Tower Crane TC5516 Mast Section CMAX Brand

Ref Price:
$10,000.00 - 50,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 8T Maximum Lifting Height(M): 200M Rated Loading Capacity: 1.6T
Span: 55M Rated Load Moment: 100T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5516(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.

 

2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.


3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..

 

5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Specification of Tower Crane

 

Technical Sheet for TC5516

 

Free standing height (m)

44

Max height with attachment (m)

150200

Working range can be adjustedm

455055

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 55mt

1.6

Hoist mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFc250M-4/8     30/30KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

00.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.5

Counterweightt

17.6

Mast section sizeL×W×Hm

1.6×1.6×3.0

Working temperature

-40+60

Total power (KW)

42

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 40 meters from site power source to lower

electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

 

Loading diagram

 

55m jib length

R m

3.1—13.5

17

22

27

33

37

45

47

50

52

55

a=2

4t—24.65m

3.61

3

2.61

2.38

1.95

1.8

1.72

1.6

a=4

8t

6.2

4.62

3.41

3

2.61

2.38

1.95

1.8

1.72

1.6

50m jib length

R m

2.5—15.17

19.65

22

25

27.4

33

38.5

42

47

50

a=2

4t---27.6m

3.22

3

2.71

2.37

2.2

a=4

8t

6.2

5.53

4.76

4

3.22

3

2.71

2.37

2.2

 

45m jib length

R m

2.5—15.17

22

25

27.4

29.8

33

38.5

40

42

45

a=2

4t

3.65

3.22

3

2.87

2.71

2.5

a=4

8t---15.17m

5.53

4.76

4.2

3.65

3.22

3

2.87

2.71

2.5

  

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5516 Fast Delivery Factory

Tower Crane TC5516 Fast Delivery Factory

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What should we do after folding the 1,000 cranes?
I've only heard of putting them up on strings and you could give them as gifts .. Oh and you could also frame them by laying them flat
Q:did stephen crane win any awards?
Stephen Crane (November 1, 1871 – June 5, 1900) was an American novelist, short story writer, poet and journalist. Prolific throughout his short life, he wrote notable works in the Realist tradition as well as early examples of American Naturalism and Impressionism. He is recognized by modern critics as one of the most innovative writers of his generation.
Q:folding paper cranes?
You can send her a few NICE paper cranes and write her a nice letter, it's the thought that counts.
Q:Whats does the japanese crane symbolize?
The Japanese crane symbolizes serenity and hope. It is a legend in Japan that if you fold 1000 paper cranes, any wish will come true. There is a story about a girl named Sadako who died from radiation in Hiroshima after WWII who tried to fold 1000 paper cranes to be brought back to health. She nearly folded 1000, and died before then. People come to Hiroshima still today with 1000 folded paper cranes to honor Sadako.
Q:Can bearded dragons eat crane flies?
I wouldn't recommend it. I couldn't tell you if they are safe, but, at the very least, there is a very real risk that they may have been exposed to pesticides and other chemicals... Even if the crane flies themselves are safe for the dragon to eat, they may be exposing him to chemicals... And parasites, for that matter. It's all around not a good idea to feed wild-caught bugs.
Q:analysis of jib crane?
I would suggest that you delete this question and submit a new question with enough details for someone to give you an answer. This is not a question I can give you much help on
Q:Origami Crane?
These okorder.com It takes quite a few tries to get it right, but once you do it is easy.
Q:We have a whooping crane living in the bayou.?
Want to help? Don’t feed them, which draws them deeper into dangerous urban areas. And try to keep reflective surfaces covered. Following these tips could keep these majestic citizens a little safer. In 2002, the Florida Fish and Wildlife Conservation Commission made it illegal to feed sandhill cranes. Why Is Feeding Cranes A Bad Idea? Cranes fed by humans can become aggressive toward people. In several instances, children have been attacked by cranes. Cranes fed by humans also have been known to damage window screens and do other property damage. This behavior is probably a response of the birds to seeing their reflection, bringing out a territorial defense behavior (scratching at windows or shiny automobiles). Cranes also are more likely to tangle in human garbage in areas populated by people. Cranes attracted to people's yards for feed are put at risk as they walk across roads. Many sandhill cranes are killed each year on Florida roads. Cranes are also more likely to crash into power lines in urban areas where such aerial hazards are concentrated. Attracting cranes to urban areas increases the threat of predation (especially to young cranes) by dogs or cats. Further, the cranes' diets, which normally are quite diverse, are disrupted when they eat one food item (such as corn), consistently. Heavy pesticide use in urban lawns also is of concern. Young sandhill cranes have died from pesticide poisoning. It's Never a Good Idea to Feed Wildlife People inadvertently put cranes in harms way when they attract these birds with feed. Florida sandhill cranes have an abundance of natural foods (insects and small animals) and they do not need handouts from humans. There are many reasons why cranes should not be intentionally fed by humans, so I hope this gives you a few you can communicate to these well-intentioned people. The bottom line message: For the good of the cranes, please do not feed them.
Q:What is the work done on the beam by the crane? What is the work done by the force of gravity on the beam?
the work done on the beam by the crane = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer work done by the force of gravity on the beam = 1265 * 9.81 * 26 + 1265 * 9.81 * 0 = 322651 J answer
Q:How does a climbing or tower crane work?
They add extra stages from the bottom. A tower crane is erected from a boom assembly, first and second tower sections of different cross section, and a base in a sequence of steps in which the boom assembly is mounted on a hollow climbing section dimensioned to be received in each of the larger second tower sections and defining a cavity dimensioned to receive each of the first tower sections. One of the latter is secured on a base in upright position, and the upright section is received in the cavity of the climbing section which is then raised relative to the first section and enveloped by one of the second sections. The enveloping section is secured to the base and the raised climbing section for supporting the climbing section whereupon the first tower section may be released from the base, raised, and secured to the second tower section. The climbing section may then be raised relative to the first tower section to permit the installation of another second section, and the procedure repeated, until all second or larger tower sections are superimposed on each other, the one first section being ultimately attached to the topmost second section. When the climbing section is raised relative to the attached first section, another first section may be superimposed on the one first section and the procedure repeated until the slimmer portion of the tower is assembled from superimposed first sections. Ultimately, the boom assembly is attached to the topmost first tower section, and the climbing section may be removed or stored for further use on the wider, lower tower portion.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range