Tower Crane TC5516 Construction Equipment Wholesaler Sales

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC5516 Description:

1.CMAX Tower Crane TC5516  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC5516  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC5516 has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC5516  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC5516  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC5516  Parameter:

 Max. working range 55m, tip lifting weight 1.6T and Max. lifting weight 8T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 44

Max height with attachment (m) 150

Working range can be adjusted (m) 44、50、55

Min working range (m) 2.5

Max lifting capacity (t) 8

Tip load @ 50m (t) 1.6 


Tower Crane TC5516   Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC5516 Diagram:

Tower Crane TC5516 Construction Equipment Wholesaler Sales

Tower Crane TC5516 Construction Equipment Wholesaler Sales


Tower Crane TC5516 Technical Sheet:

Tower Crane TC5516 Construction Equipment Wholesaler Sales

Tower Crane TC5516 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC5516 for example, the first two letters “TC” means Tower Crane, “55”means jib length is 55 meter, and the last two letter “16” means the tip load is :1.6 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to install the jack up tower crane 30How to install the jack up tower crane?
Since it is self lifting, as the name suggests, it is on its own power that no other crane can rise. It has a special elevated section, a hydraulic device, the upper section rises, the middle empty time section, with his arm to be added to the festival hanging near the artificial it fixed, so that a section of the rising of the. Is to support themselves, and then in the middle plus standard section.
Q:Estimating crane size...?
well I'm not sure but need to over estimate for safety cause there are all ways mitigating forces @ play when using cranes be safe first dude you dint want to be sued for being cheap and if yo do good work word will get around
Q:a crane 10 is moving across a frictionless surface at 3/s. if you wish to bring the crate to a stop, how much?
If an object with mass 10kg is moving at x m/s it's Kinetic energy is ½mv² =½×10 kgm²/s² = 5x² Joules Example: 10kg @ 4m/s Ke = ½ (10kg)× (4m/s)² = 80 Joules
Q:how do you make an electromagnet crane?
For okorder.com/
Q:What kind of equipment must be installed on luffing trolley of horizontal luffing tower crane?
The car must have a support wheel to prevent the trolley from hanging in the middle.
Q:is this a grey crowned crane?
yes it has to be
Q:how can we minimize energy losses of a crane to reduce the impact on the environment?
No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
Q:how do you put the battery in the crane stock for airsoft guns?
You first need a crane stock battery, as a normal battery won't fit in just one side of the crane stock. When you but the battery, you'll have two or three clusters of cells. Begin experimenting with the cord placement in the stock, by putting one cluster on one side and one (or two) on the other. You'll see what I mean when you get the gun. That's all there is to it, just a little experimenting.
Q:The Open Boat by Stephen Crane-setting and relationship to the theme?
I can't tell you what to write or what you see as the theme but one of the themes in the book is man versus nature. Maybe you could discuss the setting as part of nature and what Crane seems to be saying about it. One thing that might help is a poem Crane wrote which explains how he sees things. Maybe you already know it. It's titled A man said to the universe A man said to the universe, Sir, I exist! However, replied the universe the fact has not created in me a sense of obligation. An indifferent universe. Not unlike how Thomas Hardy saw things.
Q:Why did Dr. Crane work for Ra's Al Ghul and with Falconie?
Crane was a criminal and a bit of a nut. Just like any super villain. He had a fetish for fear. Ra's used him because Crane could make best use of the blue flower drug, and they need Falconie to set things up. Ra's would have gotten rid of both after he was done.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range