Tower Crane TC6016 Construction Equipment Wholesaler

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6016 Description:

1.CMAX Tower Crane TC6016  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6016 can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6016 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6016  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6016  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6016  Parameter:

 Max. working range 60m, tip lifting weight 1.6T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 1.6


Tower Crane TC6016   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC6016 Diagram:

Tower Crane TC6016 Construction Equipment Wholesaler

Tower Crane TC6016 Construction Equipment Wholesaler

Tower Crane TC6016 Technical Sheet:

Tower Crane TC6016 Construction Equipment Wholesaler

Tower Crane TC6016 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6016 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How high the tower crane needs to be installed with the wall pole. How is it stipulated in the national standard?
Beyond the maximum independent height of the tower crane design, a wall attaching rod shall be installed
Q:What are the safety devices for tower cranes?
Safety device for tower crane(1) lifting moment limiter, tower crane in lifting objects, the lifting radius and weight of the crane product is a constant number. According to this principle, a lifting torque limiter has been developed, the main function is to prevent overloading of the safety devices. The moment limiter only acts as a protection against the overload torque in the vertical vertical plane of the tower crane arm, and can not protect the tilting accidents caused by oblique hanging, wind load, rail inclination or collapse, etc..(2) weight limiter weight limiter's role is to protect the goods lifting weight does not exceed the maximum allowable weight of tower crane, tower crane is used to prevent the load exceeds the maximum rated load, avoid mechanical damage accident.
Q:What are the luffing, slewing, and walking points of a tower crane?
The luffing of a tower crane is the forearm of a crane;Slewing means the steering mechanism of a crane;Walking means the walking trolley on the luffing range of a crane
Q:Tower crane demolition safety technical disclosure, how to write?
Baidu search:Tower crane removing and lowering joint safety technical disclosure.
Q:Tower crane 4 how to change the rate of 2 magnification, how to change, say detailed points
There is a magnification pin on the hook group. When the magnification pin is removed, the pulley will automatically slide to the lifting trolley. At this point, the rope will be turned into 2 fold!Some manufacturers produce pulley, also need to be in the car, and then the magnification pulley with pin shaft fixed in the car!
Q:Emergency treatment of interrupted electricity during lifting of tower crane
It is very dangerous to stop the electricity during the lifting of tower crane. Because the slewing brake is missing, the tower crane is very dangerous because the wind rotates.
Q:What should be included in the disassembly plan of the tower crane?
- 3 - tower crane demolition special program should include the following1. General situation of engineering;2, the tower crane position of the plane and elevation;3. Disassembly order;4, unit weight and hanging point position;5, remove the auxiliary equipment types, performance and arrangement position;6, the power set;7, the construction personnel configuration;8. Rigging and special tools;9, major sources of risk and safety technical measures;10, emergency plans, etc..Note: (1) the special construction plan for the installation and disassembly of tower cranes shall be examined and approved by the units, technology, safety, equipment and other departments, and shall be implemented after approval by the supervisor.(2) the contents and requirements of the special construction scheme for tower crane installation;Compiled from the "building construction tower crane installation, use and disassembly safety technical regulations" JGJ196-2010, please refer to the implementation. Attached: 1, Zhifu Wanda Plaza Tower Crane installation program 2, Muping District Cultural Center project PT7528 tower crane demolition program
Q:What is an attached tower crane?
Attached tower crane is due to the height of the building is relatively high, a steel connection in order to strengthen the stability of tower crane between tower crane and tower crane building, this form is called the attached tower crane.
Q:What is the standard weight of a tower crane for 1.6*1.6*3 and 1.6*1.6*5m? Kg?
The standard weight of tower cranes for 1.6*1.6*3 and 1.6*1.6*5m is 500KG
Q:What are the main parameters of a tower crane?
For car luffing tower cranes, the maximum lifting height is only related to the height of the tower, and when the height of the tower is determined, the maximum height of the ceiling is a certain value.In addition to the 4 major performance parameters. And the working speed (including lifting speed, rotary speed and walking speed of car, traction speed), an important parameter gauge, wheelbase, total power, motor structure weight, balance and gross weight, etc.. These important parameters often determine the tower crane selection, such as speed of operation often determines the number of selected cranes, motor power requirements of power supply load, gauge, wheelbase of the site, and the structure weight, balance weight, weight of the foundation treatment of heavy machine requirement.Tower crane (tower crane) is called tower crane, also known as tower crane. A revolving crane mounted on top of a tall tower. The working space is large, mainly used for the vertical and horizontal transportation of materials and the installation of building components during the building construction. The tower crane consists of three parts: metal structure, working mechanism and electrical system. The metal structure includes the tower, the boom and the base. The working mechanism has four parts, lifting, luffing, turning and walking. The electrical system consists of motors, controllers, power distribution cabinets, connecting lines, signals and lighting devices, etc..

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range