Tower Crane TC5610 china factory supplier

Ref Price:
$40,000.00 - 200,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Structure of Tower Crane TC5610 Description


Feature: Tower Crane                          

Condition: New                              

Application: Construction          

Max.Lifting Load: 6T                            

Max Tip Load:1.0T                          

Independent Height:41.5M

Max Lifting Height: 141.5M                   

Span: 56m                                      

Certification: CE,ISO

Place of Origin: China(Mainland)          

Model Number: TC5610         

 

Packaging & Delivery of Tower Crane TC5610


Packaging Detail: Nude package          

Delivery Detail: 25-30days

 

Main Feature of Tower Crane TC5610


 

1)  It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

 

2) The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

3) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 


Tower Crane TC5610 Specifiction

Free standing height (m)

41.5

Max height with attachment (m)

141.5

Working range can be adjustedm

445056

Min working rangem

2.5

Max lifting capacityt

6

Tip load @ 56mt

1

Hoist mechanism

Falls

2

4

Lifting capacityt

1.5-3

3-6

Speedm/min

0-80

0-40

Motor

YZRDWF225M-4/8-24/24KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4/8/16-3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

0-0.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.58

Counterweightt

44m      jib length

50m     jib length

56m         jib length

12

13.05

14.1

Mast section sizeL×W×Hm

1.6×1.6×2.5m

Working temperature

-40+60

Total power (KW)

37

Power supply requirement (KVA)

170KVA for generator

Cable type ( within 40 meters from site power source to lower

 electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       170A

Rated working voltage & current

380V                   108A


Images of Tower Crane TC5610

 

 

FAQ of Tower Crane

 

Q: What is the principal to quote the right tower crane to the client?

A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.

Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……

Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….

 

Q: What about our tower crane's warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the tower crane?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the main technical parameters of a tower crane?
Generally speaking, the main parameters of the tower crane are:Maximum amplitude unit MMaximum lifting height, unit MMaximum lifting torque unit KN.mMaximum lifting speed unit m/minMaximum lifting unit tRotational speed unit r/minVariable speed unit m/min or o/minWalking speed per unit m/minMotor power unit w......Please refer to the product manual.
Q:Method for operating tower crane
In the 2.11 operation, when lifting the weight, the weight should be higher than the height of the obstacle, at least 100mm.2.12 when the crane is approaching the track limit, it should slow down and stop in advance.2.13 when lifting heavy objects, not heavy lifting suspension instability, no additional weight in lifting objects, lifting scattered materials or special-shaped components must be used when the wire rope firmly tied to heavy lifting from the ground about 50cm stop, determine the brake materials, lashing and rigging, confirmation before lifting command.2.14 cranes must be adequately illuminated at night.2.15 crane in the stop, rest or midway power failure, the weight should be unloaded, not to weight suspended in the air.2.16 the operating room, no personnel shall enter, prohibited flammable and impede the operation of the items.2.17 is strictly prohibited or promotion personnel riding crane. Landing weight, weight is prohibited to stand.2.18 the boom and lifting pieces of cranes must be in safe distance from overhead transmission lines, and shall comply with the provisions of this schedule 30.1.6.2.19, two cranes in a track or two parallel or vertical orbit on the operation, should maintain the safety of any part of the distance between two machines, the minimum shall not be less than 5m.2.20 in case of any of the following circumstances, suspension operation shall be suspended:1., in the event of bad weather, such as heavy rain, heavy snow, fog and construction work surface has six (including six) above the strong winds, affecting safety construction.2. crane leakage occurs.3. serious wear of wire rope, to scrap standard (wire rope scrap standard see Appendix A).4. safety guards fail or display inaccurate.
Q:What are the components of a tower crane? What are its main technical parameters? What is lifting torque?
Part: foundation, tower, wall unit, excessive section, lifting mechanism, rotating mechanism, lifting mechanism, the lifting arm, a balance arm, electrical control, safety protection device etc..Main technical parameters: maximum lifting weight, amplitude and maximum amplitudeLifting torque = magnitude X maximum amplitude lifting
Q:Tower crane TC6013A-6-A2, what does "A-6-A2" mean later?
QTZ100 in fact, there are two symbols behind T.M, which is used in the country.Q is lifting, T is tower, and Z is self elevating. The 100 is its lifting torque, which means 100 tons. Meters (T.M).
Q:What are the four major moving mechanisms of a tower crane?
Four big bodies of tower crane: lifting, slewing, luffing and walking.
Q:Can the tower crane personnel install the construction elevator?
As for the hoisting equipment, the licensed crane erection worker can install the construction elevator.
Q:What are the parts of a tower crane? What are their main functions?
The structural elements include the followingMain arm: carrying weight, and making the trolley have walking track.Balance arm: put up lifting mechanism, electric box, counterweight, and make tower crane to achieve balance torque, reduce the standard section of the bending moment.Tower cap: connect the main arm with the balance arm by the tie bar, so as to reduce the bending moment of the standard section.
Q:Operation points of tower crane (tower crane)?
Safe use requires the use of tower crane, issued by the state competent authorities shall abide by the rules and regulations, but also comply with the relevant provisions in the manual: the crane working environment temperature is -20~40 degrees Celsius, the maximum working pressure is 205N/m2, when should stop using the winds of more than 6 level; the same construction site to install more than two sets of tower crane when should pay attention to the location of each tower, take the elevation of different operations, in order to avoid the tower crane jib, balance arm collision accidents; safety device of tower crane, luffing and slewing height, mass and moment limiter, the last two more important, if the two is not detected qualified, will be regarded as the unqualified, because it plays a role to ensure the safety and prevent the tilting of the tower crane. As a construction site, the tower crane torque limiter failure or to replace the operating personnel mistakenly believe that daily only hanging 800-1000kg materials, not what the risk, the results in a process of lifting materials, because of the construction site is narrow, hanging by the operator sight blocked, hanging objects hanging on building the steel frame, caused by tower crane shaking, was the occurrence of major accidents, thanks to the ground work riggers promptly notify the operator immediately stop to avoid rollover accident of tower crane appeared. It is obvious that all safety devices on the tower crane are essential and must be checked regularly to ensure that all the safety devices are in good condition, sensitive and reliable.
Q:What are the safety devices for the horizontal arm self lifting tower cranes?
(1) the lift height limit position limiter must be able to stop lifting motion immediately when the lifting device is raised to the 8OOmm at the lower end of the boom. For luffing cranes, lift the top of the hook to the lower end of the frame 500mm. The lifting movement must be stopped immediately. (2) lifting moment limiter and maximum weight limiter; when lifting torque reaches 90% of its rated value, the lifting torque limiter shall be able to issue an acoustic or red light to indicate the alarm. When the lifting torque exceeds its rated value and reaches 108% of the rated value, the lifting direction and outward direction shall be stopped. If the weight and amplitude indicator are set, the numerical value should be correct, clear and eye-catching. The digital error shall not exceed 5% of the indicated value. When the lifting weight exceeds the maximum weight, maximum lifting weight limiter should emit light or sound alarm, when the load exceeds the maximum weight of 6%, should stop to enhance the direction of movement, but to allow institutions towards the down direction.
Q:What are the basic parameters of a tower crane?
The basic parameters of a tower crane include the length of the crane itself, the weight of the crane as well as the weight of the counterweight! Tower crane lifting mechanism; slewing mechanism; luffing mechanism; motor power;...

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range