Tower Crane TC6016 Construction Equipment Wholesaler

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6016 Description:

1.CMAX Tower Crane TC6016  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6016 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6016 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6016  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6016  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6016  Parameter:

 Max. working range 60m, tip lifting weight 1.6T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 1.6


Tower Crane TC6016   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC6016 Diagram:

Tower Crane TC6016 Construction Equipment Wholesaler

Tower Crane TC6016 Construction Equipment Wholesaler

Tower Crane TC6016 Technical Sheet:

Tower Crane TC6016 Construction Equipment Wholesaler

Tower Crane TC6016 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6016 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What would be a nice [short] Qur'an ayat or hadith to put on a paper crane?
Sister, I wouldn't advise you to write a verse or a hadith on it. I'm just saying because if you are going to give it to somebody, you never know if they'd take care of it or not. What if it ends up in the garbage or on the floor etc.. Just use a quote that you like. Salam :] ----- Well I have a list of quotes that can fit in a paper crane, I hope you find one of those you like. ===== One man with courage makes a majority.~~ Andrew Jackson “behind the mask of ice that people wear, lies a heart of fire”~~ Paulo Coelho Courage doesn't always roar. Sometimes courage is the little voice at the end of the day that says I'll try again tomorrow. ~Mary Anne Radmacher “pain is temporary, quitting lasts forever” ~~lance Armstrong “Hope is the thing with feathers That perches in the soul, And sings the tune--without the words, And never stops at all,” ~~ Emily Dickinson “Hope is like a road in the country; there was never a road, but when many people walk on it, the road comes into existence.”lyn yutang The Grand essentials of happiness are: something to do, something to love, and something to hope for. Allan K. Chalmers Practice hope. As hopefulness becomes a habit, you can achieve a permanently happy spirit. -- Norman Vincent Peale We live by admiration, hope and love. -- William Wordsworth “Many of the great achievements of the world were accomplished by tired and discouraged men who kept on working.” “What seems to us as bitter trials are often blessings in disguise Oscar Wilde
Q:for example, if the crane boom lenght is 40 and radius is 11 meter,the how to know about the angle.?
You can figure out your angle with the Pythagorean method. Also, you should NEVER operate a crane with any indicator device not functioning. This in violation of OSHA law and many state and local laws. If there is any damage or injury you will be held negligent..
Q:Can't see the crane in white crane... Why?
the Vert Shock plan your straight leap is going to be impressive. If you fallow the indications presented in this program you will work on all of the facets of vertical getting, you'll preserves your time by preventing inadequate techniques and concentrating only about what actually performs and the truly crucial, this system can help you include as much as 15 inches to your straight!
Q:how do they erect cranes? has anyone seen one go up?
I okorder.com you may find an article mate
Q:How did they get that crane on the top of the Deutsche Bank bldg here by the WTC in NY?
They do it a few diferent ways: (1) They use another crane to put it up there (2) They fly it in - either whole or in pieces - usually with a set of helicopters (3) The pieces are lugged up in an elevator and assembled up on top Seriously, most cranes are bought to the site in pieces and assembled on the fly. They can usually put them up in a span of a few hours. They have the erection of the cranes down to a simple science nowadays. They can also build the crane by using a small crane at the start and building on that until they expand it out to a large one.
Q:How long does it take to fold 1,000 origami paper cranes?
Do one and time it, then multiply by 1000. Subtract some time because you will get faster from experience.
Q:How does a climbing or tower crane work?
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:Can anyone help me interpret the poem Fear by Hart Crane? or North Labrador?
Analysing Poetry Close reading may seem like a foreign and unfamiliar approach to analyzing a piece of text. However, it can often yield insights that will help you to create a unique paper developed from your own interpretation of the text. To analyze the work effectively, it is useful to concentrate on specific components of literature used to build and reveal the themes in the work. This process will help you explain how a passage relates to central themes in the text allowing you to reach an intelligent and creative thesis for a literary analysis. First, choose a passage (or a series of passages) that intrigues you.
Q:How do you win something from those crane machines in stores?????
You dont!! Most times as said its luck. The toys and goodies weight alot so its hard for the claws to lock on to them.
Q:airsoft gun crane stock to full stock switcharoo?
Ok, I can help. The first step is to take the crane stock off. To do so, extend the stock fully. Then, take the tab you use to extend it, and instead of pushing up to extend it, pull it down and slide the stock off. It make take some force. Be careful of any wires and that you don't break them! Next: take the buffer tube out. Take a long phillips head screw driver and stick it down the shaft. Remove the screw. The whole tube should come out. Don't lose the screw! Next: Install your stock. Next: Screw the screw back in to secure the stock. Done! Make sure the wires are still ok and that they are not pinched!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range