Tower Crane TC5516 Fast Delivery Factory

Ref Price:
$20,000.00 - 80,000.00 / unit
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 6T Maximum Lifting Height(M): 141.5M Rated Loading Capacity: 1.0T
Span: 50M Rated Load Moment: 62T.M

Product Description:

Detail of Tower Crane

 

Feature:Tower Crane 

Condition:New         

Model Number:TC5516(QTZ100) 

Place of Origin: China (Mainland)       

Brand Name: CMAX     

Certification: ISO,CE 

Warranty: 1 Year       

Application:Building,Construction,Industrial 

 

Main Features of Tower Crane

 

Our tower crane is self-erecting and wall-attached tower crane, in addition to it's advanced parameters, reliable performance, well-looking appearance, and excellent quality.

 

It has characteristica such as long boom, largeworking coverage, hydraulic rising, and tandem mounted tower body.

 

It's design idea shows advantages including simple structure and good applicability, convenient maintainability, and lower price at the same time to emphasize meeting the requirement from construction units at different levels.

 

It's lifting height is obviously increased thanks to its self-erecting and wall attached function.

 

It is applicable for construction of different industrial, commercial, office, and civil building lower than 220m, and becomes an ideal service-building machine at home.

 

Specification of Tower Crane

 

Technical Sheet for TC5516

 

Free standing height (m)

44

Max height with attachment (m)

150200

Working range can be adjustedm

455055

Min working rangem

2.5

Max lifting capacityt

8

Tip load @ 55mt

1.6

Hoist mechanism

Falls

2

4

Lifting capacityt

02

04

04

08

Speedm/min

080

040

040

020

Motor

YZRWFc250M-4/8     30/30KW

Trolleying mechanism

Speedm/min

12/27/53

Motor

YZTDE132L-4 /8/16   3.3/2.2/1.1KW

Slewing mechanism

Speedr/min

00.6

Motor

YZR132M2-6-3.7KW×2

Climbing speedm/min

0.5

Counterweightt

17.6

Mast section sizeL×W×Hm

1.6×1.6×3.0

Working temperature

-40+60

Total power (KW)

42

Power supply requirement (KVA)

190KVA for generator

Cable type ( within 40 meters from site power source to lower

electric box of tower crane )

50mm23+2, 5 cores

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A

 

Loading diagram

 

55m jib length

R m

3.1—13.5

17

22

27

33

37

45

47

50

52

55

a=2

4t—24.65m

3.61

3

2.61

2.38

1.95

1.8

1.72

1.6

a=4

8t

6.2

4.62

3.41

3

2.61

2.38

1.95

1.8

1.72

1.6

50m jib length

R m

2.5—15.17

19.65

22

25

27.4

33

38.5

42

47

50

a=2

4t---27.6m

3.22

3

2.71

2.37

2.2

a=4

8t

6.2

5.53

4.76

4

3.22

3

2.71

2.37

2.2

 

45m jib length

R m

2.5—15.17

22

25

27.4

29.8

33

38.5

40

42

45

a=2

4t

3.65

3.22

3

2.87

2.71

2.5

a=4

8t---15.17m

5.53

4.76

4.2

3.65

3.22

3

2.87

2.71

2.5

  

Images of Tower Crane

 

Tower Crane Max. lifting Weight 10T  in China

Tower Crane TC5516 Fast Delivery Factory

Tower Crane TC5516 Fast Delivery Factory

Tower Crane Max. lifting Weight 10T  in China

 

FAQ about Tower Crane

 

Q: What serice you could provide?

A: Providing timely delivery, standby engineers are ready to slove any of your problem

    Providing all-embraced warranty of products quality, worksite installation guidance

    Providing ample spare parts and training of operation and maintenance

    Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

 

Q: What kind of steel used for  tower crane ?

A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.

 

Q: What about our  tower crane  warranty?

A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.

 

Q: What is 3 main mechanism of the  tower crane ?

A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.

 

Q: Can you equip with light on  tower crane  jib, monitor, remote control and anemometer?

A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:When is the crane fly season over? I am really really scared of them?
I'm sure they are nothing to be afraid of. Despite their common names, crane flies do not prey on mosquitoes as adults, nor do they bite humans. You have a higher chance of being stung by a bee than being bitten by a crane fly. Just think of them a different way. Just think they are regular flies. Crane flies are a food source for many birds. They are also susceptible to fungal infections and are a food source for many other insects. Try getting a bird if you want to. :]
Q:what dose fury mean and craned?
Q:How is a Crane built upwards and how is it dismanteled ?
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q:What shrine in japan takes 1000 paper cranes?
The Hiroshima Peace Park. I've been there, it is very moving.
Q:Does anyone have any info on John B. Crane?
Do you mean the Lecturer John B. Crane of the Redpath Chautauqua Collection? Thats the only one I know.
Q:Origami crane word problem?
Paul does 100 cranes in 5 hours So in 1 hour he does 20 cranes In 3 hours he does 60 cranes and balance 40 cranes Jon does Jon = 40 cranes in 3 hours So 100 cranes = 100/40 X 3= 7.5 hours ANSWER
Q:Are steam cranes still used to clear train derailments?
No, they don't. They have to use road cranes - think of the accident at Grayrigg some while back. They had terrible trouble clearing the line as heavy lifting equipment had to be brought quite a distance over muddy fields. I seem to remember special temporary roads had to be laid. Similarly with the freight accident in Scotland a few weeks back, roads were closed, again whilst wreckage was cleared.
Q:How do people move cranes?
They are broken down into smaller unit pieces and are transported by truck or rail.
Q:NYC crane status post-Sandy?
My friend, that is a good question. According to the latest news conference from the Mayor, the crane's boom arm is secured to the structure. However, West 57th Street between Broadway and 7th Avenue is closed until farther noticed. In addition, the 57th Street-7th Avenue subway station on the N, R and Q Line is closed and trains are bypassing the station in both directions, according to the MTA. Good luck Native New Yorker
Q:How do cranes get from one construction site to another without hitting streetlights, wires, car, buildings?
They dodge by the stuff as they fly along. Duhhh

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range