• TOWER CRANE TC5510S System 1
  • TOWER CRANE TC5510S System 2
  • TOWER CRANE TC5510S System 3
  • TOWER CRANE TC5510S System 4
TOWER CRANE TC5510S

TOWER CRANE TC5510S

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q:How to explain and classify the types of tower cranes? What do QTZ80 and Q5510 mean?
P---- represents flat head (without tower top), and T----- is tower crane,TC------ is the English abbreviation of tower crane, that is tower crane
Q:How do tower cranes rise?
The weight and concrete foundation shall be made in advance and marked, and the ground ground endurance shall be no less than 20T per square meter. The chassis and standard sections are then assembled on this basis. The standard section of tower crane is the main part of the main part of tower crane. It is also the main role of heightening the height of tower crane". In the construction process, tower crane accompanied by the rise of buildings, naturally need to heighten. When the tower is hoisted, the upper frame is raised upwards with the jack up, so that there is a space between the tower body and the frame, and the standard section of the tower body is installed in the space. In this way, the purpose of the tower crane is realized.
Q:What is the safe distance of a tower crane to the surrounding buildings?
JGJ160-2008 "construction site mechanical equipment inspection technical regulations" on the 46 page clearly written, safety distance shall not be less than 0.6 meters,
Q:I am in dyer need of a camera jib wih very little budget and/or tools to build one. I am wondering if i can use a cymbal stand for a crash cymbal as a camera jib? My idea is to modufy it by attatching a small piece of wood to the top screw where you would put a cymbal the screw in an L piece (metal) to it or attach it ti the arm of the stand and just snigly fit it so as the arm is raised and lowered the L pice compensates and stays strait. i would attach the camcorder to the L piece with a 1/4 inch screw and washers. i also need the arm to move smoothly will this work with a crash stand. all advice i am grateful for thanks
The angle of the cymbal on the stand determines the amount of vibration being transferred to the stand. A cymbal on a boom arm verses a straight stand, a heavy tripod verses a lightweight base sounds drastically different. Boom stands can make some cymbals rumble. When boom cymbals stands are somewhat close to staight stands, arm placed close to 180 degree, the cymbal will rumble less.
Q:ok so i have to us my phone so just give me instructions no links no youtube videos cause my phone cant support them and my phone may not be able to load some of the links
You are asking for a lot but I have seen you request this a number of times, so I will do it...a sucker born. 1. Valley fold the paper in half so it makes a triangle. With the long side held away from you, valley fold the triangle in half again. 2. Lift the top triangle and valley fold it so that its top point meets its bottom point. Unfold the crease you have just made. Put your fingers inside the top triangle, open it up, and flatten it so it forms a square. Turn the paper over and fold and flatten the remaining triangle in the same way. 3. Make sure that the open ends of the paper are pointing down. Valley fold the top layer of both sides in to meet the centre crease. You will now have a kite shape. 4. Valley fold the top point of the kite down and crease well. Unfold the crease you have just made. 5. Open the sides of the kite by unfolding the flaps you made in Step 3. Lift the top layer of the kite's bottom point up so the paper bends at the crease you made in Step 4. Push the outside edges of the paper in to meet the centre line. Then flatten the figure so that you have a long diamond shape. 6. Turn the figure over and fold a kite shape on the remaining side as in Step 3. Repeat Steps 4 and 5 on this side. You will now have a two-sided long diamond. The bottom half of the diamond is split in two. 7. Valley fold the top layer of both bottom edges in to meet in the middle. Turn the figure over and repeat on the other side. 8. To make the crane's neck and tail, valley fold each half of the bottom section out to the sides. Crease well. 9. Unfold the right crease you just made and make an inside reverse fold. Repeat this step on the left side. 10.To form the head, fold down the end of the neck. Unfold this crease and inside reverse fold the head. 11.Hold one of the crane's wings in each hand. Blow hard into the opening on the underside of the figure and gently separate your hands. You crane will puff up and be ready to hang.
Q:What type of tower crane does not include tower crane in variable amplitude mode?
Tower crane, tower crane.Tower crane according to its different types, there are the following classification methods.(1) divided by structure type of fixed tower crane by connecting a fixed tower in the foundation or structure, tower crane lifting operation.
Q:A man said to the universe:“Sir, I exist!“However,” replied the universe,“The fact has not created in meA sense of obligation.”
Crane was a wonderful poet and author; I have that poem written in one of my journals from long ago. I think he was pointing out that we seek answers and protection from the world outside our bodies when we shouldn't bother with that. The universe is only a backdrop in our play, and we are the ones with power.
Q:In the poem "The Wayfarer”, what is Crane's ironic comment on the pursuit of truth?
I am a big fun of Rayban as well. I always buy from this site...
Q:in the pit, i just lost my bike cuz johnny's crew tripped me with a chain. so no bike, and i only have my slingshot, skateboard, and some other useless stuff. dont say i can use my firecrackers or stik bombs cuz i dont have any in this pit. Also, my friend,... whatever his name is, he's there on top of the cars and junk and in the beginning he says something about a crane but i cant hear him. so everytime i pass under the crane... my conrtoller vibrates because the crane is supposed to pick up cars and such because its magnetic. so i already tried to see if when johnny goes under the crane it might pick him up because hes on a bike but it doesnt work. and i cant take him off of his bike and steal it either. i was thinking that would work because then whatshisface could pick me up with the crane.and when i try to hit him with my slingshot, it just doesnt work it would take me forever to knock him out with that puny little thing and he has a crowbar and he knocks me out so easily. HELP
What you have to do is knock out all of Johnny's friends who are above you shooting things down at you. Use your sling shot to knock them out. It will take 2-3 shots for each guy. This will allow your friend to run around to the magnetic crane and start it up for you. Once Johnny goes under the crane, he will lose his bike. Then he'll be on foot, and will be a little easier to kill. Try to make sure you keep as much energy as you can while you're getting rid of Johnny's friends (run around alot so what they shoot at you won't hit you), because you'll need the energy to finish off Johnny. Good luck!!

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords