Tower Crane TC5610 Construction Equipment Sales Wholesaler

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC5610 Description:

1.CMAX Tower Crane TC5610  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5610  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5610 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5610  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5610  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5610  Parameter:

 Max. working range 56m, tip lifting weight 1T and Max. lifting weight 6T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 41.5

Max height with attachment (m) 141.5

Working range can be adjusted (m) 44、50、56

Min working range (m) 2.5

Max lifting capacity (t) 6

Tip load @ 50m (t) 1


Tower Crane TC5610   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5610 Diagram:

Tower Crane TC5610 Construction Equipment Sales Wholesaler

Tower Crane TC5610 Construction Equipment Sales Wholesaler

Tower Crane TC5610 Technical Sheet:

Tower Crane TC5610 Construction Equipment Sales Wholesaler

Tower Crane TC5610 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5610 for example, the first two letters “TC” means Tower Crane, “56”means jib length is 56 meter, and the last two letter “10” means the tip load is :1 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What should we do after folding the 1,000 cranes?
I've only heard of putting them up on strings and you could give them as gifts .. Oh and you could also frame them by laying them flat
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:Where on millsberry is the chips ahoy crane/machine?
Sorry, but there's no such thing as a Chips Ahoy Crane/Machine. I'm pretty sure I know what you're talking about, though. Chip the Wolf's Grabbing Machine, right? They deleted it a while ago. Links used to work for about a month after they deleted the machine, but now they don't. I would explain how it used to work, but it wouldn't benefit anyone at all(and it would just take up my time). fruits_7_40_12 (check out my house and yardsale)
Q:The mobile crane has a weight of 116kip and center of gravity at G1; the boom has a weight of 29kip and center?
The key here is to simplify this as much as possible The equation is really: mass 1 x length 1 + mass 2 x length 2 = mass 3 x length 3 G1 * 6 ft = (G2 * X ft) + H3 * X ft) G1 = 116 kip G2 = 29 kip H3 = 38 kip Now it is an equilibrium of torque about the point where the boom pivots: 116 kip * 6 ft = 29 kip * Xft + 38 kip * Xft solve for X feet: X feet = 10.388 ft So the crane is in equilibrium when the load is length1 + length 2 times the mass = mass of motor * length 3 (10.388 ft * 29 kip) + (10.388 ft * 38 kip) = 116 kip * 6 ft The boom forms a triangle with the hypotenuse equals 12ft + 15 ft = 27 ft. The bottom of the triangle is 10.388 ft + 10.388 ft = 20.776ft So we have two sides of the triangle and now just need to find the angle where the triangle forms with those two sides: cosine of angle = adjacent side / hypotenuse cosine of angle = 20.766 / 27 = 0.7691 and the arc cosine of that = 39.7 degrees So rounding it off, angle of crane = 40 degree
Q:How to calculate life span of steel structure? for example, crane?
To calculate it, you would need to know all of it's dimensions, the average loads that will be applied to it daily, the natural conditions which the structure is exposed to, the carbon content of the steel as well as the manner in which the raw steel was produced AND the manner in which the crane was assembled. Even with this data it would still be an extremely generalized calculation.
Q:What are the construction cranes? 50
The most common are tower cranes, elevators, and freight lifts. The big construction enterprise also has the track type tower crane
Q:I am a fellon, I made a mistake and I need help getting my crane certifacation. so I can work.?
Without okorder.com/
Q:what dose fury mean and craned?
Q:How do they put up tower cranes?
They okorder.com/
Q:Are the Harland and Wolff cranes in Belfast famous?
The cranes are iconic in Belfast and Northern Ireland. The company itself is most famously known for the building of the Titanic they also specialize in off-shore construction as well. I would say they are well known in Ireland and in some parts of the UK. They are probably known a bit in England as they were very interested in Belfast's heavy industry in the past. I don't think many people outside of Ireland and the UK would know about the Harland and Wolff cranes tbh. You can see them from many places in Belfast and they are a prominent landmark.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range