• Tower Crane TC5613 new sole dealer find System 1
  • Tower Crane TC5613 new sole dealer find System 2
  • Tower Crane TC5613 new sole dealer find System 3
  • Tower Crane TC5613 new sole dealer find System 4
  • Tower Crane TC5613 new sole dealer find System 5
Tower Crane TC5613 new sole dealer find

Tower Crane TC5613 new sole dealer find

Ref Price:
$40,000.00 - 200,000.00 / unit get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Quick Details of TC5613 Tower Crane

 

Feature: Tower Crane                          

Condition: New                                           

Max.Lifting Load: 8T

Span: 56m                                             

Place of Origin: China(Mainland)                

Model Number: TC5613         

 

Packaging & Delivery of TC5613 Tower Crane

 

Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Specifications of TC5613 Tower Crane

 

 

● Max. working range 56m, tip lifting weight 1.3T and Max. lifting weight 8T.

 

● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability.

 

● Reduce future maintenance cost.

 

 

Free standing height (m)

46

Max height with attachment (m)

150200

Working range can be adjustedm

445056

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 56mt

1.3

Hoist mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFc250M-4/8     30/30KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

00.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.5

Counterweightt

14.1

Mast section sizeL×W×Hm

1.8×1.8×2.5

Working temperature

-40+60

Total power (KW)

42

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 40 meters from site power source to lower

electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

 

Images of TC5613 Tower Crane

 

 

FAQ of TC5613 Tower Crane

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

 

 

To Lead The Revoluation of International Trade

 

Q:I want to join
Madras Institute Of Heavy Machinery in Thirumullaivoyal No 45, Thirumullaivoyal, Mth Road, Thirumullaivoyal, Chennai - 601209 (44)-26384031, 26382363, 26381739
Q:What should I do with them? who would accept them if I donated them?
Maybe go to a children's hospital and see if they will accept it. If they won't maybe they will know of an organization that will.
Q:Cranes are normally used in construction in most countries.But I saw some photos that show Iranians are hanging criminals in pubic with cranes instead of gallows.Is it more painful to the dying criminals to the last moment?Do you know why?
they probably didn't have the proper arrangements to carry out the punishment so they used cranes instead of gallows. who knows? but weird really. and it wouldn't be more painful... err... the purpose is to snap the neck... ouch :(
Q:i need the story cranes by hwang sun won and translated by peter h. lee and i cant find it on google. help i need the story for my essay
EEK! I just did a search under Hwang Sun Won. It appears that Cranes is a series of short stories. Is that what you meant? If it is one particular short story called Cranes, I can't find it. I would suggest you go to your teacher/professor and ask where to obtain a copy. If you can't ask your teacher, run, do not walk! to your nearest library and throw yourself on the mercy of the librarians! Another search option for you is to look for books by Peter H. Lee, specifically the ones he has edited. He has written several anthologies. Good luck!
Q:Can paper crane symbolise your love for a girl?
i did get 3 paper roses from a guy last weekend-was very much a nice gesture-so YES. And i am going to date the guy-so gl
Q:We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
Those type of cranes have a support system that is continuously built as the building gets taller. The crane climbs up on the support system to reach the next level and climbs down to get down
Q:we have a project starting that will require a stack built 1km high in the air?How will they install this?
Build form the top, when they build these huge cranes, they build the top section, lift that up and build the next section underneath it, set it down to release the lift off the top section and lower it to the second section. Lift those 2 sections from the bottom, build the third section underneath it, and so on. You need to lift securely, like on all 4 sides for stability, and that leaves the corners free to build the next section.
Q:I am reading catching fire and I'm at the part where Katniss just made a little dummy in the training session and she wrote the name seneca crane on it and the gamemakers were like shocked. Who is seneca crane? and whats up with her?
he was head gamemaker, not game master.
Q:the lenght of beam is 4.5mmaterial of beam is ASTM Gr60
difficult question
Q:analysis of jib crane?
I would suggest that you delete this question and submit a new question with enough details for someone to give you an answer. This is not a question I can give you much help on

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords