• Tower Crane TC6014 Construction Equipment Building Sale Machinery System 1
  • Tower Crane TC6014 Construction Equipment Building Sale Machinery System 2
  • Tower Crane TC6014 Construction Equipment Building Sale Machinery System 3
  • Tower Crane TC6014 Construction Equipment Building Sale Machinery System 4
  • Tower Crane TC6014 Construction Equipment Building Sale Machinery System 5
  • Tower Crane TC6014 Construction Equipment Building Sale Machinery System 6
Tower Crane TC6014 Construction Equipment Building Sale Machinery

Tower Crane TC6014 Construction Equipment Building Sale Machinery

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Tower Crane TC6014 Description:

1.CMAX Tower Crane TC6014  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6014  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6014has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6014  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6014  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6014  Parameter:

 Max. working range 60m, tip lifting weight 1.4T and Max. lifting weight 8T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 46

Max height with attachment (m) 138

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 8

Tip load @ 50m (t) 1.4


Tower Crane TC6014   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC6014 Diagram:

Tower Crane TC6014 Construction Equipment Building Sale Machinery

Tower Crane TC6014 Construction Equipment Building Sale Machinery

Tower Crane TC6014 Technical Sheet:

Tower Crane TC6014 Construction Equipment Building Sale Machinery

Tower Crane TC6014 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6014 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “14” means the tip load is :1.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Q:Lifting tower crane tower more than 45 meters, the demolition cost and how to adjust the field Sinotrans transportation fees?
Self lifting tower crane tower 45 meters high to prevail, such as height of over 45 meters, each increased to 10 meters (less than 5 meters, excluding) demolition costs increase 20%, off-site transportation costs increased by 10%.
Q:if a crane just shows up and doesn't go what does that mean
The crane was usually considered to be a bird of Apollo, the sun god, who heralded in Spring and light. Throughout all of Asia, the crane has been a symbol of happiness and eternal youth. In Japanese, Chinese, and Korean tradition, cranes stand for good fortune and longevity because of its fabled life span of a thousand years. The Japanese refer to the crane as “the bird of happiness;” the Chinese as “heavenly crane” believing they were symbols of wisdom. Today this practice of folding 1,000 cranes represents a form of healing and hope during challenging times. After the events of September 11, as a gesture of support and healing, thousands of cranes were folded and linked together in chains and sent to fire and police stations, museums, and churches throughout New York City. Hope this helps! :)
Q:death... by exile!Also, which Batman movie was your favorite and why?Mine was the first because it was cool to see how Wayne started and got all the Batman stuff and the movie was less confusing, haha. Plus I thought the actor Cillian played Scarecrow really great :)
Yes, that was such a nice surprise. He was a great villain in Batman Begins. For a split second, I was like Wait a minute - the last time I saw Dr. Crane, he was freaking out on that Toxin they released into The Narrows. . ., but then, I remembered - he and everyone else affected by that poison were given the antidote after it was produced by Wayne Enterprises. His role as the judge at the sort of Reign Of Terror style court system is perfect - Crane clearly enjoyed watching people suffer mentally, liked seeing them terrified. Sadistic little twerp. Tough call on favorite.. . while I think the first two thirds of The Dark Knight are probably the very best of the series. . . my personal fave is Batman Begins, too. I can remember the first time I saw it, and as they're showing the establishment shot of those mountains in Asia, Raz Al-Ghul's lair. . . I kept thinking, this is different than any other Batman stuff I've seen - this is cool! Kinda sad it's over! :( Edit - And I just wanted to add - I've used that line Bruce's dad says with my own little son: Why do we fall? :)
Q:how do they get cranes on top of building sites?
With anouther crane.
Q:Is the first entry into the construction project? Or direct access to fixed assets?
First in construction project. When the installation is completed, when it is ready to use, transfer to fixed assets account and make depreciation
Q:Can anyone give me a summary of The Veteran by Stephen Crane?
This Site Might Help You. RE: Can anyone give me a summary of The Veteran by Stephen Crane?
Q:What is the scrap standard of tower crane hook?
The hook shall be scrapped at any time in the following circumstances:Crackle;The wear of the dangerous section is 10% of the original size;The opening ratio is increased by 10% than the original size;The twist of the hook is over 10 degrees;The dangerous section of the hook or the neck of the hook produces plastic deformation;The hook thread is corroded;When the hook bushing is worn at 50% of the original size, the bushing shall be replaced;The mandrel shall be replaced when the hook mandrel is worn at 5% of the original size.?The American Standard can provide for your reference:1, hook hanging points in the effective area of cross sectional wear more than 10%, should be disabled and scrapped.2 any visible permanent deformation and cracks shall be disabled and scrapped.3, if the wear is in the same area in two directions, it should be controlled within 5%.4, any hook opening deformation is not greater than 5%, or in accordance with the manufacturer's guidelines to determine.5, hook bow hook (i.e. intermediate position hook C shape) wear amount should be less than 5%.
Q:What kind of personnel should be installed for the tower crane installation and disassembly?
2, with special construction operation qualification certificate of construction, lifting machinery, installation, demolition workers, lifting signal workers, lifting drivers, cable operators and other special operations personnel.And an electrician.
Q:What is the present status of large Boom Tower Crane?
Large boom crane arm depicts one and another new history. New York's World Trade Center towers is the skyscraper that is the highest and has the most floor in New York City .Its main building is steel and concrete composite structures,using steel 78 thousand tons.The Building started in 1966 and lasted seven years, with 110 layers, 411 meter in height as a giant skyscraper it is writed in history. During in Construction
Q:Or would it be better to custom order for my applications?
1. Crane did not go out of business although they were on shaky ground a year and a half ago. A group of private investors and corporations baled them out. Howard's, Crower Comp are all pretty equal. Your car has roller hydraulic lifters so you'd better know what you're buying. Your missing some Chevrolet factory roller lifters and roller cam grinds. I see you haven't purchased the 2010 GM Performance Parts Catalog from your Chevrolet dealer parts counter yet. It's loaded with mild to wild hydraulic roller small block cams. You haven't figured it out yeat have you? A cam switch isn't going to make that 305 run worth a hill of beans. You need a set of cylinder heads to alow it to breathe first. Remember the EQ 3045A vortec performance heads for your 305? The valves ports are bigger and shaped for higher velosity. You're so stubborn I know you'll buy a cam first and whine like hell cause the car won't run any better. You'd better give this project a lot of thought because you're stuck with the stock intake and fuel/air mixer. Lower rear end gears such as 3.42's or 3.73's will wake the car up. Do that first and see if you want to spend any more money on it.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords