• TOWER CRANE TC5013S System 1
  • TOWER CRANE TC5013S System 2
  • TOWER CRANE TC5013S System 3
  • TOWER CRANE TC5013S System 4
TOWER CRANE TC5013S

TOWER CRANE TC5013S

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Q:Lifting a cylindrical steel vessel kind of thing is required to change it's postion from vertical to horizontal for cutting into pieces. The cranes deployed are indivisually operated.
Need manufacturer model of crane and weight size of item. Rotating should not be a problem if you call the manufacturer of the crane and get the lift weight approved.
Q:I see crane flies everywhere but I've never seen them eat anything.
Crane flies usually don't eat after becoming adults. They usually just breed and die. If they do they would eat nectar. As larvae they eat what most larvae do roots and other vegetation in the soil. 2 0 Comment
Q:Jon and Paul are folding origami cranes. If Paul works alone he can fold 100 cranes in 5hours. together they can do the same job in 3 hours. how much time would it take for Jon to fold 100 cranes alone? Please show your work. :)
Paul does 100 cranes in 5 hours So in 1 hour he does 20 cranes In 3 hours he does 60 cranes and balance 40 cranes Jon does Jon = 40 cranes in 3 hours So 100 cranes = 100/40 X 3= 7.5 hours ANSWER
Q:What are the four major moving mechanisms of a tower crane?
Four big bodies of tower crane: lifting, slewing, luffing and walking.
Q:A crew built this huge crane to build an office building next to my house.... There is a huge flag hanging from the top of it.... Why does the construction company do this???
Wind becomes an issue when lifting large loads with a crane that has a long boom. On some large cranes you may see an anemometer near the end of the crane's boom. The crane operator will usually not make certain heavy lifts if the wind speed is too high. If the crane does not have an anemometer, they may be using a flag to tell them the direction of the wind and to give them a rough estimate of wind's speed.
Q:please tell me where you found the info.
The okorder /
Q:I just watched hunger games, and in the end Secana Crane was locked in a room with nightlocks, but why did they do that to him? what did he do to get killed?
President Snow killed him because he allowed the games to break its rules for the first time ever by having two victors. What Katniss and Peeta did was a sign of rebellion and the Capitol relented by letting both of them live, otherwise that there would be no victor. That was not supposed to happen and President Snow had already warned him to stop any signs of rebellion prior but Crane let it happen. Someone needs to be held responsible and since Crane is the gamemaker, he has to die. This is to show that no one holds greater power than Snow over the districts and Capitol and no one should defy him. Rebellion leads to death, no matter what your role is or how you might have contributed to it.
Q:How many meters is the tower crane installed on the edge of the deep foundation pit?
Hello, it depends on your design requirements, generally have the pit bottom, straight out of a tower crane base do. Or elevator shaft is also more. Generally, the foundation pit is shallow foundation pit or relatively small foundation pit.
Q:Im looking for more information on Overhead Cranes!?
Advantages of Overhead Crane for Professionals When large materials have to be handled in the building, construction and mining industries, there are several types of equipment that would be used. One of such equipment is the overhead crane, and because of its size, it is conspicuously seen at construction or mining sites. Not only does it have a domineering figure but it is also a very versatile equipment for moving heavy materials from one point to the other. This equipment occurs in many forms and the various forms it has, makes it adaptable to many environments. There are other types of equipment that are available for lifting, but a crane is the preferred choice of many people. I got most of this information from www.hoistandwinch .uk There are several reasons people in the construction and mining industries would choose a crane over other equipment that are used for lifting. With overhead cranes, there would be absolutely no need to clear aisles before materials can be moved. Forklifts or fork trucks could have their paths blocked and a lot of time and energy would have to be diverted to clear an aisle. Obstructions that could even make you suspend important projects are irrelevant to overhead cranes because they would easily make it around them without any form of difficulty. It is therefore possible to arrange your plant floor the way you would want it to be for your business, without thinking about obstructions to the lifting and movements of materials with cranes to do all the task for you.
Q:How do you test the tower crane? Myopia can span tower crane? Brother here, please all heroes.
A tower crane installation scheme, 1, compilation basis, project overview, working environment, 2 workers and 3 endurance calculation and installation equipment for 4, installation procedures, methods and requirements for 5, commissioning record 6, two safety technical measures, safety technical disclosure, three installation foundation concrete test report of four, the tower crane installation and acceptance of table five, safety supervision station issued a permit for six, seven, demolition demolition project safety technical clarificaiton tower crane installation scheme project name: preparation: position (title): Approval: job (title): the construction unit: tower crane installation demolition project, the preparatory work before construction: 1. The tower crane installation position, according to the effective range of the construction requirements, site conditions and the role of tower crane, convenient installation and disassembly, the tower crane configuration in 17 axis to 18 Between the axis, away from the outer wall of 5 meters, with 11 standard section. 2, the basis of the principle, the use of concrete foundation, strictly according to random basis drawing. 3, the examination of concrete pressure report, tower foundation has been completed by design and construction, the safety group acceptance, the basic test block delivery, after the test pressure qualified, must be installed. 4. The installation site is level and the channel is repaired. 5, transport parts admission

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords