operation, should avoid two or more than two tower cranes overlap in the radius of rotation. Special circumstances, need to overlap operations, must be safe distance between the vertical arm to ensure the safe distance and the lifting of materials, and have reliable safety measures approved by the competent technical leadership before construction.2.26 jib cranes in heavy lifting off the ground after lifting, rotating and walking three actions can be done at the same time, but the amplitude only alone, strictly with variable load. A crane that allows variable amplitude loading shall not vary at full load or near full load.2.27 lifting hoist is not installed in the rotating part of the crane, lifting operations may not continue in one direction continuous rotation.2.28 a crane with a mechanical torque limiter must adjust the tonnage indicator of the overload limit device according to the radius of gyration and the rated load at that radius.2.29 bend rail subgrade must comply with the provisions of the crane should turn on the outer rail surface of the sand, rail, rail and wings painted with grease. The counterweight box shall be turned to the direction of the outward turn. It is strictly prohibited to do lifting or turning on heavy roads.
Q:[tower crane] and [tower crane] what is the difference between, how to distinguish?
To put it plainly is a great name.A nickname is.
Q:What is an attached tower crane?
Its weight is 5 ~ 100kN, lifting radius of 3 ~ 35m (trolley), the lifting height is 160m, the maximum lifting torque of 1600kN - m, each with high 2.5m, the QT4 - 10 type crane lifting system comprises a lifting sleeve frame, long stroke hydraulic jack, bearing seat, lifting beam and a positioning pin. The cylinder block of the hydraulic jack is installed on the support seat at the bottom of the tower, and the lifting process can be divided into five steps.
Q:What special operators should be equipped for the installation and disassembly of tower cranes?
According to the requirements of the 2.0.3 specification: tower crane tower crane installation and disassembly operation should be equipped with the following: 1, hold a qualified safety assessment certificate of the project and responsible for the safety of people and machinery management personnel; 2, with construction qualification certificates for special operations of the construction hoisting machinery installation and disassembly, lifting work, special operation signal heavy drivers, riggers and other operations personnel. And an electrician.
Q:What is the difference between a tower crane QTZ31.5 and a QTZ40?
Lifting moment, arm length, elevation is not the same ah! Specifically, the maximum lifting weight of QTZ315 is 3 tons, the length of the arm is from 38-42 meters, the elevation is 27-28 meters; the maximum QTZ40 is 4 tons; the length of the arm is 42-48 meters; the elevation is 29-32 meters.
Q:What parameters are lifting machines called large equipment? 200
Said here [] large equipment is a concept that means assessment of whether you did more complete, more complex, (conceptual) large equipment, imagine that you provide [small] equipment detection report may not require? If you can provide a full set of drawings of a mobile phone, it will be recognized, but the mobile phone is never a large [device], the key point, appraisal is the assessment of your ability, to see if you have experienced, or complete certain system equipment manufacturing processThere should be no concept of magnitude, and it's really not a good division of magnitudeAs many job posting said, that is the requirement of [bachelor], college students will be delayed if from yourself, if you have the strength, should be bold to recommend myself, because any recruitment notice can't say: we only recruit college students......
Q:What is the difference between crawler crane and tower crane?
Difference:1, tower crane tower body (lower) stand up like a tower, so called tower crane; crawler crane slewing below is tracked chassis, like crawler tractor chassis.2, tower cranes are generally used in high-rise building construction, lifting and attaching, arm pole is very long, construction site is very common. Crawler crane is used in municipal engineering, such as subway, bridge and so on.3, the tower crane jib with flat arm, arm, is mainly composed of steel frame. Crawler crane boom is mostly steel frame, similar to the tower crane boom.
Q:Tower cranes should stop working when the wind speed is greater than the magnitude.
Tower crane work is strictly prohibited at grade 4 or above
Q:Construction tower crane driver (T) Ben can be used as construction crane driver (S)?
Building crane driver (T); tower crane driverConstruction crane drivers (S); construction elevator drivers; neither is common.
Q:How much is a team of 40 tower crane
Tower crane rental generally do not rent pricing, can not count number, not today is installed, removed tomorrow!Usually on a monthly basis, with or without use!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range