Tower Crane TC5610-F-40 for Construction

Ref Price:
$40,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Brief Description:

 

Tower crane 5510 is used to lift building material such as concrete, steel bars vertically and horizonally.

All tower cranes consist of the same basic parts:

1. The base is bolted to a large concrete pad that supports the crane.

2. The base connects to the mast (or tower), which gives the tower crane its height.

3. Attached to the top of the mast is the slewing unit (large ring-gear and motor) that allows the

crane to rotate.

4. Attached to the slewing unit is the jib (or boom), the machinery arm, the counterweights

 and, the Operators cabin


Features:


Typehammer head
Max loading capacity: 6t

Tip loading:1t

Jib length:56m

Free standing height:40m

Mast section: L46A1(1.6mx1.6mx3m)

 

Tower Crane TC5610-F-40 for Construction

Tower Crane TC5610-F-40 for Construction

 

Loading Diagram:

Tower Crane TC5610-F-40 for Construction

FAQ

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.

 

2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period. 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:HELP me CRANE FLYS ARE IN MY HOUSE 5 AT LEAST!?
Just gently scoop them up in your hand and put them outside.They don't bite!
Q:Burj Khalifa: How was the Crane Removed?
They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts
Q:How did they get that crane on the top of the Deutsche Bank bldg here by the WTC in NY?
Deutsche Bank... German Bank... well they heard that someone else wanted to put a crane up there, and so they got up at 5 am and made sure theirs was there first... using the same methods as they do with their towels at a beach or pool on holiday! Hee hee... But most probably with extreme cleverness!
Q:How good a job do you think Crane did in voicing the theme of pride/morales in Red Badge of Courage?
How good a job do _you_ think he did? If this is a homework then your teacher wants _your_ opinion, not that of a stranger on the internet.
Q:How does a climbing or tower crane work?
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.
Q:How did the tower crane rise on the construction site? Fifteen
In the table below the tower crane is the upper part of the tower body has four jacks, the top of the cage tower (tower of each section is called a tower cage) a little bigger than the following (which can be installed under a small tower, heightening cage) need to jack up above "high rise to work, just a small tower added into the big cage, the cage towers bolted, or tall tower cage can be fixed.
Q:The role of slewing limiter in tower cranes is limited
The function of the rotary limiter is to restrict the large arm to stop at a certain setting. Protect from turning to dangerous range so as to avoid collision and other dangerous accidents!The function of the amplitude limiter is to restrict the car to come out or return somewhere to stop and protect the car from or within certain dangerous range.The hook safety device is to prevent the wire rope from falling out of the big hook, so as to avoid falling and other dangerous events!
Q:Is the Stephen Crane Short Story The Bride Comes To Yellow Sky a Big Fat Parody?
I have to say no. Your question erred in a significant way. Hollywood didn't create this false image of the West. The false image was created a long time before by people living in the age of the incidents. It didn't take publishers long to notice that people living back East enjoyed these gritty depictions of the West. Dime novels were a big seller in the 18th and 19th centuries. Look at Stephen Crane. He died in 1900. Hollywood was non-existent as the facet of American life that it holds now. Crane would have been writing this story with the idea that he was depicting a real slice of the wild West that was becoming more civilized.
Q:1000 Paper Cranes?
i know this big organisation in Japan and some of my frineds live there... if you are interested, I can give you the address and more details...etc
Q:Dan Fielding(Night Court) Vs Denny Crane(Boston Legal) Who Would You Want As Your Lawyer?
Denny Crane.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range