Tower Crane TC5613 Construction Equioment Sales Building Machinery Distributor

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC5613 Description:

1.CMAX Tower Crane TC5613  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5613  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5613 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5613  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5613  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5613  Parameter:

 Max. working range 56m, tip lifting weight 1.3T and Max. lifting weight 8T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 46

Max height with attachment (m) 150(200)

Working range can be adjusted (m) 44、50、56

Min working range (m) 2.5

Max lifting capacity (t) 8

Tip load @ 50m (t) 1.3 


Tower Crane TC5613   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5613 Diagram:

Tower Crane TC5613 Construction Equioment Sales Building Machinery Distributor

Tower Crane TC5613 Construction Equioment Sales Building Machinery Distributor

Tower Crane TC5613 Technical Sheet:

Tower Crane TC5613 Construction Equioment Sales Building Machinery Distributor

Tower Crane TC5613 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5613 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56meter, and the last two letter “13” means the tip load is :1.3 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a tower crane without a collector?
Once again, because the collector is using carbon brush and copper ring contact, the tower crane work in the sway of the impact is too large, easy to cause carbon brush and copper ring arc between burning. Combined with this reason, today's tower cranes do not use collector. The drawback is that the tower crane can not be one-way one-way rotation. So now the use of rotary limiter, set the tower one-way rotation can only turn 540 degrees, want to turn, can only turn in the opposite direction.
Q:Tower crane installation, wind speed is greater than 12m/s, wind should stop operation,
Surface wind speed is greater than 6
Q:What measures should be taken to make tower cranes stable?
The fatigue test data show that the fatigue life of the phosphating coating of steel wire rope is about 3 times of the same structure light steel wire rope (laboratory comparable conditions), not easy to wear and corrosion is not easy to cause the service life of wire rope large amplitude extension. Manganese phosphating is wear resistant phosphating, which can solve the wear problem in the use of wire rope and improve the corrosion resistance. It is for reference only
Q:What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
The car must have a support wheel to prevent the trolley from hanging in the middle.
Q:What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
Part: foundation, tower, wall unit, excessive section, lifting mechanism, rotating mechanism, lifting mechanism, the lifting arm, a balance arm, electrical control, safety protection device etc..Main technical parameters: maximum lifting weight, amplitude and maximum amplitudeLifting torque = magnitude X maximum amplitude lifting
Q:The rated lifting capacity of a tower crane refers to what is allowed and what is allowed to be divided by the crane
The total quality of the crane rated liftingweightincludes the lifting load and the hook and rope a simplified example, such as the rated lifting weight of 100 tons, the quality of the hook and spreader for 5 tons, the actual quality of the goods can lift 95 tons.
Q:The special equipment specified by the state is a periodical inspection cycle, wherein the crane is carried out every many years
(two) small light lifting equipment, bridge crane, gantry crane, gantry crane, cable crane, crane mast, railway crane, jib crane, mechanical parking equipment every 2 years 1 times, the crane annual molten metal and hot metal 1.The rated load test, static load test and dynamic load test shall be carried out in the first test and the first periodic inspection, and the rated load test shall be carried out 1 times after each of the 1 inspection periods.The inspection process, the existence of major risks of hoisting machinery (such as special work environment, frequent accidents, etc.), inspection agencies approved by the provincial quality technical supervision department agree, can be appropriate to shorten the regular inspection period, but the short period of not less than 6 months.
Q:Protective earthing resistance of tower crane
Q:Ask about the lift and transportation of the jack up tower crane
If it implements specialized subcontracting, it shall be organized by the subcontractor. Led by the security establishment or technician, audit professional and technical personnel to audit the Organization Department of the unit by unit technology, construction technology, safety, quality and other departments, and ultimately approved by the signature of the person in charge of enterprises (393 orders), and the general contractor technology are also responsible to approval.
Q:What is the difference between a tower crane and a jack up tower crane?
The fixed tower crane means lifting the foundation of the tower body on the foundation or structure through the connecting piece.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range