TOWER CRANE TC5013C

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
12 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Technology is the drive for business development and production equipment the assurance of product quality. In the large-scale concentrated production, the stability and uniformity of product quality plays an essential role. The company constantly improves processing equipment. The automatic assembly line ensured quality stability and maximally reduced adverse effect of personal factor to the product quality. As a result, the one-time qualification rate of the products is improved and the company is able to win continuous trust from customers。

1.    The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length. 
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

The construction hoist product  produced has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Crane fly and Mosquito Hawk?
So called mosquito eaters, mosquito hawks, or skeeter eaters. Unlike mosquitoes, crane flies are weak and poor fliers, so they can be caught easily and without much effort. Despite their common names, crane flies do not prey on mosquitoes, nor do they bite humans. Adult crane flies feed on nectar and consume roots such as turf grass as in backyard lawns.(So they won't be preying on your rabbits) Their life cycle is very brief, so you shouldn't have to worry about them multiplying. They are also weak and poor fliers, so they can be caught easily.
Q:red-crowned cranes....?
In the spring and summer, the Red-crowned Crane breeds in Siberia and occasionally in northeastern Mongolia (i.e., Mongol Daguur Strictly Protected Area). Normally the crane lays 2 eggs, with only one surviving. Later, in the fall, it migrates in flocks to Korea, Japan, China, Taiwan, and other countries in East Asia to spend the winter. All Red-crowned Cranes migrate, except for a flock that is resident in Hokkaidō.
Q:how do they get the construction crane onto the the tall buildings?
If the crane has a mountaineering physique it is going to diminish itself down, removing its very own tower sections till it somewhat is low adequate to be bumped off by potential of a cellular crane. If it doesnt a smaller crane stated as a derreck crane would be set up on the roof of the development, it is going to take the tower crane dowm, as quickly because it somewhat is bumped off the derreck crane is disassembled and taked down by potential of the homes raise
Q:How do they erect those giant cranes used for constructing tall buildings?
They hire the Egyptians that are on lay off from building pyramids to build the cranes.
Q:I need help getting back to crane in maplestory?
I don't really understand what you're saying, but I'll try to help. You can only enter the crane every few minutes or so (I'm not sure of the exact time). When the crane is closed, there will be a gray door barring the way. When it is open, it will have a greenish-yellowish open doorway. You have to wait for it to arrive and open.
Q:Do cranes eat squirrels?
I do love the variety of questions that crop up on YA! The things you learn.... My immediate thought was, Sandhill Cranes do not eat squirrels. Then I thought, well, they eat fish. So I looked it up: Yes, Sandhill cranes eat snails, insects, small reptiles, amphibians and RODENTS (that's squirrels, folks!).
Q:container crane truss design?
Jimmy: The American Society of Mechanical Engineers (ASME) produces design standards for many types of cranes: see the link below. Many crane owners, licensing and governmental authorities having jurisdiction over cranes require design, fabrication and testing to ASME standards.
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:Why is there as much evidence of Icabod Crane, as there is of god??
Ichabod wasn't headless until Chuck Norris roundhouse kicked him.
Q:Money Origami - Crane Ring?
Sorry I can't give you the specific information you want. This site might link you up to a site that is more helpful. members.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range